Senergy 2K Manuel utilisateur

Installation and Operation Manual
Applica :ble model 2K/3K/3.6K/4K/5K/6K
Version:00 Date:2021/06/02

Contents
U er ManualsC ntentso
Forward -----------------------------------------------------4
ApplicationModel-----------------------------------------------4
ApplicablePersonnel---------------------------------------------4
SymbolConventions---------------------------------------------5
1 Safety Precautions ------------------------------------------6
11PersonnelSafety---------------------------------------------6.
1 2 PV Inverter Protection - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6.
13InstallationSafety --------------------------------------------6.
1 4 Electrical Connections - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7.
1 5 Operating and Commissioning - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7.
16Maintenance------------------------------------------------7.
1 7 Additional Information - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8.
2Overview of the Inverter -------------------------------------9
21FunctionalModels--------------------------------------------9.
22NetworkApplication-------------------------------------------9.
2 3 Outline and Dimensions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10.
24WorkingProcess--------------------------------------------12.
25WorkingModes---------------------------------------------13.
3Storage ---------------------------------------------------14
4Installation ------------------------------------------------15
4 1 Checking the Outer Packing- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15.
42Movingtheinverter-------------------------------------------16.
4 3 Identify the PV Inverter- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -16.
4 4 Installation Requirements - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 17.
4 5 Installing a Rear Panel - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -22.
4 6 Installing the Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -24.

U er ManualsC ntentso
5 Electrical Connections--------------------------------------25
5 1 Connecting Protection Ground PGND Cables - - - - - - - - - - - - - - - - - - - - - - - - 25. ( )
5 2 Connecting AC Output Cables - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27.
5 3 Connecting the PV Strings - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30.
5 4 Connecting Communication Cables - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 34.
5 5 Power limit (optional) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 35.
5 6 Installation Verification - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 38.
6 System Operation ------------------------------------------39
6 1 Powering ON the Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 39.
6 2 Powering OFF the Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 39.
7 User Interface ---------------------------------------------40
7 1 LED specification definition - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 41.
7 2 LCD automatic-page-turning display - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 42.
7 3 LCD Warning display - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 43.
8 Maintenance -----------------------------------------------44
81RoutineMaintenance -----------------------------------------44.
8 2 Inverter Troubleshooting - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 45.
8 3 Removing the Inverter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -47.
9 Warranty --------------------------------------------------48
91QualityTerms-----------------------------------------------48.
92LiabilityWaiver----------------------------------------------48.
10 Disposal of the Inverter ------------------------------------49
11 Technical Specifications ------------------------------------50

4
Forward
Dear User,
Thank you so much for your choosing 2K-6K the latest generation of grid tied PV Strings, -
inverter hereinafter referred to as the inverter) designed and developed by the company( .
This user manual introduces the inverter in terms of its installation electrical connections, ,
, , , .operation commissioning maintenance and troubleshooting Please read through the manual
carefully before installing and using the inverter and keep the manual well for future reference, .
Grid tied PV string inverter-
Application Model
This user manual is intended for photovoltaic (PV) inverter operating personnel and qualified
electrical technicians.
Applicable Personnel
This user manual is subject to change specific please in kind prevail without prior notice( ) .
Notes:
2K/3K/3.6K
4K/5K/6K
U er ManualsForward

Indicates an imminently hazardous situation which if not correctly,
followed will result in serious injury or death, .
Indicates a potentially hazardous situation which if not correctly,
followed could result in serious injury or death, .
Indicates a potentially hazardous situation which if not correctly,
followed could result in moderate or minor injury, .
Indicates a potentially hazardous situation which if not correctly,
followed could result in equipment failure or property damage, , .
Calls attention to important information best practices and tips, :
supplement additional safety instructions for your better use of the
PV inverter to reduce the waste of your resource.
Refer to documentation (Remind operators to refer to the
documentation shipped with the inverter).
Symbol Conventions
Safety symbols used in this manual which highlight potential safety risks and important safety,
information are listed as follows, :
Symbol Description
WARNING
CAUTION
DANGER
NOTICE
NOTE
REFER
5
U er ManualsForward

1 Safety Precautions
Before using the product please read these safety precautions in User Manual carefully, .
a. The PV inverter must be installed electronically connected operated and maintained through, ,
specially trained technician;
b The qualified technician must be familiar with the safety regulations of electrical system. ,
working process of PV power generation system, and standards of local power grid;
c. The technician must read through this User Manual carefully and master it before any operation.
1 1 Personnel Safety.
a Do not tamper with any warning signs on the inverter enclosure because these signs contain.
important information about safe operation.
b Do not remove or damage the nameplate on the inverter’s enclosure because it contains.
important product information.
1 2 PV Inverter Protection.
a Ensure there is no electronical connections around ports of the PV inverter before installation. ;
. .b Adequate ventilation must be provided for inverter installation location Mount the inverter in
vertical direction, and ensure that no object is put on the heat sink affecting the cooling. (For
details, refer to Chapter 4 Installation)
1 3 Installation Safety.
As soon as receiving the PV inverter please check if it is damaged,
during its transportation If yes please contact your dealer immediately. , .
Please read the User Manual carefully before installing the PV inverter;
warranty or liability will be exempted from the company if damage is
caused by installation faults.
NOTICE
NOTICE
6
U er ManualsSafety Precautions

a Input terminals of the PV inverter apply only to input terminals of PV String do not connect. ;
any other DC source to the input terminals.
b Before connecting PV modules ensure that is its voltage is within the safe range when. , ;
exposed to any sunlight, PV modules can generate high voltage.
c All electrical connections must meet the electrical standards of the country or region. .
. , ,d Cables used in electrical connections must be well fixed under good insulation and with
appropriate specification.
1 4 Electrical Connections.
A. Before getting the permission of electrical power authority in the country/region, the grid-
tied PV inverter cannot start power generation.
b Follow the procedures of commissioning described in the user manual when commissioning.
the PV inverter.
c Do not touch any other parts surface except the DC switch when the PV inverter is operating. ' ;
its partial parts will be extremely hot and can cause burns.
1 5 Operating and Commissioning.
1 6 Maintenance.
Before installing the inverter check all electrical ports to ensure no,
damage and no short circuit Otherwise personal casualty and or fire. /
will occur.
While the inverter operating high voltage can lead to an electrical,
shock hazard and even cause personal casualties Therefore, . ,
operate the PV inverter strictly according to the safety precautions in
the user manual.
Power OFF all electrical terminals before the inverter maintenance;
strictly comply with the safety precautions in this document when
operating the inverter.
DANGER
DANGER
DANGER
7
When the photovoltaic array is exposed to light, it supplies DC
voltage to the PCE.
WARNING
U er ManualsSafety Precautions

a For personal safety maintenance personnel must wear appropriate personal protective. ,
equipment (like insulation gloves and protective shoes) for the inverter maintenance.
b Place temporary warning signs or erect fences to prevent unauthorized access to the.
maintenance site.
c Follow the procedures of maintenance stipulated in the manual strictly. .
. ;d Check the relevant safety and performance of the inverter rectify any faults that may
compromise the inverter security performance before restarting the inverter.
1 7 Additional Information.
To avoid any other unforeseeable risk, contact immediately,your dealer
if there is any issue found during operation.
NOTICE
8
U er ManualsSafety Precautions

2 Overview of the Inverter
This chapter introduces the inverter and describes its functional model network application, ,
, , .appearance dimensions and working process etc
2 1 1 Function. .
This series is a single-phase grid-tied PV string inverter transformer less that converts the DC( )
power generated by PV strings into AC power and feeds the power into power grid.
Figure 2 1 shows a model number of the inverter using 3K as an example. , .
3K
Power class code
Figure 2 1 Model number descriptions.
2 1 Functional Models.
The series applies to grid-tied PV power systems for outdoor power stations. Typically, a grid-tied
PV power system consists of PV modules, grid-tied inverters, AC distribution units, and low-voltage
power grid, as shown in Figure 2.2.
2 2 Network Application.
The inverter is transformerless Add an isolation transformer before.
grounding the positive negative terminal of PV modules like Thin/ (
Film module for operation) .
Do not connect PV modules in parallel to several PV inverters for
operation.
WARNING
WARNING
9
U er ManualsOverview of the Inverter
2 1 2 Model Description. .
2 2 1 Grid-tied PV Power Systems. .

2 3 1 Outline. .
Figures 2 3 to 2 7 show the outline of the inverters as follows. . :
2 3 Outline and Dimensions.
Figure 2 2 a low-voltage grid-tied PV power system.
PV strings inverter AC Distribution Unit low-voltage power grid
Figure2.4 4K-6K PV Inverter with Dual MPPT Input unit mm( : )
Figure2.3 2K-3.6K PV Inverter with Single MPPT Input unit mm( : )
10
320mm
344mm
137mm
350mm
347mm
137mm
U er ManualsOverview of the Inverter