
EN
Contents of Packing
Open the shipping carton and carefully unpack its
contents. The carton should contain the following items.
1. EP100 series Unmanaged Switch x 1
2. DC Power adapter (w/ AC power cord):
Power adapter (AC input: 100-240V/1.2A, 50/60Hz, DC
output: 48V/0.8A) x1 for EP100-05-31 and EP100-08-31
Power adapter (AC input: 100-240V/1.2A, 50/60Hz, DC
output: 54V/1.67A) x1 for EP100-08-62
3. Rubber Footpads x 4
4. Quick Installation Guide
♦Install the Switch in a suitable temperature / humidity
environment.
♦ The power outlet should be within 1.82 meters (6 feet) of
the Switch.
♦ Visually inspect the power cord to make sure that it’s
secured fully to AC Power.
♦ Make sure that there is proper heat dissipation and
adequate ventilation around the Switch.
♦ Do not place any heavy objects on the Switch.
♦ Users can check for more technical specications at
http://www.soarnex.com
!NOTE: