
Page 10/24
Assembly instructions
Hobby-Line 4530 kit
www.sorotec.de V 1.2.1
Sides of the table
For this construction phase you need: #
2guide prole 618 mm 12
4 precision shaft 617 mm 13
2table prole 617 mm 53
8 cylinder head screw M4 x 20 Z2
8 hammer nut M4 H1
sealing prole 10
Fig. 7: Lateral guide prole with attachments
12
13
53
10
Prepare the table sides:
•Load the cross holes of the table proles 53
with cylinder screws Z2 and screw on one
hammer nut H1 a turn or two.
•Place the table proles 12 with the hammer
nuts in the upper side groove of the guide
proles (see gure 7). Align to center: Protrusion
must be avoided!
•Press the table prole downwards and tighten
the screw connection.
•Guide the sealing prole 10 into the
designated groove of the guide prole (see
picture 7) and cut it ush with a sharp knife.
•Push the precision shafts 13 , on which the
castors will run later, into the corresponding
channels of the guide proles. Temporarily
secure the shafts with a little tape to prevent
them from slipping out.
Spindles
Y-axis
For this construction phase you need: #
2 ball screw 16 x 10 mm, L 658 mm 11
2xed bearing retaining plate 4 mm 39
2xed bearing spacer plate 2 mm 40
2xed bearing seat 41
2xed bearing spacer sleeve 42
4 ball bearing 8 x 16 x 5 mm 44
2 adjusting washer 10 x 16 x 1,2 mm 47
2 self-locking nut M8 x 1,
Fine thread!
62
2 grease nipple M6 45° 66
2 nut block 23
8at headed screw M5 x 20 G1
1 mounting aid MH
4at headed screw M6 x 16 G2
pre-assembled portal plates
Attention!
Never turn the spindle nut from a ball screw! The
spindle nut cannot be reassembled with common
tools. A ball screw without a spindle nut has been
destroyed and must be replaced with a new part.
Fig. 8: Mounting the xed bearings on the Y spindles
39
42
62
40
47
41
44
23
11
66