
Hygiene Equipment
Designed for People
6
Installation instructions
The TR Comfortline II bathtub and TR Ecoline are delivered fully assembled, ready to be
water and power supply at the customer’s premises and must be installed according to local guidelines
and regulations.
Do not drag nor push the bathtub across the floor as this will damage the lifting columns or legs.
When lifted, do so briefly and use at least two people.
1. Once the bathtub is in its final position, once again lift the bathtub briefly at each end at the same
time to release any tensions that might have been created between the lifting columns during
installation
2. The adjustable feet are used to level and adjust the bathtub. Please note that the head end of the
bathtub must be approximately 2cm (3/4” inch) higher than the foot end to allow the water to
drain more easily.
3. Flush the pipes at the premises thoroughly before connecting the Comfortline bathtub to protect
the tub and fittings from dirt.
4. A certified electrician shall connect the mains cord to a wall mounted mains connection (splash
proof) and in accordance to local regulations.
5. Raise the tub to its highest position and use the flexible drain hose to establish connection
between the floor gully and the drainage outlet underneath the tub.
6. Carry out a functional test (Height adjustable bathtub):
Test the UP/DOWN function by pushing each button the hand control. An initialization shall b
performed before the first use. See table of contents for separate Initialization/calibration
instructions.
7. Carry out a functional test of the thermostatic mixer:
The GROTHERM 800 thermostatic mixer is pre-set to a Maximum outlet temperature of 43° at
ideal installation conditions at the factory.
Make sure that maximum outlet temperature is 43°. If the maximum outlet temperature is higher
an adjustment needs to be done according to the instructions from the manufacturer of the
thermostatic mixer (separate manual supplied at delivery).
ALWAYS physically check the water temperature by hand before and during bathing to ensure
correct function of the thermostatic mixer.