Silent Sentinel Osiris PT Manuel utilisateur

OSIRIS INSTALLATION GUIDE
Commercial in Confidence 2/26
Silent Sentinel Limited reserves all the right. All in this manual including texts, pictures,
diagrams, and other contents belong to Silent Sentinel Limited. Without the written
permission, no one shall copy, photocopy, translate or disseminate all or part of this manual.
This manual is used as a guide. The photos, graphics, diagrams, and illustrations provided in
the manual are only used for explanation, which may be different from the specific product.
Please refer to the actual product. We try our best to make sure all the contents in this manual
are accurate. We do not provide any representations or warranties in this manual.
If you need the latest version of this manual, please contact us. Silent Sentinel recommends
that you use this manual under the guidance of professionals.
Version Control
Version
Author
Approver
Date
0.1
James Carlton-Long
James Carlton-Long
10/08/2021
1.0
James Carlton-Long
Matthew Short
12/08/2021

OSIRIS INSTALLATION GUIDE
Commercial in Confidence 3/26
Contents
System Overview ...............................................................................................................................................5
Overivew ........................................................................................................................................................5
Power / Interface Requirements ...................................................................................................................5
System Orientation........................................................................................................................................6
Mechanical Installation......................................................................................................................................7
Overview ........................................................................................................................................................7
Fixtures and Fittings;......................................................................................................................................7
Mounting the Jaeger PTU ..............................................................................................................................8
Attaching the Side Payloads ........................................................................................................................10
Wiper Assembly Installation ............................................................................................................................12
Overview ......................................................................................................................................................12
Fixtures and Fittings.....................................................................................................................................12
Boresight Guide................................................................................................................................................15
Overview ......................................................................................................................................................15
Horizontal Adjustment.................................................................................................................................15
Vertical Adjustment .....................................................................................................................................16
ANNEX 1 - Cable Information...........................................................................................................................17
Cable Overview ............................................................................................................................................18
Cable Pin Out ...............................................................................................................................................18
ANNEX 2 - Physical Connectors........................................................................................................................19
Osiris Base Connector..................................................................................................................................19
Side Payload Mounting Connector. .............................................................................................................20

OSIRIS INSTALLATION GUIDE
Commercial in Confidence 4/26
INSTALLATION SHOULD BE CARRIED OUT BY QUALIFIED PERSONNEL ONLY IN ACCORDANCE WITH THE
APPLICABLE LOCAL CODES.
THE MANUFACTURER CAN ACCEPT NO LIABILITY FOR ANY DAMAGES OR LOSSES CAUSED DUE TO
INCORRECT OR IMPROPER INSTALLATION.
Safety Information
Before installing the equipment, please read this guide carefully.
Installation of this product should only be carried out by a competent and suitably qualified
engineer. If you are in doubt, you should refer the installation to a suitably qualified person.
To prevent electrical shock hazards, disconnect the power from electrical sources before working
on the equipment.
Make all connections with the power turned off. Do not make or remove connections when the
power is turned on. Before using the product ensure that all cables are correctly connected and
that the power cables are not damaged.
Ensure that the product is secured correctly in all situations. Do not place the equipment on to a
trolley, table desk or other platform that is not stable; to avoid the product from falling over.
Ensure that the power supply to be used is correct for the equipment and the correct input voltage
for your region. If unsure, contact your local power supply company. If the power supply or cables
are broken, do not use them. Contact a qualified electrical services technician or your retailer.
1. Do not use any equipment that appears damaged or incomplete. If you detect damage,
contact your dealer immediately.
2. Do not allow connectors to be exposed to long-term water immersion.
3. Do not allow electrical contacts or leads to be exposed to dust, humidity or moisture. Do not
allow electrical contacts or cable-ends to become wet.
4. The equipment must be firmly secured using appropriate fixings and fastening as
appropriate to the mounting surface that the unit is being affixed to.
Notes:
1. Do not open the camera unit, doing so invalidates the unit’s warranty.
2. Do not back-drive the pan or tilt axis of the camera. To do so will damage the motor drive
mechanism and will invalidate the warranty.
3. Do not use caustic or abrasive cleaning products on the unit.
4. In situations where there could be a risk of injury should any part of the assembly become
detached for any reason and fall, normal safety precautions should be employed.
5. Use only the power source types indicated in this user guide or provided with the unit.
6. All power supplies should be appropriately fused.
7. Take extra care lifting or moving units due to their weight.
8. The central PT unit should be installed by itself with no payloads attached. The
camera/sensor and Radar payloads fitted individually, after it has been secured.
9. Take care to allow space around the unit for Pan and Tilt motion.
10.Take care to avoid striking persons or objects when the camera is in motion.
11. Not fitting the provided sun shields will invalidate the systems warranty.
12.This guide only concerns itself with the Mechanical Installation of the System.

OSIRIS INSTALLATION GUIDE
Commercial in Confidence 5/26
System Overview
Overivew
The Osiris PT system generally comprises of;
1. The Osiris PT Unit
2. QTY1 EO (Daylight Camera)
3. QTY1 Ti (Thermal Camera)
However, as the Osiris is a highly modular platform the number and nature of payloads may vary
from unit to unit. This Installation Documentation only considers the standard system as noted
above. If there is ANY uncertainty brought about by other combinations of payloads then Silent
Sentinel should be consulted prior to any installation efforts.
Power / Interface Requirements
Input voltages 28VDC (26-32 VDC)
Power 70W (150W peak) Standard payloads.
100W (150W peak) Large / Dual payloads.
These figures do not include the requirements of any large payloads, optional heating or cooling
devices added within the camera enclosures, nor optional infra-red lighting systems.

OSIRIS INSTALLATION GUIDE
Commercial in Confidence 7/26
Mechanical Installation
Overview
The system should be installed in the following order;
1. Pan / Tilt securely mounted to the Mast / Installation Location
2. Side Payloads
3. Cable / PSU
Note: The system should not be powered on when any of the payloads are attached.
Fixtures and Fittings;
The followings fittings are providing with the Jaeger System.
Figure 3 Jaeger Fittings
1. Sun Shield Fixings;
a. QTY4 –M4x10
b. QTY4 –M4 Nylon Washers
2. Side Payload Fittings;
a. QTY8 –M5x10
i. QTY3 for each Payload
3. Main Osiris Fittings
a. QTY4 –M8x20
b. QTY4 –Spring Washers
4. Duralac
a. To be used on all threads
Figure 4 - Duralac

OSIRIS INSTALLATION GUIDE
Commercial in Confidence 10/26
Attaching the Side Payloads
Note: please ensure you are attaching the payloads to the correct side. Please refer to the System
Overview section for further information.
Step
Detail
1
Protective caps are fitted to the ends of the
shafts to prevent moisture and impact
damage to the electrical connections.
Remove the three securing screws from the
tilt cover cap and remove the cap from the
tilt shaft.
Note: The IP67 protection of the unit is
compromsied whilst this cap is removed
and the payload is unattached.
2
Securely hold the tube and offer it up so
that the alignment holes engage on the
ends of the rods.
Level the tube so that the connector faces
are parallel with no leaning in any direction.
Push the tube inwards, along the alignment
rods such that the connector assembly
engages.
Care should be taken to keep the tube level
so as to reduce the risk of damage to the
electrical plug assembly.
Ce manuel convient aux modèles suivants
2
Table des matières





















