3
the technician who also installs the boi-
ler, this technician is also obliged to pre-
sent to the user all the accompanying
documentation for the boiler (in particu-
lar the Operation guide, Service Book
etc.). If the boiler is not put into opera-
tion, the original packaging of the boiler
must be available for the potential fur-
ther transport thereof.
Safety of equipment and people
• According to the findings of the SZÚ
Brno (National Testing Institute), the boi-
ler (as well as all its optional accesso-
ries) complies with the requirements of
European Directive 90/396/EEC on gas-
fuelled appliances and European Directi-
ve 92/42/EEC on efficiency, the Euro-
pean Directive 2006/95/EC on electrical
means of operation for use in certain
voltage ranges and the European Directi-
ve 89/336/EEC on electromagnetic com-
patibility.
• The appliance is also approved accor-
ding to the European norms EN 677, EN
625, EN 60335-01, EN 50165, EN
55014, EN 61000-3-2 and EN 61000-3-
3.
• In order to operate and handle the boiler
in accordance with the purpose for which
it is designed in actual conditions of use
(hereafter referred to only as use), it is
necessary to abide also by additional
conditions – the most essential of which
(i.e. those which must not be omitted)
are found in the following regulatory
documents:
- in the design area: STN 06 0310 and
STN 06 0830;
- in the fire safety area: STN 92 0300;
- for installation and fitting (and repairs):
STN EN 1755 or STN 38 6460, as appli-
cable STN 38 6462, Decree no. 48/1982
Coll. (as amended by the later prescripti-
ons) and the binding occupational health
regulations;
- in time of running and operation: STN 38
6405;
- in the area of discharge of combustion
gases and air inflow STN EN 483, com-
pany material – “catalogue of dual piping
for discharge of combustion gases and
inflow of combustion air designated for
type C gas appliances, i.e. in closed
“TURBO” version.
• In addition to the above mentioned docu-
ments, it is necessary when using the
boiler to proceed in accordance with this
Operation and Installation Guide and the
accompanying boiler manufacturer’s
documentation. During use of the boiler
any handling by children, persons under
the influence of intoxicating substances,
non-certified persons, etc. must be pre-
vented.
In practice situations may arise in which
the following essential measures must
be adopted:
• prevent the boiler from (even accidental-
ly) being switched on while conducting
inspections or working on the combusti-
on gases flue route or gas and water dis-
tribution pipes by disconnecting the boi-
ler from electrical power supply also by
other means than only using the main
switch (e.g. by pulling the power cord
plug out of the power socket);
• shut the boiler down every time when
there are any (even temporary) flamma-
ble or explosive fumes present in the
area from which combustion air is
supplied to the boiler (e.g. from paint
when painting, laying and spraying mol-
ten substances, from gas leaks, etc.);
• if it is necessary to drain water from the
boiler or from the whole system, the
water must not be dangerously hot;
• in the case of a water leak from the
boiler’s heat exchanger or when the
exchanger is clogged up with ice, do not
attempt to start up the boiler until normal
operating conditions have been resto-
red;