
ss
Boi
rs
In
all
on,
Op
r
on
&
Ma
nten
n
M
n
a
6
General
Theboilershallbeinstalledbyqualifiedpersonnelinaccordancewiththeinstructionscontainedinthismanual.
Furthermore,compliancewithapplicableNationalandlocalbuildingandsafetycodesisnecessary.
Preinstallation
Inspecttheboilerforpossibledamageduetoshippingandhandling.Claimsforshippingdamageshallbeplacedwith
thecarrierandshouldbereportedimmediatelytothem.Ifdamagehasbeensustainedduringshippingthatmay
affectthesafeandreliableoperationoftheboiler,contactthesalesofficetodiscusscorrectiveaction.
Pleasehaveavailablethemodelnumber,serialnumber,voltage,kW,andphaseofthesuppliedequipment.This
informationisavailableontheboilernameplate.
MOUNTING
1.Theboilermustbepositionedonanadequatebase,preferablyconcrete,sufficienttosupportitsin‐serviceweight,
andthenlevelledandsecuredinplace.
Note:Wheninstallingboiler,allowsufficientroomtofacilitateremovalofelementsifandwhennecessary.
NOTE:Allowaminimumof36inchesclearanceinfrontofdoorsforservicingofheatingelements.Recommended
clearance:24inchesothersidesofboilerforservicing.
2.Donotinstallboilerinanylocationwherewatercouldfreeze.
3.Donotinstallboileroutdoors.
4.Donotinstallboilernearflammableorcorrosivematerials.
5.Donotinstallboilerinalocationwhereleakagefromtheboilertankorpipingcandamagetoadjacentareasorto
lowerfloorsofthestructure.Provideafloordrainandproperlyslopedfloorfromtheboilertowardsthedrainor
installasuitablyplumbeddrainpanundertheboiler.
PLUMBING
Ensurethatallplumbingconnectionsaremadeaccordingtolocalregulationsandapplicablecodes.
1. InletandOutlet
Forsingleboilerinstallations,stopvalvesarenormallyrequiredontheinletandoutletconnectionsoftheboilerto
allowtheboilertobedrainedandcleanedwithouthavingtodraintheentiresystem.
Formultipleboilerinstallationsinasinglesystem,stopvalvesarealwaysrequiredattheinletandoutletpiping
connections.
Forconnection:Pipethesystemreturnpipingtotheboilerinlet(atthebottom)andthesysteminletpipingtothe
boileroutlet(atthetop).Neverreversethetwo.
2.PressureReliefValve
Theboilerisequippedwithapressurereliefvalvetopreventtheboilerfromexceedingthemaximumallowable
workingpressure.
Forconnection:Pipetheoutletfromthepressurereliefvalvetoasuitabledrainawayfromotherequipment,
walkwaysandpersonnel.Donotreducethepipingsizefromthepressurereliefvalve.
3. Installation