
2
First Time Operang Instrucons
• Remove all packaging materials and be sure to keep track of all parts
nested in the packaging for safe shipment.
• We recommend that you retain all packaging in the event of a move or
for shipping the appliance in the future.
• Let the unit sit for 24 hours before plugging in the power cable and
turning on.
• CAUTION: We do not recommend using extension cords. If you must
use an extension cord make sure it is UL/CUL, 3-wire grounding type
appliance extension cord having a grounding type plug and outlet
and that the electrical rang of the cord be 115 volts and at least 10
amperes.
• Two plugs are provided for the operaon of your PRO series SteakAger.
The main plug is for the refrigerator and one 12V plug for the SteakAger
Initial Setup GETTING
STARTED
Leveling your PRO 20/40
• Move your PRO 20/40 to its nal desnaon.
• Have someone gently lean on the front of the PRO 20/40 to take some
of the weight o of the leveling leg.
• Turn the leveling leg clockwise to raise, and counter-clockwise to lower
the PRO 20/40. Connue in this manner unl the PRO 20/40 is level. It
iss best to ensure the appliance is lted slightly to the rear for draining
of water.
PRO 20/40 Setup Checklist
1. Place and level unit.
2. Wait 24 hours for compressor oil to sele from shipping.
3. Plug 120V compressor cable in.
4. Plug 12V power source supplied into the socket on the lower right hand
side of the back of the unit.
5. Conrm fans on the Control Panel are running.
6. Download and run our Steakager App.
7. Unwrap the drain hose, place and trim hose to drop into the Drain Pan.
8. Set the desired temperature.
9. Insert Humidicaon Pan with fresh water if desired.
10. Observe for normal operaon for a few hours before loading.