Saito B2G Manuel utilisateur

INSTRUCTIONS
For
B2GBOILER&ALCOHOLBURNER
Readcarefullybeforeoperation.
-1-
Needlevalve
Overflowplug
Pressuregauge
(Option)
Safetyvalvefor
Boiler
Regulator
forWhistle
Regulator
forEngine
Oiler
Smokestack
Safetyvalvefor
Burner(Red)
Toanaccumulator
orDraintank
(Option)
Fromexhaustof
Draintank
(Option)
Pipinglayout
5-10mm
Toservo
B2GBurner B2GBoiler
T2GREngine
Whistle
Pre-heatingtray
CementthesesurfacestoHull
E
D
F
C
B
A
Close Close
Open
Open
Tobelinked
toservo
SectionF
Fixwithwoodscrewsforconvenience
soastotakein&outasunitsection
OIL
Burnernozzle
Glandnut

Installingdevices
*Whenoperatingyourboilerforthefirsttime,donotconnectitinitiallytotheengine.Theremaybe
foreignmatterintheboilerwhichcoulddamagetheengine.Firstflushouttheboilerforabout
tenminutesanddrainhotwaterthroughvalveport[B]beforetheinitialoperation.
(1)Placetheboiler,burner,andsteamengineonaflatsurface.Then
fixtheboilerandsteamenginewithwoodscrews.Theburner
shouldbefixedbyburnerbindingplatesattachedtothesurface.
(2)Connecteachsectionbyrubbertubesandmetalpipesreferring
tothefigure.
Preparationforoperation◆1.
Boiler
(3)Removetheoverflowplug[A]andthesafetyvalve[B].Fillwaterthroughtheportof[B]tillwater
comesoutfromtheportof[A].Placingatowelunder[A]isrecommendedsoasnottowetthe
surroundingarea.
(4)Thenfix[A]and[B]backtotheiroriginalpositionbyfingers.Donotusewrenchorpliers.◆2.
(5)Keepbothregulatorscloseduntil“Steamup”belowiscompleted.
Burner
*Useonlyalcohol(methanol)forfuel.DONOTuseotherfuelssuchasgasoline,paintthinner,
petroleum,etc.
(6)Closetheneedlevalve[D]usingtheattachedhandle.Ifnotclosed,alcoholwilldrainout.◆2.
(7)Removetheredsafetyvalve[C]andfilltankwithfuelto250cc(8.5oz)usingameasuringcupand
afunnel.Donotexceed250ccortheboilermaybedamagediftheflamecontinuestoburnafter
thereisnowaterleftintheboiler.
(8)Thenfix[C]backtotheoriginalpositionbyfingers.◆2.
(9)Placethepre-heatingtrayunderthenozzleandfillalcoholtoabout50%inthetrayusingthe
attachedsquirter.
Steamengine
*CarefullyreadtheinstructionmanualwhichcomeswiththeT2GRsteamenginebeforeoperation.
(10)Filltheoilerwithsteamoil(Blueliquid).Lubricatemetal,crosshead,crankshaft,eccentric,etc.as
wellasallrevolutionandmovementsectionswithmachineoilor50weightautomobileengine
oil.
Preparationforoperationisnowcompleted.
Slidetoinsert
undertheplates
Bindingplates
fixedwith
woodscrews
-2-

Ignitionoftheburner◆1.
(11)Lightthealcoholinthepre-heatingtray.Justbeforethealcoholisconsumed,opentheneedle
valveslowlytoabout15degreesforburnerignition.*Ifnotpreheatedsufficiently,thealcoholwill
notbevaporized.Insuchcases,closetheneedlevalveandrepeattheprocess(9)above.
*Themaximumopeningoftheneedlevalveisabout60degrees
fromfullclose.Adjusttothebestpositionafter10minutesʼ
operation.
*Usuallyitʼ snotnecessarytoopenneedlesofbothnozzles.When
youwantgreatersteamfortheengine,openingbothneedlesis
required.
Steamup*Usingthepressuregauge(option)ishighlyrecommended.
(12)Aftertheburnerisignited,ittakesabout8-12minutestoraisepressuresufficiently.Whenthe
pressuregaugeshows1.0~1.5kgf/cm2,opentheregulatorquicklytofullopenpositionandreturn
tofullclosepositiontogetridofremainingairinsidetheboiler.Thenpressuredropsimmediately
andrisesgraduallyagain.
(13)Whenthepressuregaugeshows1.0~2.0kgf/cm2,Steamupiscompletedandnowyoucan
operateregulatorstoruntheengineorusethewhistle.
CAUTION
◆1.Alwayskeepfuelcan,containers,andburnablematerialawayfromtheburner.Andkeepawet
towelnearbyforanemergency.
◆2.Excessivetighteningmaygreatlyshortenthelifeofpackings(O-ring,gasket,orglandpacking)
andevenstriporbreakthethreadedpartoftheneedlevalve,safetyvalves,andoverflowplug.
◆3.Alwaysusefixedwaterandfuellevelsfortheboilerandburners.
◆4.Donotfilluptheboilerwithhotwater.
◆5.Ifyourestarttheengineafterstoppingtheburnerforciblybyclosingneedlevalve,theremaybe
fuelremainingintheburner.Insuchcases,theburnercanbere-litimmediatelywhilethetankis
stillhot.ButthenDONOTaddanyfuel.
Orafteritgetscold,draintheremainingfuelfromtheburner(removethesafetyvalve[C]and
turntheburnerupsidedown),andfollowtheprocessoutlinedin(3)to(13)abovetorestart.
◆6.Incaseofengineracing,adjusttherpmusingtheneedlevalveandtheregulator.Operatingthe
engineathighrpmcancauseexcessivewearorotherdamage.
◆7.Aslongasyoufeedrecommendedquantitiesofwaterandfuel,theflamewillextinguishinabout
25minutes.Thequantitiesaremeasuredtoensurethattherewillbewaterleftintheboilerwhen
theflameisextinguished.Ifexcessivefuelisused,theboilerwillbecomeoverheatedafterthe
waterhasbeendepletedandtheflamecontinues.Thisdrysuperheatingcanbreaksomewelded
sectionsandcausesubsequentboilerleakage.Insomecases,severedamagecanresultwhich
cannotberepaired.
-3-
Fullopen
approx.60degs
Fullclose
0deg
Burnerneedleposition

◆8.
Ifyoufindsuchphenomenadescribedbelow,thereispossibilityofdrysuperheating.STOPthe
operationimmediatelytoavoidadditionaldamage.
#Eventhoughtheheatingpoweroftheburnerisstillstrongandstable...
-Pressuredoesnʼ tincrease.
-EngineRPMdecreases.
-Steamfromtheexhaustpipeisreduced.
#Paleflamesarecomingoutofthestack.
#Abnormalsmellorsmokeisobserved.
NOTE
◇1.
Thesafetyvalvefortheboilerworksatthepressureof2kgf/cm2.Thesafetyvalve(REDcolored)for
theburnerworksatthepressureof1.5kgf/cm2.Theoperatormustpaycloseattentionto
pressureswhichexceedthesenorms.
◇2.
Alwaysconfirmthatthesafetyvalvesarefunctioningfreelybydepressingthespringswhenfilling
thewatersupplyandfuelsupply.
◇3.
Closingtheneedlevalvewillextinguishtheflameandshutdowntheoperation.
◇4.
Becausecarbontendstocollectonthenozzles,cleanthenozzlesaftereverytenoperationsusing
theattachedwire.
*Donotuseawireotherthantheattachedonetocleanthenozzlesasanythickwiremayreduce
theheatingpowerbywideningthenozzlehole.Also,cleanthenozzlesfromthenozzleend
(boilerside).Donotloosenthescrewsof[E].
◇5.
Aboutheatingpowerweaknesses,refertotheCausesandCountermeasureslistedbelow
◇6.
Thewickendshouldalwaysreachthebottomoftheburnertoensuresteadyfuelflowandflame.
Ifthewickdoesnottouchthebottom,heatingpowerwillbereduced.Insuchcases,pushthe
wickdowngentlyusingawireorsimilarobject.Standardburningtimeisabout25minutes.If
burningtimeisover25minutes,itmeansthatheatingpowerisreducedandtheoperatormust
findandfixthecause(s).
Possiblecause
Fuelabsorbedmoisture
Excessivedustor
carboninnozzle
Foreignmatterprevents
valvefromclosing
Countermeasure
Replaceremainingfuelwithnewalcohol.
Cleanusingwireprovided.Afterremovingtheglandnutand
needle,passthewirethroughtheholesinthenozzle.
Whengasleakageiscausedbysomethingpreventingthevalve
fromclosingcompletely,cleanitcompletely
-4-
Allspecificationsandmodelsaresubjecttochangewithoutnotice.
http://www.saito-mfg.com
SAITO SEISAKUSHO CO., LTD.
22-7,3-chome,Tokagi,Ichikawa-shi,Chibaprefecture272-0024,Japan
Phone:047-378-4156FAX:047-378-4155

-5-
SmokingdeviceforB2G
発煙タンク(オプション)
より
Fromsmokingtank
(Option)
発煙装置
Smokingdevice
バーナー
Burner ボイラー
Boiler 真鍮パイプ
Brass-pipe
付属金具
Fittingpipe
発煙タンク
Smoketank
はめる
Insert
ネオプレンチューブ
Neoprene-tube
ニードルバルブ
Needlevalve
約2㎜
Approx.
バーナーハンドルで調節
Adjustwiththeburnerhandle
発煙タンク接続図ForB2G
FittingoftheSmoketankForB2G
・ニードルバルブをあけすぎると、生ガスの発生と、燃焼の妨げになります。あけすぎない
ようご注意下さい。
・オイルは、専用のスモークオイルをご使用下さい。
・ニードルバルブはデリケートなので、過度な開閉は避けて下さい。
・2回目からは、発煙タンク内のドレンを抜いてからオイルを入れて下さい。
・Toomuchopeningoftheneedlevalvecausesraw-gasanddiscouragecombustion.So
takecarenottoopenthenozzletoomuch.
・Usethededicatedoilforthesmoke.
・Theneedlevalveisverydelicatesoavoidopeningtoowideorclosingtootight.
・Fromthe2ndoperation,pourtheoilintothetankafterremovingwasteoilfromthetank.
汽笛へ
ToWhistle

-6-

-7-
NO Description Q'ty NO Description Q'ty
1 Boilerbody 1 11 Boilermount 1
2 Overflowplug 1 12 Boilerband 2
3 O-ringP3 1 13 ScrewM3 4
4 Safetyvalveforboiler 2 14 NutM3 4
S1 Safetyvalvebody 2 15 Superheatedtube 1
S2 Stem 2 16 Smokeemittingdevice 1
S3 O-ringP3 2 17 Smokechamber 1
S4 Spring 2 18 Smokechamberfittingscrew 2
S6 Cover 2 19 Washer 1
5O-ringP8 220Nut 1
6 Regulatorforthrottle 1 21 AlcoholtankforBurner 1
L1 Regulatorbody 1 22 Safetyvalveforburner 1
L2 Valve 1 S11 Safetyvalvebody 1
L3 O-ringP2 1 S12 Stem 1
L4 O-ringP3 1 S13 O-ringP3 1
L5 Lever 1 S14 Spring 1
L6 Cap 1 S16 Cover 1
L7 Glandpacking 1 23 O-ringP8 1
L8 Blankcap 1 24 Combustionnozzle 2
7 Locknutforregulator 2 25 Needlevalve 2
8 O-ringP6 2 26 Glandpacking 2
9 Regulatorforwhistle 1 27 Glandnut 2
L11 Regulatorbody 1 28 Plug 2
L12 Valve 1 29 Filter 2
L13 O-ringP2 1 30 Suctionstring 2
L14 O-ringP3 1 31 Locknut 2
L15 Lever 1 32 Band 1
L16 Capnut133ScrewM3 1
L17 Glandpacking 1 34 NutM3 1
L18 Blankcap 1 35 Burnermount 1
L19 Connectingpipetowhistle 1 36 Nut 1
L20 Locknut 1 37 Pre-heatingtray 1
10 Stack 1 38 Burnerbindingplate 2
PartListforB2G
Manuels Chaudière populaires d'autres marques

Vaillant
Vaillant uniSTOR VIH SW GB 500 BES Manuel utilisateur

Radijator
Radijator BIO max 23.1 Manuel utilisateur

Brunner
Brunner BSV 20 Manuel utilisateur

Buderus
Buderus Logamax GB062-24 KDE H V2 Manuel utilisateur

Potterton
Potterton 50e Fiche technique

UTICA BOILERS
UTICA BOILERS TriFire Manuel utilisateur











