Installation instructions
Planning Considerations and Precautions ................................. 3
Thruster Measurements ............................................................ 4
Thruster Specications .............................................................. 5
Technical Specications ............................................................ 5
Positioning of the tunnel/ thruster............................................. 6
Tunnel Length ............................................................................. 7
Tunnel Installation in Sailboats.................................................. 8
Water Deflection......................................................................... 9
Tunnel ends ............................................................................. 10
Tunnel Installation............................................................ 11 - 12
Stern Tunnel Installation......................................................... 13
Thruster installation
Hydraulic Thruster Installation Considerations and Precautions..
.................................................................................................. 14
Technical Specications.......................................................... 15
Technical Requirements / Hydraulic hose connections to motor
.................................................................................................. 16
Gear Leg & Motor Bracket Installation ................................... 17
Propeller Installation................................................................ 18
Motor Installation ..................................................................... 19
S-link Planning & Precautions ................................................ 20
Control Panel Installation......................................................... 21
Checklist for Hydraulic Thrusters............................................ 22
Service and Support ...................................................... 23
Product Spare Parts and Additional Resources ............... 23
Warranty statement ...................................................... 23
Contents
EN
MC_0113
Planning Considerations and Precautions
EN
• Do not install the thruster in a position where you need to cut a stiffener/ stringer/ support for the hull integrity without checking with the boat
builder this can be done safely.
• The motor, its components, contacts/ plugs or other joints in the control cables must be mounted so they will remain dry at all times.
• We advise painting the gear house and propellers with anti-fouling. (NB: Do not paint the anodes, sealing, rubber fi ttings or propeller shafts)
• Do not nish the inside of the tunnel with a layer of gel-coat/ topcoat or similar. There is only room for a thin coat of primer and two layers of
anti-fouling between the tunnel and the propellers.
• Keep installation within advised measurements. The entire surface is hard coated seawater resistant aluminium. Do not damage or penetrate the
coat.
• Install the oil tank higher than the pumps to ensure enough gravity feed and pressure for feed ports. (NB: The height of oil levels in the hydraulic
tank should be higher than the connected hydraulic pumps.)
• Find a suitable location for the hydraulic tank installation for future maintenance accessibility. There must be enough space around the oil tank to
change lters, ll oil and inspect gauges and indicators.
MC_0009
Hydraulic Thruster Installation Considerations and Precautions
EN
Before installation, The installer must read this guide to ensure necessary acquaintance with this product.
• If the height of the room you are installing the Side-Power is limited, it can be installed horizontally or at any angle in-between.
• The motor must be handled with care. Do not rest on the drive shaft.
If an original Side-Power hydraulic system is NOT installed, please ensure the following:
• Install an oil lter to keep the oil clean.
• Fit an oil cooler or use an oil tank to ensure the maximum oil temperature is 43 - 50 degrees Celsius.
• Hydraulic thrusters are supplied with hydraulic motors only.
• The installed hydraulic system is the responsibility of the tter/ installer and must be within the limitations outlined in this manual to ensure no
damage is caused to the thruster.
• The hydraulic valve must have flow and pressure limits that are either set within or can be adjusted to the limits of the thrusters capability.
• We strongly advise that a shock valve is tted and set to 10% - 15% above the chosen maximum pressure set in the valve. This will prevent the
system from being damaged if the propellers are blocked for any reason.
• It is required that a device is installed to ensure that the drive direction cannot be suddenly changed, as this can severely damage the gear house.
(NB: By adding an electronic time-lapse/delay safety on the electric control system or by using a valve that has this type of protection built
in will prevent this issue. *The required time delay is 1 second.)
Products
SH100/185T-U08 - SH100 Tunnel thruster, U08
SH100/185T-U10 - SH100 Tunnel thruster, U10
SH100/185T-U11 - SH100 Tunnel thruster, U11
SH160/215T-U08 - SH160 Tunnel thruster, U08
SH160/215T-U11 - SH160 Tunnel thruster, U11
SH160/215T-U14 - SH160 Tunnel thruster, U14
SH160/215T-U06 - SH160 Tunnel thruster, U06
SH160/215T-U10 - SH160 Tunnel thruster, U10
SH100/185T-U06 - SH100 Tunnel thruster, U06