
ProtoNode-RER and LER Start-up Guide Table of Contents
ProtoCessor 1991 Tarob Court Milpitas, California 95035 USA Web: www.protocessor.com
Tel:
(408)
964
4444
Fax: (408) 262-2269 Toll Free: 888-509-1970
X141
email:
[email protected]m
TABLE OF CONTENTS
1Introduction................................................................................................................................3
1.1 BTL Mark –BACnet Testing Laboratory .........................................................................................................3
1.2 LonMark Certification ....................................................................................................................................3
2Bacnet/LONWorks Setup through Protocessor Protonode RER/LER ..............................................4
2.1 Features .........................................................................................................................................................4
2.2 Installation Steps for the Customer. ..............................................................................................................4
2.3 Record Identification Data .............................................................................................................................4
2.4 Configure the DIP Switches............................................................................................................................5
2.4.1 Setting the Node/ID Device Instance (DIP Switch A0 –A7)....................................................................5
2.4.2 Setting the Serial Baud Rate (DIP Switch B0 –B3) .................................................................................5
2.4.2.1 Baud Rate Dip Switch Selection .....................................................................................................5
2.4.3 Using S0 –S3 bank of DIP Switches to select and load Configuration Files ...........................................6
3Interfacing the ProtoNode to HOST OEM DEVICE..........................................................................7
3.1 ProtoNode RER and LER showing connection ports ......................................................................................7
3.2 Wiring Connections to ProtoNode RER and LER ............................................................................................7
3.3 Wiring the ProtoNode RER to RS-485 Field Protocol .....................................................................................8
3.4 Wiring the ProtoNode LER Field Port to a LonWorks network ......................................................................9
3.5 Power-Up the ProtoNode RER or LER ............................................................................................................9
3.6 Commissioning the ProtoNode-LER on a LonWorks network .......................................................................9
4Connect the ProtoNode’s Web GUI to Setup ip Address for BACnet/IP or Modbus TCP................10
4.1 Connect the PC to the ProtoNode via the Ethernet port.............................................................................10
4.2 Use the ProtoNode Web GUI to Connect to the ProtoNode .......................................................................11
4.3 Set IP Address for BACnet/IP .......................................................................................................................11
Appendix A Troubleshooting Tips if the ProtoNode is not working ....................................................13
Appendix A.1. Check Wiring and Settings................................................................................................................13
Appendix A.2. Take Log With Our FieldServer Utilities............................................................................................13
Appendix A.3. LED Diagnostics for Modbus RTU Communications between the ProtoNode and the OEM Product
.................................................................................................................................................................................16
A.3.1 ProtoNode RER LEDs..................................................................................................................................16
A.3.2 ProtoNode LER Main Board LEDs...............................................................................................................16
Appendix B Vendor Information .......................................................................................................17
Appendix B.1. Additional DIP switch settings ..........................................................................................................17
Appendix C Reference ......................................................................................................................18
Appendix C.1. Specifications....................................................................................................................................18
Appendix C.1.1. Compliance with UL Regulations ...............................................................................................19
Appendix C.2. Address DIP Switch Settings .............................................................................................................19
Appendix D Limited 2 year Warranty ..............................................................................................25