
Form: 2435-3
Arctic Installation and Operation Manual Revision: 10
P/N 105641-01 Date: 12-1-2018
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web: www.thermalsolutions.com
3.5.3 Sound Pressure Levels.................................................................................................................................................24
3.5.4 Pump and Piping Requirements..............................................................................................................................24
3.5.4.1 Water Flow Rates (Variable Primary Pumping Systems)..................................................24
3.5.4.2 Water Flow Rates (Primary / Secondary Systems)..............................................................25
3.5.4.3 Water Flow Rates (Constant Volume Primary Pumping Systems)................................26
3.5.4.4 Water Flow Rates for Glycol...........................................................................................................26
3.6 Before Placing Boiler In Operation...............................................................................................................26
3.6.1 Pre-Boil Out Flushing Of System .............................................................................................................................26
3.6.2 Boil Out Procedure........................................................................................................................................................27
3.6.3 Replacement Boiler Installations............................................................................................................................27
3.7 Draining and refilling the boiler & system ................................................................................................28
3.7.1 Filling The System .........................................................................................................................................................28
3.7.2 Hydrostatic Test Of Boilers And System ..............................................................................................................28
3.8 Boiler Water Treatment....................................................................................................................................28
3.8.1 Purpose of water treatment......................................................................................................................................28
3.8.2 Objectives..........................................................................................................................................................................29
3.8.3 Water softener................................................................................................................................................................29
3.8.4 Continuous Monitoring ...............................................................................................................................................29
4 SYSTEM START-UP .......................................................................................................................................................30
4.1 Concert Boiler Control Display Navigation –This Section applies ONLY to the ARC1000
through ARC3000 ................................................................................................................................................30
4.2 System Check:........................................................................................................................................................31
4.3 Power the Boiler: .................................................................................................................................................31
4.4 Power the Circulators:.......................................................................................................................................31
4.5 Pressurize the Fuel System: ............................................................................................................................31
4.6 Boiler Commissioning: This Section applies ONLY to the ARC1000 through ARC3000 ........31
4.7 Finish Commissioning the Boiler: This Section applies ONLY to the ARC1000 through
ARC3000..................................................................................................................................................................33
4.8 Re-Starting After Prolonged Shutdown......................................................................................................33
4.9 Testing of Controls and Safety Devices.......................................................................................................34
4.10 Ignition Failure ........................................................................................ Error! Bookmark not defined.
5 Service, Maintenance, and Inspection...................................................................................................................35
5.1 General Maintenance: ........................................................................................................................................35
5.1.1 DAILY:.................................................................................................................................................................................36
5.1.2 WEEKLY: ...........................................................................................................................................................................36
5.1.3 MONTHLY:........................................................................................................................................................................36
5.1.4 ANNUALLY:......................................................................................................................................................................36
5.2 Ignition Assembly Cleaning .............................................................................................................................37
5.3 Burner Assembly Cleaning...............................................................................................................................37
5.4 Heat Exchanger Cleaning..................................................................................................................................37
5.5 Tube Replacement Procedure ........................................................................................................................38
5.6 Safety and Operating Controls .......................................................................................................................42
5.7 Troubleshooting...................................................................................................................................................43
Appendix A Sizing Gas Piping...........................................................................................................................................46
Appendix B Vent and Combustion Air Pressure Drop Data.................................................................................48
Appendix C Installation & Startup Report...................................................................................................................50
Appendix D Venting Diagrams .........................................................................................................................................51
Appendix D.1 Typical Horizontal Vent Piping.......................................................................................................51
Appendix D.2 Typical Vertical Pressurized Venting ...........................................................................................52