Clearfield Clearview xPAK Manuel utilisateur

Clearview Cassette xPAK
Installation Manual ______________________________________________________
Manual 019391 Rev A - Dec 2017

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
2
Clearview Cassette xPAK
Installation Manual _________________________________________________________
Manual 019391 Rev A - Dec 2017
Table of Contents
Application 3
Description 3
Technical Specications 3
Congurations 4
Parts List 6
Splicing in the xPAK 7
U-Mount 17
Connector Cleaning Procedure 18
Standard Warranty 21
Proprietary Notice 22
Technical Support 22

3
Clearview Cassette xPAK
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 019391 Rev A - Dec 2017
At rst glance, Clearview xPAK looks like any other LGX compatible package, but
upon closer inspection, technicians will see a new generation of innovation in the
delivery of terminated ber assemblies. Clearview xPAK is single-piece element in
which all required components for ber protection are integrated. It is shipped at
and simply folds to shape.
The Clearview xPAK supports two, four or six ports of patch and splice congurations. The compact 4” x 5” solution is
perfect for landing small count terminations at the ber delivery point. The kit comes with everything you’ll need: at
cassette, adapters, 1, 2, 4 or 6-ber 900 μm ½ meter assembly, splice sleeves, strain relief boot, grommet tape, zip ties and
universal mounting bracket.
Priced to allow eld personnel to carry quantities of Clearview xPAK Cassettes in the eld, xPAK is shipped at and
unassembled. At the deployment site, the technician will take the xPAK device, and following pictorial user instructions, will
assemble the device to match his eld requirements. Integrated into the footprint of the device, is an industry-compatible
splicing tray, which is then surrounded with ber protection elements that support either a two, four or six port ber assembly
as well as a range of optical component devices.
Clearview xPAK is the ideal ber management device when up to six bers are landed or an optical component device
is deployed in a remote location. Application environments include cell backhaul, business class service delivery, node
segmentation, ber exhaust in a eld pedestal, sub-station turn-up or ber-to-the-desk deployment.
Clearview xPAK
Dimension 1.14” H x 4” W x 5.38” D
Ratings Terminations are designed and tested to Telcordia GR-326; Cleareld® FiberDeep®
Guarantee: 0.2 dB insertion loss or less, exceeding industry standards
Backwards Compatible N/A
Material Durable polypropylene (impact plastic)
Connector Types Supports industry standard SC, LC, ST, FC and MPO singlemode and multimode
connectors
Meters/Feet of Slack
Storage
½ meter of 900 μm tight buffer ber used for internal splicing, 12-ber xPAK requires
ribbon splicing
Mounting Options Standard faceplate and LGX faceplate
Technical Specications
Engineered to land small port count ber assemblies and optical components
as conveniently and inexpensively as possible, the xPAK simplies ber
management to the level of a consumable good. Clearview xPAK can be
deployed as a stand-alone device, or with FieldSmart® Fiber Deliver Point
(FDP) products for a wide range of network environments.
Description
Application

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
4
Clearview Cassette xPAK
Installation Manual _________________________________________________________
Manual 019391 Rev A - Dec 2017
Congurations
Patch and Splice
The 6-ber splice tray molded into the xPAK tray is all that is
needed to deliver an integrated patch and splice application.
2, 4 or 6-ber 900 μm ½ meter assemblies are preterminated,
pre-loaded and slack stored inside the xPAK ready for splicing.
Patch Only
Regardless of the industry standard adapter or cable construction,
the pre-terminated length of OSP or IFC cable is pre-loaded within
Clearview xPAK for patch only congurations.
Optical Components
Optical components can be integrated into the Clearview xPAK.
Options include circulators, WDM and splitters from 1x2 to 1x6.
Plug-and-Play
MPO to 12-ber 900 μm assembly allows for plug-and-play by
mating MPO to MPO with pre-terminated multi-ber OSP or IFC.
Optional faceplate allows for a max of 8 SC connections.

5
Clearview Cassette xPAK
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 019391 Rev A - Dec 2017
Parts List

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
6
Clearview Cassette xPAK
Installation Manual _________________________________________________________
Manual 019391 Rev A - Dec 2017
Splicing in the xPAK
Remove the xPAK from its packaging. Unwrap the white twist
ties around the 900 micron bers and save them for later in
the process.
With a side cutters, snips, or sharp knife, carefully cut the
two adapter plates and 6 adapter plate plugs from the
plastic molded xPAK. Be sure to trim off any tabs or excess
molded material from all parts.
Note: Do not discard these pieces, as some or all will be
used later in the process.

7
Clearview Cassette xPAK
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 019391 Rev A - Dec 2017
Slide the ber through the strain relief
boot, and push the boot over 3ft (1m)
down the ber.
Fold the back portion and one of the side walls of the
xPAK up, and snap them together.
Note: If you are using the strain relief boot, install it in
the opening before snapping the back and side walls
together.
Snap the opposite side wall and back together.

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
8
Clearview Cassette xPAK
Installation Manual _________________________________________________________
Manual 019391 Rev A - Dec 2017
Mark the buffer tube with a permanent marker 3ft back
from the end.
Wrap one lap of grommet tape around the buffer tube
and trim the excess.
Open up the buffer tube after the grommet tape,
exposing the bers

9
Clearview Cassette xPAK
__________________________________________________________ Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
Manual 019391 Rev A - Dec 2017
Route the buffer tube under around the outer track
and under the ber management tab, then secure
the buffer tube into place using the provided zip
tie.
Route the bers 1 ½ turns around the inside track
and into the splicing area, then trim to length.
Trim Here

Direct: 763.476.6866 • National: 800.422.2537 • www.SeeCleareld.com • [email protected]
10
Clearview Cassette xPAK
Installation Manual _________________________________________________________
Manual 019391 Rev A - Dec 2017
Install the adapters in the correct adapter plate (Either standard or LGX plate). Plug the cable assembly into the back of the
adapters.
Temporarily install the faceplate onto the
xPAK.
Route the 900 micron bers 1 ½ turns in
the opposite direction of your incoming
bers and into the splicing area to estimate
the length for proper storage.
Trim to length at the center of the splicing
area.
Trim Here
Remove the faceplate and cable assembly.
Table des matières
Autres manuels Clearfield Unité de contrôle
Manuels Unité de contrôle populaires d'autres marques

Festo
Festo Compact Performance CP-FB6-E Manuel de la liste des pièces

Elo TouchSystems
Elo TouchSystems DMS-SA19P-EXTME Manuel utilisateur

JS Automation
JS Automation MPC3034A Manuel utilisateur

JAUDT
JAUDT SW GII 6406 Series Guide rapide

Spektrum
Spektrum Air Module System Manuel utilisateur

BOC Edwards
BOC Edwards Q Series Manuel utilisateur














