Wenger Diva Acoustical Tower Manuel utilisateur

Installation Instructions
Diva
®
Acoustical Tower
©Wenger Corporation 2020 Printed in USA 2020-02 Part #185C755-05
Wenger Corporation, 555 Park Drive, P.O. Box 448, Owatonna, Minnesota 55060-0448
Questions? Call.....USA: (800) 4WENGER (493-6437) • Worldwide: +1-507-455-4100 • wengercorp.com
Contents
Note: Please read and understand these instructions before installing.
Note: Review all of the Installation Drawings and Reference Drawings.
Note: Three or more people are recommended to work together during assembly and installation.
Note: If you need additional information, contact Wenger Corporation using the information below.
Important User Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Manufacturer ....................................2
Intended Use ....................................2
Installation ......................................2
Warranty ........................................2
Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Before Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Required Tools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Rigging Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Fasteners. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Tower Assembly Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Tower Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Assemble the Tower Frame .........................7
Assemble the Center Panels ........................8
Attach Trim to the Center Panels .....................10
Separate Lower Filler Panel .........................11
Attach Frame to the Center Panels ...................12
Attach Base .....................................14
Attach Wing Panels ...............................16
Attach Leveler Assembly ...........................18
Attach Wing Stays ................................19
Attach Slide Lock .................................21
Attach Door Pull Handle ............................22
Lifting Tower .....................................23
Install Counterweights .............................25
Attach Base Handle ...............................26
Store Lower Filler Panel ............................27
Attach Lower Filler Panel ...........................28
Moving Towers ...................................29
Decals, Numbers and Logos . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Final Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Visit the Diva Acoustical Shell web page at wengercorp.com for more information.

2
Important User Information
General
Copyright © 2020 by Wenger Corporation
All rights reserved. No part of the contents of this manual may be reproduced, copied, or transmitted in any form
or by any means including graphic, electronic, or mechanical methods or photocopying, recording, or information
storage and retrieval systems without the written permission of the publisher, unless it is for the purchaser's
personal use.
Printed and bound in the United States of America.
The information in this manual is subject to change without notice and does not represent a commitment on the
part of Wenger Corporation. Wenger Corporation does not assume any responsibility for any errors that may
appear in these instructions.
In no event will Wenger Corporation be liable for technical or editorial omissions made herein, nor for direct,
indirect, special, incidental, or consequential damages resulting from the use or defect of these instructions.
The manufacturer reserves the right to change this product at any time.
The information in this document is not intended to cover all possible conditions and situations that might occur.
The end user must exercise caution and common sense when assembling or installing Wenger Corporation
products. If any questions or problems arise, call the Wenger Corporation at (800) 4WENGER (493-6437)
or +1-507-455-4100 worldwide.
Manufacturer
The Diva®Acoustical Tower is manufactured by:
Wenger Corporation
555 Park Drive
Owatonna, MN 55060
(800) 4WENGER (493-6437) • +1 (507) 455-4100
wengercorp.com
Intended Use
• The tower is intended for indoor use only and is not intended for outdoor use.
• Never expose the tower components to wind, humidity, or wet conditions.
• This product is intended to be assembled only as described in these instructions.
Installation
• The tower installation and use must comply with local regulations and codes.
• All personnel (including all temporary workers) installing or maintaining the tower must read and
understand these and other related installation instructions.
Warranty
This product is guaranteed free of defects in materials and workmanship for ve full years from date
of shipment. A full warranty statement is available upon request.

3
Make sure that anyone working
with the Diva Acoustical Tower
has read and understands these
instructions.
Always observe and comply
with the Warnings and
Cautions posted on the system
equipment.
Failure to comply with Warnings
and Cautions in this document
can result in damage to property
or serious injury.
Safety Precautions
Throughout this document you may nd cautions and warnings which are dened as follows:
• WARNING: Failure to follow the instruction could result in serious injury or damage to property.
• CAUTION: Failure to follow the instruction could result in minor injury or damage to property.
Read all of these safety instructions before using the equipment.
Components can be heavy or
dicult to handle and may require
three or more people working
together to lift or assemble.
To avoid damage to tower surfaces:
• Always wear gloves during assembly and installation.
• Lay any nished surfaces onto the cardboard and
foam packaging to help protect from damage.
• During assembly, dropped hardware can roll under
other components and cause damage to nished
surfaces.
Before Installation
1. Read and understand the entire tower installation section before starting the installation.
2. Make sure that all personnel installing (including any temporary workers) are trained and understand
the installation procedure.
3. Review all installation drawings and reference drawings.
Save these drawings for future reference.
4. Make sure that all items on the shipment packing list are present.
Note: These instructions describe typical assembly and installation of 16' (4877 mm) tall towers.
Towers taller than 24' (7315 mm) require frame extensions as explained in these instructions.
All Diva Acoustical Shells are installed in the same way.
!CAUTION
!WARNING
!WARNING
!WARNING
!CAUTION

4
The following tools are required for assembly.
• Assorted wrenches
• Cordless drill and cordless impact driver
• 3/8", 7/16", 1/2" and 9/16" hex nut bit
• 3/8" drift pin
• Mallet
• 24" carpenters' square
• 9/32" and 25/64" drill bit
• Chalk line
• Box level
• C-clamp set
• Phillips screwdriver
• Hex wrench set
• 3/8", 1/2" and 3/4" drive sockets
• 7/16" deep well socket and drive adapter
with a universal
• Ratchet
• Angle nder
• 100" measuring tapes (2)
• 25' tape rule
• Claw hammer
• Caulk gun
• Rivet gun
*Save the wood blocks from the tower frame and ceiling truss packaging.
They will be used later during the tower assembly.
Required Tools
Wing
Harnesses
Span Set Slings
Lifting Casters
Locking Clamps
1-ton Invertible Hoist
• Lifting casters
• Locking clamps
• Chain
• Wing harnesses
• Span set slings
• 1-ton invertible hoist
Rigging Equipment
The installers must supply the following rigging equipment for the tower installation.
Chain

5
Fasteners
The fasteners shown below are contained in various Diva hardware kits.
Any fasteners remaining when an the installation is complete can be discarded.
Button Head Screw,
3/8-16 x 1"
Carriage Bolt, 1/4-20 x 3-1/2"
Screw, Self-drill,
1/4-14 x 3/4"
Hex Head Screw, 3/8-16 x 3-1/2"
Lock Nut,
1/4-20
Lock Nut,
1/2-13
Lock Nut,
3/8-16
Hex nut,
5/16-18
Tapping Screw,
5/6 x 1"
Carriage Bolt, 1/2-13 x 4"
Screw, Pan Head,
10-24 x 5/8"
Screw, Self-drill,
1/4-20 x 1-1/4"
Hex Jam Nut,
1-8
Hex Head Screw,
3/8-16 x 2-1/4"
Tapping Screw,
1/4-20 x 1/2"
Screw, Sheet Metal,
10-18 x 3/4"
Hex Head Screw, 1/2-13 x 2"
Screw, Self-drill,
1/4-20 x 1"
Rivet, Blind, Tri-Fold,
0.19 Dia
Capscrew,
3/8-16 x 1"

6
Tower Assembly Description
The following illustration describes components used in the Diva Acoustical Tower Assembly.
Lower Filler Panel — Panel that can be
removed and stored to allow nesting to
other tower assemblies for storage.
Wing Panel — Outside sets of panels that
pivot for storage. The lower panel may be
congured as a door.
Vertical Frame — Frame consisting of two
vertical uprights and three or more cross
braces. The vertical uprights have xed and
rotating hinges that attach the wing panels
and center panels.
Center Panels — Set of panels that are
xed at the center of the assembly.
Wing Stay — Locks the wing panel in the
storage position or performance position.
Fixed Hinge — Bracket that is used to attach
the center panels to the vertical frame.
Rotating Hinge — Rotating hinge that
connects the wing panels to the center
panels.
Weldment Bar — Bracket that holds the
lower ller panel when the tower is stored.
Diagonal Brace — Structural member
adding stability to the tower assembly
and a means to adjust the tower plumb.
Counterweighted Frame — Base that
supports the vertical structure and balances
the tower assembly.
Slide Lock — Locks the wing panel
to the door panel.

7
Tower Installation
The following procedure is described using a 16' (4877 mm) tall Diva Tower.
Taller towers are assembled using the same steps but may need to be spliced together.
Refer to the installation drawings.
Assemble the Tower Frame
1. Assemble the tower frame as shown.
a. Layout both the left and right hand vertical tower frames with the at side of each frame facing
toward the outside.
b. Position the lower cross brace with the weldment bar facing toward the top and align with the third set
of holes in the frames.
c. Position the upper cross braces to align with the next set of holes in the frames and then approximately
every 8' (2438 mm) thereafter.
d. Attach all of the cross braces to both tower frames using two 3/8-16 x 0.750 hex head capscrews
in each side.
The capscrews attach directly to a welded nut on the inside of the cross braces.
2. Set the tower frame assembly aside to attach later.
Right Hand
Vertical
Tower Frame
Left Hand
Vertical
Tower Frame
Cross
Brace
Lower
Cross Brace
3/8-16 x 0.750
Hex Head
Cap Screw
Weldment bar faces
toward the top
Bottom two sets
of holes for the
base
Set of holes
for wing stay

8
Tower Installation (continued)
Assemble the Center Panels
Refer to the installation drawings for center panel placement.
1. Sweep the oor around the assembly area and place the sheets of cardboard that shipped with the
tower onto the oor surface to protect the panel surfaces.
2. Place the center panels with the nished surface facing down onto the cardboard and remove the tape
holding any protective paper to the face of the panels.
3. Cut foam strips to span the entire width of each upper center panel and install it to be fully recessed into
the bottom edge of the panel.
Then trim each foam strip end to a 45° angle.
Upper Center
Panel
Lower Center
Panel
Sheets of
Cardboard
Foam strip
location Cut foam strip
edges to 45°
angles
Foam Strip
Lower Filler
Panel
Handle
3/16"
Blind Rivets
Orient panel so part number
labels are at the bottom
4. Attach two handles to the lower ller panel using
3/16" blind rivets in each of the pilot holes.

9
Tower Installation (continued)
Assemble the Center Panels (continued)
5. Connect the upper center panel and lower center panel together.
a. Slide the panels together and align the edges.
b. Connect the two panel inner clips together using a 1/4-20 x 3-1/2" carriage bolt and 1/4-20 lock nut.
Tighten until just snug.
c. Repeat to connect the panels on the other side.
Panel Inner
Clips
1/4-20 x 3-1/2"
Carriage Bolt
1/4-20
Lock Nut
Clips should
be touching

10
Attach Trim to the Center Panels
1. Align trim strips of matching lengths to both sides of all of the center panels.
The ends of the trim strips should match with the gaps between the panels.
2. Attach the trim strips to the panels using 1/4-20 x 1" self-drilling screws as shown.
Tower Installation (continued)
Trim
Strip
1/4-20 x 1"
Self-drilling Screw
Table des matières
Autres manuels Wenger Ordinateur de bureau

Wenger
Wenger Essential Lab Workstation Manuel utilisateur

Wenger
Wenger Select Lab Manuel utilisateur

Wenger
Wenger Essential Lab Manuel utilisateur

Wenger
Wenger Percussion Workstation Manuel utilisateur

Wenger
Wenger Select Lab Fixed Height Workstation Manuel utilisateur

Wenger
Wenger Studio Manuel utilisateur

















