Loosen vacuum breaker to valve.
Mount xture
Pull ush connection forward through wall.
Pre-install escutcheon and ttings in the following order:
1. Wall trim plate
2. Coupling
3. Friction ring
4. Gasket
5. Escucheon
Connect coupling (2) to spud, wrench tight.
Slide wall trip plate against wall.
Re-connect vacuum breaker to valve.
7
FOR REAR SPUD URINALS
F, K
F
G
H
I
J
K
L
FOR FLOOR MOUNT REAR SPUD FIXTURES (WATER CLOSET)
Adjustable Tube
Coupling
nut
Poly washer
Elbow
Taper towards
elbow
Coupling nut
A
B
Cut F-1 ush connection to length as needed for particular rough-in.
• Consult rough-in
Connect F-1 ush connection and adjustable tube to the elbow
using coupling and poly washer. Apply Loctite® to tube, tighten
coupling securely.
F-1 Flush Connection
Poly Washer
CInsert V-651 vacuum breaker into V-560-A vacuum breaker casing.
Attach to valve hand tight.
Attach ush connection to vacuum breaker.
D
EFor hardwire use only: insert conduit and tightly secure it to the wall
box. Run transformer wires through the conduit to the wall box.
NOTE: TRANSFORMER NOT PROVIDED. IT IS VERY
IMPORTANT THAT THE OUTPUT VOLTAGE OF THE
TRANSFORMER BE 6VAC FOR THE UNIT TO FUNCTION
PROPERLY. SLOAN EL-386 OR EL-451 IS RECOMMENDED.
Finish wall. Use supplied mud guard to protect valve during nishing
process.
• Use two (2) mounting screws, if needed, to hold mud
guard to wall box
• Use the marks on mud guard to make sure nished wall
is between 3 ¼” and 4 ¼” from the center line of the pipe.
Vacuum Breaker
V-560-A vacuum
Breaker casing
Flush Connection
Wall
opening
1. If needed, trim urinal ush tube.
2. Slide 3/4" coupling over urinal ush tube.
If cutting tube, thread adapter rst, then cut. After
cut, remove adapter to help chase/clean threads.
3. Thread brass ange onto urinal ush tube.
Amount of thread engagement will depend on rough-in.
Use provided Loctite to secure and seal ange.
4. Apply Loctite to tube threads (completely around tube)
where ange will sit on tube. Then thread ange into Loctite.
Ensure Loctite is visible on both sides of ange. Allow time
for Loctite to "set", approx. 30 minutes. #4.5 Slide F2
coupling over urinal connection tube, and then install urinal
connection tube to urinal spud and tighten spud coupling.
5.Secure urinal ush tube to elbow using
1-1/2” gasket and friction ring.
2
3
Adjustable
Tube
Taper toward
elbow
Coupling nut
Coupling
nut
Poly
washer
Elbow
Note: Wall plate opening must be a
minimum 7-3/8” wide x 8-3/8” tall
(187 mm wide x 213 mm tall) to
maximum 7-5/8” wide x 8-5/8” tall
(194 mm wide x 219 mm tall)
H. Finish wall. Use supplied mud guard to protect
valve during nishing process.
• Use two (2) mounting screws, if needed, to hold
mud gaurd to wall box.
• Use the marks on mud guard to make sure
finished wall is between 3 1/4" and 4 1/4" from the
center line of the pipe.
NOTE: wall plate opening must be a minimum 7-3/8"
wide x 8-3/8" tall (187 mm wide x 213 mm tall) to
maximum 7-5/8" wide x 8-5/8" (194 mm wide x 219
mm tall).
1. Hang urinal on mounting bracket.
2. Loosen vacuum breaker to valve.
3. Make spud connection behind the wall.
4. Re-connect vacuum breaker to valve.
2, 4
3
Loctite must cure for
24 hours before turning
on water; otherwise the
Loctite will wash out
and joint will leak.