
TABLE OF CONTENTS
01. Technical Data 04 07. Operating Instructions 22
Operation
02. Dimensions 05 Controls
Boiler Module 23
03. Safety Guidelines 06 PCB Symbol Key
Conditions Switching On the Appliance 24
General Guidelines Switching Off the Appliance
Service 07 Information Display 25
General Restrictions DHW Operation
Heating Operation
04. Description 08 Displaying Information
General Table Parameter List
Working Principle and Design History Mode 26
Application Features Possible Error Codes
Main Components 09 Possible Error Codes continued. 27
Rear Connections
Boiler Control 10 08. Commissioning 28
Safety Aspects General
Reference Value for Maximum Load
05. Delivery & Transport 11 Reference Value for Minimum Load
Delivery Maximum Load Adjustment 29
Transport Minimum Load Adjustment
Moving Setting the CO2Value for the ETHOS Range 30
Access Requirements Conversion from Natural Gas to Propane 31
06. Installation 12 09. Cascade Set-Up 31
Regulations Auto Detection Mode
Installation Guidelines Cascade Test Mode 32
Ventilation 13
Gas Connection 10. Maintenance 33
Water Connections Safety
Electrical Connections Servicing Schedule
0 - 10 V Control Removal of Gas Valve and Venturi 34
Internal Controls Breakdown (Main PCB) 14 Removal of Fan and Burner Assembly 35
Internal Controls Breakdown (Control Fascia) 15 Setting / Checking of Electrode and Probe Gaps 36
External Controls Breakdown (Din Rail)
Controls and Options 16 11. Component List 37
Flue Connection 17 Casing and Electrical Components
Condense Removal Core Components 38
Flue Length 18
Calculation of Diameter and Length 12. Conversion Formulae & Factors 39
Condense Connections 19
Safety Valve Connection 13. Notes 41
Hydraulic System
Shut-Off Valves 20
Valves (Boilers in Cascade Arrangement)
Draining and Cleaning
Water Circulation System
Water Pressure 21
System Expansion Vessel
Water Pressure Protection Device
Water Temperature
Water Quality
Water Hardness 22
TECHNICAL DOCUMENTATION 03