SHC SL19 Manuel utilisateur

1
Model SL19 Installation Manual
Staying Home Corporation
--

2
Preliminary Checks
Installation Site Requirements
_____ -
_____
_____
Included with Shipment
_____
____ -
_____
____
_____
_____
_____ 6’
_____
_____
____
_____
_____
_____
Tools Required
_____
_____
_____
_____
_____
_____
_____
_____(7/16” & 1/2")
_____

3
Typical Components

4
Underside of Chassis

5
Identify Track Pieces
-

6
Installation Procedures for Stock Units
Track Installation: Track and rack should be cut before installing them on the staircase
-
--
-
Note: The gear rack is already
inserted in the gear rack channel of the track.
7” (note: be sure to verify clearance from
top nose to any obstruction at the top such as a door or door
frame that would cause the chair to hit or block the seat from
swiveling.)

7
.
Left Hand
Installation
Right Hand
Installation

8
Splice Track Pieces Together
-
.

9
Secure the Track to the Stair Treads

10
Insert the Chassis into the Track
One shim goes onto
each axle on the gear rack side only.
Failure to have the proper shims in place will
cause the pinion gear not to engage in the gear
rack properly.
Table des matières

















