Introduction
1. The boiler and all associated equipment
must be installed and used in accordance
with the installation design, all applicable
legal regulations and technical standards and
with the manufacturer’s instructions. The
boiler may be used only for the purpose for
which it is intended.
2. The boiler may be installed only in an
environment, which it is designed for. If the
same person who installs it delivers the boiler
to the client, he must give the user also all
accompanying boiler documentation (in
particular User Guide, Service Book, etc.).
Until the boiler is put into service, the original
packaging must be kept in case the boiler
has to be transported again.
3. After installation, the boiler must be
put into operation by a service organization
authorized by the manufacturer.
4. The boiler complies with regulations
applicable in the European Union. When
used in the conditions of countries outside at
EU, any deviations from local regulations
must be identified and rectified.
5. In the event of a defect call an
authorized manufacturer’s service
organization – any unauthorized interference
may damage the boiler (and possibly also
associated equipment!).
6. The service technician putting the
boiler into operation for the first time must
show the user the various parts of the boiler
and how to control the boiler, with the boiler
safety elements, their signals and appropriate
user reaction to them, with fundamental parts
of the boiler and their controls. If the same
person who installs it delivers the boiler to the
client, he must make sure that the original
packaging is available in case the boiler has
to be transported again.
7. Check the delivery for completeness.
8. Check whether the model and type supplied
is suitable for the required use.
9. Whenever you are not certain how to
control the boiler, study appropriate
instructions in this Operation and installation
Guide carefully and proceed accordingly.
10. Never remove or damage any markings
and signs on the boiler. Keep the original
packaging until the boiler has been put into
service, in case the boiler has to be
transported again.
11. When making any repairs, only original
parts must always be used. It is forbidden to
make any changes to the boiler’s internal
installation, or to interfere with it in any way.
12. At the end of its life cycle, the boiler its
package and its parts must be disposed of in a
way avoiding harm to the environment.
13. The manufacturer disclaims any
responsibility for damages caused by the
failure to abide by:
•The conditions stipulated in this Operation
and Installation Guide
•Applicable regulations and standards.
•Sound installation and operation
procedures.
•Conditions stated in the Warranty
Certificate and the Service Book.
•The conditions stipulated in this Operation
and Installation guide
Situations might occur in practice, when the
following essential precautions must be taken:
Shut the boiler down every time when here
are any (even temporary)