Dyacon MS-100 Manuel utilisateur

MS-100
Weather
Station
Quick-start
Guide For WiFi Stations
57-6068 Rev A

DYACON Quick-start Guide
Intentionally left blank.
Page 2/21

DYACON Quick-start Guide
Contents
NOTICES....................................................................................................................................................4
© Copyright 2018 Dyacon, Inc......................................................................................................4
Manufacturer..................................................................................................................................4
1.0 MS-100 INTRODUCTION..................................................................................................................5
1.1 Scope...............................................................................................................................................
2.0 CONFIGURATION DATA FORM....................................................................................................6
3.0 MECHANICAL SETUP AND INSTALLATION.............................................................................7
3.1.1 Required Tools......................................................................................................................7
3.1.2 Mechanical Setup and Assembly Summary.........................................................................8
3.1.3 Set Vane North Position........................................................................................................9
4.0 IRE CONNECTIONS....................................................................................................................10
4.1 Wire Stripping and Mounting.......................................................................................................10
4.2 Connection Diagram.....................................................................................................................11
5.0 CONTROLLER CONFIGURATION..............................................................................................12
.1.1 General Settings..................................................................................................................12
.2 Setup WiFi....................................................................................................................................12
.2.1 Set Network Name And Password......................................................................................13
6.0 DYACONLIVE...................................................................................................................................15
6.1 Setup DyaconLive.........................................................................................................................1
6.1.1 DyaconLive User Registration............................................................................................1
6.1.2 DyaconLive Configuration.................................................................................................1
6.1.3 DyaconLive Report Interval...............................................................................................16
6.1.4 DyaconLive Test.................................................................................................................16
7.0 SITE SELECTION.............................................................................................................................17
7.1 General Principles.........................................................................................................................17
7.2 Weather Station Siting..................................................................................................................18
7.2.1 Instrumentation Considerations..........................................................................................18
7.2.2 Solar Power Considerations................................................................................................18
7.2.3 Cable Considerations..........................................................................................................18
7.2.4 Wireless (Cell Phone) Considerations................................................................................18
7.3 Airport Siting................................................................................................................................18
8.0 DOCUMENT REVISION HISTORY..............................................................................................21
Page 3/21

Notices DYACON Quick-start Guide
Notices
© Copyright 2018 Dyacon Inc.
All Rights Reserved
This publication is protected by copyright and all rights are reserved. Any reproduction of this
manual, in part or in full, by any means, mechanical, electronic, or otherwise, is strictly
prohibited without express written permission from Dyacon, Inc.
The information in this manual has been carefully checked and is believed to be accurate.
However, Dyacon, Inc. assumes no responsibility for any inaccuracies that may be contained in
this manual. All information is subject to change.
Trademark Acknowledgments
Dyacon® and DYACON® is a registered trademark of Dyacon, Inc, a Utah corporation.
Dyacon WSD-1TM, WSDTM, TPH-1TM, TPHTM, CM-1TM, CMTM, MS-120TM, MS-130TM, MS-
13 TM, MS-140TM, MS-1 0TM and Tripod-1TM are trademarks of Dyacon, Inc.
All other trademarks are property of their respective owners.
Manufacturer
Dyacon, Inc.
1770 Research Park, Suite 168
Logan, UT 84341
US
Page 4/21

DYACON Quick-start Guide MS-100 Introduction
1.0 MS-100 Introduction
1.1 Scope
This document is an abbreviated description of station setup and configuration. Refer to the
detailed sections in this manual or to sensor documents for further information.
The information contained in this manual is advisory only. Users are responsible for their own
safety and the installation requirements for their application.
Dyacon meteorological (met) stations are based on a control unit, or data logger, that acts as the
“brains” of the weather station. All sensors, power, and I/O devices connect to the control
module (CM).
CM-1 is a component of MS-100 series weather stations with several preconfigured version:
MS-120, MS-130, MS-13 , MS-140, and MS-1 0. These stations differ principally by the
sensors that are pre-configured with the control module. Users may add, remove, or replace
sensors as their needs change.
This manual briefly covers site selection, station assembly, and general operation of CM-1.
Detailed information is provided in the respective product manuals.
Users should download the CM-1 Weather Station Control Module manual from Dyacon.com.
The manual is located in the documents section of the weather stations or controller page.
Videos are also available demonstrating the assembly and configuration tasks.
Page 5/21

Configuration Data Form DYACON Quick-start Guide
2.0 Configuration Data Form
Collecting the following information will help during configuration of the weather station
controller.
Parameter Value Notes
Station ID User-defined text field used to identify
the station in text messages and log files.
WiFi Network Name
(SSID)
Network Password
Logging Interval 1, 2, , 10, 1 , 20, 30, 60 min 10 min log interval = 10 months of data.
Station Altitude* meters
DyaconLive⸸ 1, 2, , 10, 1 , 20, 30, 60 min 10 min interval recommended.
Weather Underground
ID**
Weather Underground
Password
Weather Underground
Rate
10, 1 , 20, 30, 60 min
Email To**
Email From
Email User Name
Email Server
Email Password
Email Port 2 2 MS-100 series does not use SSL/TLS
*Absolute air pressure is normalized to mean sea level. Altitude is required for this calculation.
Leave at zero (0) for absolute air pressure reported to Weather Underground and SMS text
messages.
⸸ DyaconLive is a webportal for Dyacon weather stations that charts measurement data and
operational parameters of the weather station. Contact Dyacon for your unique login.
** Feature implementation not required. See the respective section for more information on the
feature.
Users may find it convenient to configure the controller on the bench before placing it in the
field. To do so, merely plug in the battery and operate the unit without sensors attached.
Everything but, Set North, can be done on the bench.
Page 6/21

DYACON Quick-start Guide Mechanical Setup and Installation
3.0 Mechanical Setup and
Installation
3.1.1 Required Tools
Installation tools depends on the mounting location. For purposes of this manual, it is assumed
that CM-1 will be used with Dyacon MS-100 weather stations and mounted on Dyacon
Tripod-1.
Control Module
8 mm ( /16 inch) socket for band clamps
Phillips #2 driver for Control Module cover
0.10” to 0.13” (2. mm to 3. mm) wide slotted driver for screw terminals
Tripod
7 mm open-end wrench for guy cable clips
Hammer for stakes or tools appropriate for other mounting method, as required.
WSD-1
Phillips #2 driver to attach wind vane and pole set screw
TPH-1
8 mm ( /16 inch) socket for band clamps
Crossover
8 mm ( /16 inch) socket for band clamps
Solar Panel Bracket
8 mm ( /16 inch) socket for band clamps
Rain Gauge
8 mm ( /16 inch) socket for band clamps on bracket
4 mm ( /32 inch) hex wrench (included with gauge) to remove rain gauge top.
13 mm (9/16 inch) open-end wrench or adjustable open-end wrench for leveling screws.
Ot er
Wire cutters for electrical cable prep and cable ties
Wire stripper for 24 AWG to 22 AWG wire
Page 7/21

Mechanical Setup and Installation DYACON Quick-start Guide
3.1.2 Mechanical Setup and Assembly Summary
The following is a summarized setup procedure. Videos are available at Dyacon.com
1. Erect Dyacon Tripod-1 with only one mast segment in place.
2. Loop guy cables over top of mast.
3. Assemble WSD-1 vane.
Remove the Vane axis screw.
Insert the vane and counter weight with the end
pointing away from the set screw hole.
Insert and tighten the axis screw.
4. Attach WSD-1 to top of mast.
Orientation does not matter. The North alignment
position will be set electronically, see step 20.
. Attach crossover to the top of the center mounting pipe (tripod hub) and secure with two
band clamps.
The solar module mounting bracket can be secured on the opposite side of the pipe with the
same band clamps as used for the crossover. The solar module bracket should be positioned
toward the south, if in the northern hemisphere or toward the north if in the southern
hemisphere.
6. Attach CM-1 enclosure below the crossover using two band clamps.
7. Insert pipe into horizontal fitting of the crossover and tighten with two band clamps.
8. Fit TPH-1 onto end of horizontal pipe and tighten band clamp.
9. Attach solar sensor (pyranometer) to bracket. (Optional sensor.) The cable leaving the solar
sensor should be directed to the north.
10. Attach solar sensor bracket to TPH-1 by removing two wing nuts.
11. Seat solar power module onto mounting bracket.
12. Place soil moisture sensor and soil temperature sensor into ground and desired depth.
13. Bury rain gauge pipe.
14. Mount rain gauge to top of pipe.
15. Remove the rain gauge top and remove the rubber band securing the tipping
mechanism.
16. Open the control module by loosening the two front cover screws.
17. Feed each sensor cable through cable glands at the bottom of the enclosure and attach to
respective terminals.
18. Plug in the battery connector to the control module connecter. (For cable-powered systems,
attach 7 VDC to 24 VDC to the Battery connector.)
19. Attached the solar module to the solar power input.
20. Set North position on the wind vane before raising mast. (See instructions in 3.1.3.)
21. Attach cable ties to WSD-1 while raising the tripod mast to full height.
22. Bundle excess cable on the outside of the enclosure.
23. Secure cables with cable ties so that they route adjacent to the tripod structure.
24. Configure control module as required. (See the following section.)
Page 8/21
Image 3.1: Vane Fin On Same Side as Set Screw.

DYACON Quick-start Guide Mechanical Setup and Installation
3.1.3 Set Vane North Position
Press Select will enable Setup mode.
Press ▼ (Down) until Wind Dir is seen.
>Setup Wind Dir
Press Select to enter the Set New North configuration.
>Set New North
Manually hold or tape the vane in the desired position (magnetic or grid north, depending the
application.
Press Select to set the position as 0 degrees.
North Set
Continue holding the vane in the north position to validate the setting.
The display will show “North Set” momentarily, then return to the configuration page.
>Set New North
Clear Setting
Pressing Cancel twice will exit Setup mode and return to Acquisition mode.
By paging down one position, users will see the direction. The wind direction should show a
value near 0 or 360 deg.
Acquisition page after setting north.
1.2 m/s @ 0.1 deg
Gust: 0.0 st: 0
Page 9/21

Wire Connections DYACON Quick-start Guide
.0 Wire Connections
CM-1 utilizes pluggable terminal blocks. These connectors may be unplugged from the circuit
board and wired in a convenient position using a slotted screw driver.
4.1 Wire Stripping and Mounting
Wires should be stripped to about 7 mm (0.25 inch).
Care should be taken to ensure that there are no loose
strands when inserting wires.
Screw terminals should be firmly tightened and
checked as part of a routine maintenance program.
Page 10/21
Image 4.1: Wired for Dyacon Control Mod le
Image 4.2: Typical Installation
Ce manuel convient aux modèles suivants
1
Table des matières
Autres manuels Dyacon Station météorologique
Manuels Station météorologique populaires d'autres marques

National Geographic
National Geographic VA Colour RC Manuel utilisateur

Renkforce
Renkforce 1208067 Manuel utilisateur

Levenhuk
Levenhuk Discovery Report WA40 Manuel utilisateur

Instant Transmission
Instant Transmission MA 10410 Manuel utilisateur

Lutron Electronics
Lutron Electronics PHB-318 Manuel utilisateur

WAREMA
WAREMA EWFS Weather station eco Manuel utilisateur












