
Explanation of symbols and details:
Required tools and materials:
- Needle le (supplied)
- Spanner 5,5 mm
- Allen wrench 2,0 mm - Spanner 8 mm
- Allen wrench 3,0 mm - Rubber mallet
- Allen wrench 4,0 mm - Crosstip screwdriver
- Allen wrench 5,0 mm - Superglue
1A1
= assembly phase = assembly group = work step
= view of assembly
phase
= required parts for this
work step
= larger detailed view/
pre-assembly of parts
= Tighten the screw.
= Engage the screw, but do not tighten.
= Caution! Work particularly careful.
= Tighten clockwise.
= Remove protection lm and afx self-adhesive part.
= Fasten part with superglue, use sparingly, must not get on bearing or running surface.
= Deburring.
= Apply dish liquid as shown in picture.
!
Differences in the assembly of size 300 and 420:
The illustrations in this assembly manual are exemplary and are based on the enclosure
for size 420.
The assembly group A as well as the work steps 1.1 and 1.2 do not apply with
size 300!
Please pay attention to the different dimensions of the individual parts!
!