
Printer Startup and Quick Test Print
The purpose of this section is to execute the following:
Power the 3D printer sysem on.
Load support and build material cartridges into the material delivery modules.
Install a print platform.
Perform a successful Quick Test Print.
Remove the finished parts from the printer.
Empty the waste drawers.
Switch the 3d printer system off.
Completion of this process will familiarize you with all of the “basic” 3D printer system
operations needed to build parts on the printer. It is strongly recommenced that you
complete this section before moving on to larger more sophisticated builds.
Power the Printer ON.
Connect power cord to the printer (A) and plug into facility receptacle. 1.
Place power switch (B) located at the rear of printer, to the ON position. 2.
Wait 2.5 hours for printer to warm up before attempting to start a build job.3.
Because the materials also require a warm up period, proceed to the next step of adding4.
material to the material delivery modules.
NOTE: Build files can not be submitted to the printer while it is warming up.