STM MINI-ROCKETBOX PLUS+ Manuel utilisateur

POWER
Standard 110V
Full-Load 5.2 Amps
5-1/2 ft. Cord Length
SOFTWARE &
UPGRADES Manual Control Panel
OPERATION Patent-Pending Pneumatic Leveling System
CYCLE
CUSTOMIZATION Single Cycle Operation with Variable Dial
TRAINING Training Videos via Client Portal
VOLUME
CAPACITY 143 Pre-Rolls Every Cycle
MATERIALS Encased in SAE 304 Stainless Steel
Aluminum & Other Food Grade Components
WEIGHT &
DIMENSIONS
Approximately 35 lbs
Machine Dimensions 14" L x 17" H x 10" W
PAPER
COMPATIBILITY Compatible with 84, 98, and 109 mm cones
COMPLIANCE
OSHA Compliant
UL-Listed Components
100% Food-Grade
LIFE CYCLE 10 Years
Sesh Technologies Manufacturing, Inc.
3223 North Market Street, Spokane, WA 99207
Phone: (509) 204-3168 | Web: www.stmcanna.com
MINI-ROCKETBOX™
PLUS+
USER MANUAL V1.3

Table of Contents .......................................... 1
Break-In Procedure ....................................... 2
Components .................................................. 3
Adjustable Top Tray ...................................... 5
Lift Plate ......................................................... 7
1
TABLE OF CONTENTS
Getting Started .............................................. 8
Operation of Machine .................................. 9
Loading & Unloading Cones ....................... 10
Cleaning & Maintenance ............................. 11
Terms of Business ........................................ 12

Thank you for being a valuable and loyal client of
STM. Our goal is to bring our customers the very
best in product quality and customer service. We
value your feedback and use it to evaluate what to
improve and/or update in our existing product line.
Please be advised that the Mini-RocketBox™ PLUS+
has a direct funneling system into your selected
pre-rolls when used properly. This means that
contaminate-free material being funneled from the
Top Trays into your pre-rolls will remain
contaminate-free through the direct filling process.
The Top Tray funnels are directly inserted into the
opening of your pre-roll cones and do not allow
anything other than what is being fed onto the Top
Tray.
Even with the direct funneling system, there is a
break-in period of 400 hours before any material
passes through the "crutch" or bottom of the pre-
roll onto the bottom of the "shaker box". This
material could be reused, but should still be visually
inspected for debris. Although we inspect each and
every part before it is sent; due to the intense
vibration, the break-in period is required.
After you have set up your Mini-RocketBox™ PLUS+, proceed to
run multiple cycles without material (at least 5 per set of trays
using different intensity setting on the motor) with each of your
tray systems and watch for debris in-between the trays and in the
shaker box bottom.
After the un-boxing and the initial break-in, you may proceed with
use of the Mini-RocketBox™ PLUS+ for the first 400 hours of
operation. Until the 400 hour point has been reached, discard all
materials which have dropped inside the bottom of Mini-
RocketBox™ PLUS+.
PLEASE ADHERE TO THE RECOMMENDED GUIDELINES
TO BREAK-IN YOUR MINI-ROCKETBOX™ PLUS+
After the 400 hours required for proper break-in you may reuse
the material that has been collected in the bottom of the shaker
box only after visual inspection for debris has been made.
Visual inspection should always remain part of the operation of
your Mini-RocketBox™ PLUS+. Although we use food-grade
materials for direct contact surfaces, due to intense vibration and
moving parts, they may still have debris and must always be
inspected.
2
BREAK-IN PROCEDURE

3
COMPONENTS
1. Guide Pins
2. Rubber Flaps - Prevents material
from falling into the base of machine.
1. Guide Pins- Used for guiding the top
and bottom trays into machine.
3. Power Switch- Turns the
machine on and off.
4. Adjustable Dial - Controls the
vibration intensity.
5. Suction Cup - Creates a strong
suction to adhere machine to table.
5. Suction Cup
3. Power Switch
4. Adjustable Dial
2. Rubber Flaps

4
8. Loading Box
9. Top Tray
10. Bottom Tray
11. Finishing Base
12. Reset Brackets
13. Riser Bolts
14. Density Beaker
8. Loading Box- Holds bottom tray to
load cones and unload top tray.
9. Top Tray- Placed on top of bottom
tray. Only used for machine operation.
10. Bottom Tray- Cone holding tray (84
MM or 98/109 MM cones).
11. Finishing Base- Holds bottom tray
for unloading cones.
12. (2) Reset Brackets- To reset the
adjustable top tray to default settings.
13. (4) Riser Bolts - Adjusts the lift plate
for 84, 98, or 109 mm cones.
14. (1) Density Beaker- 10 mL
beakers used to run density tests.
COMPONENTS

Loosenthe bottom nut on the Adjustment Bolt
with a 7/16" closed-end wrench. Repeat with
each of the (4) bottom nuts.
Turn the Adjustment Bolt counter-clockwise to
lower the Top Tray, or clockwise to raise the Top
Tray. Turn each bolt in 1/2 turn increments.
Repeat for all (4) Adjustment Bolts.
Tighten the Adjustment Bolt bottom nut with
7/16 closed-end wrench to secure into place.
Repeat with all (4) bottom nuts.
ADJUSTING THE TOP TRAY
RESETTING THE TOP TRAY
Add the (2) Reset Brackets to each side of the
Bottom Tray. Place Adjustable Top Tray on top.
Loosen Adjustable Bolt bottom nut with a 7/16
closed-end wrench. Repeat for all (4) bottom nuts.
Turn the top Adjustment Bolt clockwise (right) until
it touches the Bottom Tray. Tighten the bottom bolt
to lock into place. Repeat with all (4) bolts. This is
the default 1/4" setting.
Ensure all (4) Adjustment Bolts are evenly adjusted.
Tighten bottom nuts to secure into place.
The Adjustable Top Tray gives the ability to refine and
control the weight of the pre-rolls. This tool allows
the operator to lower and raise the funnels in and out
of the paper cones, which will increase or decrease
the overall volume of the pre-rolls.
The Mini-RocketBox PLUS+ is pre-installed with an
Adjustable Top Tray. The default adjustment is set at
at¼", easily adjusted with a 7/16" end wrench.
(4) ¼” Adjustment Bolts
(4) ¼” Bottom Nuts
(2) Removable Reset Brackets
ADJUSTABLE TOP TRAY IS EQUIPPED WITH:
5
ADJUSTABLE TOP TRAY

6
The Adjustable Bolt touches the Bottom
Tray with the default 1/4" adjustment.
Ensure all (4) bolts are adjusted evenly.
Reset Brackets fit in between the Top
and Bottom Tray. Make sure to keep the
Reset Brackets in a convenient location
for future adjustments.
The Mini-RocketBox PLUS+ includes (2)
removable Reset Brackets to reset the
height of the Top Tray to the default 1/4"
setting.
ADJUSTABLE TOP TRAY
Bottom Tray
Top Tray
Included Reset Brackets
Placement of Reset Brackets
Placement of Adjustable Bolt
Loading Box
TRAY ASSEMBLY
Top Tray

7
Remove the (4) flathead screws with a 5/32
Allen wrench and remove the Lift Plate
completely from the shaker box.
Install the Riser Bolts (4) onto the fixed riser
bolts on the bottom of the shaker box. The
84 mm 'B' Riser Bolts are longer, whereas
the 98 mm 'A' Riser Bolts are shorter.
Align and re-install the Lift Plate, securing in
place with the (4) flathead screws using a
5/32 Allen wrench.
ADJUSTING THE LIFT PLATE
The Lift Plate rests on the bottom of the shaker box
to help level the cones for even filling.
The Lift Plate uses (4) Riser Bolts to adjust for 84
mm, 98 mm, and 109 mm tray sizes. The Lift Plate is
set for 109 mm by default.
Please ensure the correct Riser Bolts are
installed prior to use.
'A' RISER BOLTS 'B' RISER BOLTS
Used for 98 mm cones Used for 84 mm cones
LIFT PLATE

8
PREPARING WORK AREA
The space required for pre-roll production varies based
on volume needed. See the suggested work areas below:
Grinding Area
Material Prep for Mini-
RocketBox™ use.
RocketBox Area
For trained person(s) to
operate the RocketBox™.
Loading Area
Dedicated to loading cones
into Bottom Trays.
Packing Area
Dedicated to closing and
packaging cones.
Scoop for Material
Shop Vac
Stainless Steel Chopsticks
Thousandths Scale
70%+ Isopropyl Alcohol
Spray Bottle
Collection Bin
Pipe Cleaners
SUGGESTED TOOLS AND ACCESSORIES
GETTING STARTED
Power on the Mini-RocketBox PLUS+ by
plugging it into a 120v outlet.
Press the orange button to the ON
position.
POWERING ON THE MINI-
ROCKETBOX PLUS+
Table des matières
Autres manuels STM Équipement industriel

STM
STM RFA Series Mode d’emploi

STM
STM ROCKETBOX Manuel utilisateur

STM
STM ROCKETBOX Guide d'installation

STM
STM ROCKETBOX 2.0 Manuel utilisateur

STM
STM NGN-8100 Manuel utilisateur

STM
STM MINI-ROCKETBOX CANNA Manuel utilisateur

STM
STM REVOLUTION 2.0 Manuel utilisateur

STM
STM RX Series Mode d’emploi

STM
STM ATOMIC CLOSER Manuel utilisateur


















