Viking Oxeo Manuel

Installation and Maintenance Manual
Oxeo Inert Gas Extinguishing System

IMPORTANT! Read this document before starting any work.
This document is a mandatory part of the installation and should always be stored in a easily
accessible location and retained for future use.
This document is a translation of the original German document with modifications specific
to the usage in North and South America.
The Viking Corporation
210 N. Industrial Park Dr.
Hastings, MI 49058
USA
Phone: 269-945-9501
Fax: 269-818-1680
www.vikinggroupinc.com
Document ID: F_101921
Revision: 02
Release date: October 2022

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en i
Table of Contents
1 General ................................................................................... 1
1.1 Information about this manual.............................................. 1
1.2 About this document ................................................................ 3
1.3 Copyright ....................................................................................... 3
2 Safety....................................................................................... 5
2.1 Safety and warning notices..................................................... 5
2.2 Warnings within instructions.................................................. 6
2.3 Intended use................................................................................. 6
2.4 Safe operation.............................................................................. 8
2.5 General dangers .......................................................................... 9
2.6 Qualification of personnel ....................................................... 14
2.7 Personal protective equipment............................................. 16
2.8 Obligations of the Authorized Distributor......................... 17
2.9 Safety and protective devices ................................................ 18
2.10 Signage ........................................................................................ 20
2.11 Environmental protection..................................................... 24
2.12 Behavior in the case of fire.................................................... 24
3 Transport, packaging and storage................................ 27
3.1 Transport inspection.................................................. 28
3.2 Transport........................................................................................ 29
3.3 Packaging ...................................................................................... 33
3.4 Storage............................................................................................ 34
4 Design and Function ........................................................ 37
4.1 Functional description .............................................................. 37
4.2 Oxeo unistrut racking arrangements................................... 40
4.3 Pipeline system............................................................................ 40
4.4 Manifold 200 bar and 300 bar, DN50................................... 41
4.5 Check valve KRV-2 ...................................................................... 42
4.6 Extinguishing cylinder with quick release valve QRV.... 42
4.7 Hose for extinguishing agent................................................. 48

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
ii
Table of Contents
4.8 Pilot hoses for activation of “slave” cylinder .................... 49
4.9 Monitored blocking................................................................... 49
4.10 Pressure reducer ...................................................................... 50
4.11 Manifold safety valve.............................................................. 52
4.12 Occupiable space protection kit ........................................ 53
4.13 Shuttle non-return valve....................................................... 61
4.14 Pilot pressure relief assemblies........................................... 62
4.15 Blocking device, pilot line..................................................... 64
4.16 Downstream pipework.......................................................... 64
4.17 Limit switch, pneumatically operated.............................. 65
4.18 VN Nozzle.................................................................................... 66
4.19 DCM Nozzle................................................................................ 67
4.20 Pilot line made of precision steel pipe............................. 67
5 Assembly and installation................................................ 69
5.1 Warnings for assembly and installation............................. 69
5.2 Requirements imposed on the pipeline system............. 71
5.3 Manifold Assembly .................................................................... 74
5.4 Extinguishing cylinder with quick release valve QRV ... 75
5.5 Installing the safety valve........................................................ 90
5.6 Mounting the pilot control cylinder.................................... 92
5.7 Assembling the shuttle non-return valve.......................... 98
5.8 Mounting flexible pilot hose.................................................. 101
5.9 Assembling the pilot pressure relief device ..................... 102
5.10 Mounting the blocking device............................................ 104
5.11 Mounting the pressure reducer.......................................... 107
5.12 Mounting the pneumatic time delay ............................... 108
5.13 Assembling the downstream pipework.......................... 111
5.14 Assembling the pneumatically operated limit switch 113
5.15 Mounting the VN Nozzle....................................................... 115
5.16 Mounting the pilot line made of precision steel pipe 117
5.17 Mounting makrofon MX-1.................................................... 125
6 Electrical Connections and Terminal Assignments 129

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en iii
Table of Contents
6.1 Electrical release device, QRV ................................................. 130
6.2 Monitor for the electrical release device ............................ 131
6.3 Contact pressure gauge ........................................................... 132
6.4 Blocking device............................................................................ 134
6.5 Pneumatically actuated limit switch.................................... 135
6.6 Light barrier (loss monitoring) ............................................... 135
6.7 Limit switch reed contact (loss monitoring) ..................... 137
6.8 Limit switch connections to monitored circuits per NFPA 139
7 Commissioning.................................................................... 143
7.1 Preparations.................................................................................. 144
7.2 Testing the function of QRV actuation................................ 145
7.3 Checking the functioning of the pneumatic time delay 145
7.4 Checking the functioning of the makrofon MX-1........... 148
7.5 Establishing operational readiness ...................................... 148
8 Inspection and Servicing.................................................. 151
8.1 Inspection and maintenance schedule............................... 156
8.2 Service report ............................................................................... 159
8.3 Activities before servicing........................................................ 159
8.4 Preparation activities................................................................. 160
8.5 Visual inspections ....................................................................... 160
8.6 Refilling........................................................................................... 162
9 Malfunctions......................................................................... 165
9.1 Extinguishing cylinder with quick release valve QRV.... 166
9.2 Safety valve ................................................................................... 166
9.3 Pneumatic control device........................................................ 167
9.4 Pneumatic time delay unit ...................................................... 168
9.5 Limit switch, pneumatically operated................................. 169
9.6 Makrofon........................................................................................ 169
10 Disassembly and Disposal............................................. 171
10.1 Disassembly................................................................................ 172

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
iv
Table of Contents
10.2 Disposal....................................................................................... 180
11 Technical Data ................................................................... 181
11.1 Operating Conditions............................................................. 181
11.2 Emissions .................................................................................... 182
12 Appendix A - Racking Assembly ................................. 183
12.1 Introduction............................................................................... 183
12.2 Racking System Configurations and Ordering Information184
12.3 Spare parts and component technical data................... 187
12.4 Assembling the Rack .............................................................. 191
13 Appendix B - Replacement components................. 201
14 Appendix C - Approval Checklists .............................. 213
15 Safety Data Sheet - IG-01 (Argon)............................... 215
16 Safety Data Sheet - IG-100 (Nitrogen)....................... 223

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en 1
1 General
1.1 Information about this manual
This manual describes the installation and maintenance of Oxeo inert gas extinguishing systems
Oxeo PR LCP with a pressure reducer (also referred to hereinafter as “system”). Information about
fire detection and electrical control is not part of this manual. Qualified knowledge of the extin-
guishing agent used and the technical details of Oxeo inert gas extinguishing systems Oxeo PR
LCP with a pressure reducer are prerequisites for working with this manual.
This installation and maintenance manual contains neither detailed information concerning proj-
ect planning of the system, nor detailed information concerning operation. For this, observe the
design manual and the operating manual. This manual can be obtained through authorized deal-
ers.
This manual is intended for the installer of the fire extinguishing system.

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
2
Applicable documents
Operating manual “Oxeo inert gas extinguishing system with pressure reducer, Oxeo PR LCP”
(form no. F_101821).
Design manual “Oxeo inert gas extinguishing system with pressure reducer, Oxeo PR LCP”
(form no. F_102021).

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en 3
1.2 About this document
This document enables the intended use of the system described. Observing all specified instruc-
tions and safety instructions is the prerequisite for safe work. Furthermore, the local accident pre-
vention regulations and general safety conditions for the use of the system are also applicable.
If this document refers directly or indirectly to laws, regulations, or directives or quotes from them,
the manufacturer cannot be held responsible for the correctness, completeness or up-to-date
nature of the reference.
Observe the applicable guidelines, standards, and statutory legislation of the respective country
of deployment.
Illustrations in this document are intended to facilitate basic understanding, and may differ from
the actual design of the product.
1.3 Copyright
Any content in this document, particularly texts, photos, and graphics, are protected by copyright.
If not otherwise clearly indicated, copyright lies with the manufacturer.
The manufacturer can issue permission of usage for contents of this document. Anyone violating
copyright law, e.g. by copying the contents into their own documentation without the respective
permission, is liable to prosecution. Copyright violators shall also receive a written warning and be
liable to pay costs.
The manufacturer reserves the right to make modifications resulting from further develop-
ments while retaining the key features of the system described without making corrections to
this document.

Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
4
Table des matières

















