Rubbermaid 5L10 Manuel utilisateur

Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides
proper drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important that
the steps are followed in the correct order). Review the
parts list and make sure that no parts are missing.
IMPORTANT – DO NOT RETURN TO THE STORE
For assistance with your Rubbermaid Storage Building
or for additional product information call our toll-free
Consumer Service number: 1-888-895-2110
M–F: 8:30 a.m. to 5:00 p.m. EST
or visit us online at: www.rubbermaid.com.
Installation Steps:
1. Site Preparation
2. Floor
3. Walls
4. Roof & Doors
5. Finishing
5L10
7T53
76 ¾"
27 ½"
55 ¼"
2028019
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service
Department can accurately and quickly assist you if necessary.

Description Part Number Assembly Letter Quantity Required Tools
Two Person Assembly
Floor
Front Floor 5L01 A1
Walls
Left Back 5L04 D1
Right Back 5L05 F1
Front Left Side 5L02 G1
Front Right Side 5L03 H1
Wall Connector 1V62 WC 5
Doors
Left Door 5L06 / 5L41 L1
Right Door 5L07 / 5L42 K1
Door Handle 5H74 T1
Lock Hasp 5F58 X1
Hardware
#14 x 3/4" Combo Pan Head Screw AA 24*
Accessory Bracket 5H88 4
Roof
Front Roof 5L08 J1
Roof Brace 5L36 RB 1
Safety
Glasses
Phillips Screwdriver
Rubber Mallet
Liquid
Soap
(2) Step Stools/
Stepladders
Drill
Gloves
Utility Knife
1/8" Drill Bit
Phillips Bit
5L10 / 7T53
PREASSEMBLY:
• Review ALL assembly steps before beginning construction.
• Review the parts list and make sure that no parts are missing.
* Extra screws are supplied
76 ¾"
27 ½"
55 ¼"
L
A
K
D
X
T
F
G
J
RB
H
WCx5
Safety
Glasses
Phillips Screwdriver
Rubber Mallet
Liquid
Soap
(2) Step Stools/
Stepladders
Drill
Gloves
Utility Knife
1/8" Drill Bit
Phillips Bit
NOTE:
• To simplify assembly and to ensure proper engagement of all components,
apply a mild detergent to dovetail and snap fits before assembling.
2

Build a solid, level surface for the shed foundation. Consult your
local building authority for ordinances, restrictions, or permits
required before building any structure at your home.
Note: Minimum dimensions for foundations shown.
FLOOR PLAN:
Size the construction site to fit the entire floor.
OPTIONAL STEP:
If desired, recessed anchor locations (5 places)
can be used to anchor the shed floor to a foundation
after you have constructed one.
55¼"
27½"
1.0 Site Preparation
"18
"24 "24
"~5
"~27-1/2
120.0
"24-7/8
"~55-1/4
"~4-1/2
"
3-5/8
"3-5/8
ANCHOR
LOCATIONS
Maximum opening
CARE & USE
• Shed can be cleaned with water and mild detergent as
necessary. DO NOT USE ABRASIVE DETERGENTS,
MATERIALS OR CLEANING TOOLS.
•To maximize your shed’s performance, remove
excessive snow and/or leaf accumulation from the roof.
• In the event of severe weather, please disassemble
and store in a secure location.
CAUTIONS
CAUTION: Always use gloves when using a utility knife.
CAUTION: Always use eye protection/safety glasses
during assembly.
CAUTION: When installing screws, do not overtighten.
CAUTION: Drill only through initial panel wall, unless
otherwise indicated.
3

2.0 Floor Installation
A
Using a rubber mallet and screwdriver, knock out the
tabs for the door hinge, 2 places on Front Floor (A).
b.
Drill pilot hole through top surface of floor, 2 places on Front Floor (A).
c.
A
Using a utility knife, cut the long side of each wall slot
tab and then use a rubber mallet and screwdriver to
knock it out 8 places on Front Floor (A).
a.
A
1.
2.
CAUTION: Drill through top surface of floor only!
4

3.0 Wall Panel G Installation
Using a screwdriver, punch out the screw holes on the
top of Front Left Side (G) 2 places.
a.
G
Screw Holes
G
A
Snap Front Left Side (G) into Front Floor (A).
Hold Front Left Side (G) upright to prevent it from
falling (until Left Back (D) is installed).
c.
G
ALIGN
ALIGN
click
A
Drill a pilot hole (using 1/8" drill bit) in front lower corner
at location indicated by screw target.
Note: This pilot hole is to be drilled through both walls.
b.
G
5

1
2
D
G
C
OVERHEAD VIEW
DETAIL 3-1_B
SCALE 1/1
DETAIL 3-3_E
SCALE 1/1
DETAIL 3-3_B
SCALE 1/1
DETAIL 3-4_B AND 3-5_B
SCALE 1/1
DETAIL 3-6_B AND 3-7_B
SCALE 1/1
3.1 Wall Panel D Installation
Connect Left Back (D) into dovetails of Front Left Side (G).
b. Engage snaps on bottom of Left Back (D) into
Front Floor (A).
c.
D
D
Using a screwdriver, punch out the screw holes on the
top of Left Back (D) 4 places.
a.
Screw Holes
HELPFUL HINT: Lubricate dovetails with liquid soap.
D
1
2
click
ALIGN
ALIGN
D
A
G
6

3.2 Wall Panel H Installation
Using a screwdriver, punch out the screw holes on the
top of Front Right Side (H) 2 places.
a.
H
H
Screw Holes
H
Snap Front Right Side (H) into Front Floor (A).
Hold Front Right Side (H) upright to prevent it from
falling (until Right Back (F) is installed).
c.
H
Drill a pilot hole (using 1/8" drill bit) in front lower corner
at location indicated by screw target.
Note: This pilot hole is to be drilled through both walls.
b.
ALIGN
ALIGN
click
A
7

Connect Right Back (F) onto dovetails of Front Right
Side (H).
Align the lap joint between Left Back (D) and Right Back (F).
b. Engage snaps on bottom of Right Back (F) into
Front Floor (A).
c.
DETAIL 3-1_B
SCALE 1/1
DETAIL 3-3_E
SCALE 1/1
DETAIL 3-3_B
SCALE 1/1
DETAIL 3-4_B AND 3-5_B
SCALE 1/1
DETAIL 3-6_B AND 3-7_B
SCALE 1/1
HELPFUL HINT: Lubricate dovetails with liquid soap.
1
2
H
F
F
OVERHEAD
VIEWS
DETAIL 3-1_B
SCALE 1/1
DETAIL 3-3_E
SCALE 1/1
DETAIL 3-3_B
SCALE 1/1
DETAIL 3-4_B AND 3-5_B
SCALE 1/1
DETAIL 3-6_B AND 3-7_B
SCALE 1/1
D F
H
F
2
1
Align Lap Joints
click
ALIGN
3.3 Wall Panel F Installation
Using a screwdriver, punch out the screw holes on the
top of Right Back (F) 4 places.
a.
F
F
Screw Holes
8

Install Wall Connector (WC) 5 places, connecting Left Back and Right Back Panels (D and F).
Position connectors in slots and slide down to snap in place.
d.
2
1
1
click
DF
OVERHEAD VIEW
D F
Install Wall
Connectors
WC
4.0 Roof Panel J & Door Installation
Install Front Roof (J) onto side sections. Align tongues on top of side walls into grooves in roof.
a.
RB
J
9

Ensure Front Roof (J) is positioned against the back wall tongues.
From outside the shed, install one Screw (AA) at each corner.
Hold the edge of the roof down firmly at the corners while installing each screw.
Install remaining screws into remaining locations of back walls.
c. AA (8)
J
1. 2.
3.
Helpful Hint: Installation is easier using a magnetic bit or starting
screws with a manual screwdriver to get seated. Pilot holes also
may be drilled using 1/8" bit.
Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown.
Lower the roof onto the walls and align Roof Brace (RB) into pocket in Front Roof (J).
b.
J
RB
10
Ce manuel convient aux modèles suivants
1
Table des matières
Langues :
Autres manuels Rubbermaid Stockage
Manuels Stockage populaires d'autres marques

Spectra Logic
Spectra Logic T-Series Spectra T50e Manuel utilisateur

Panasonic
Panasonic LKM-F931-1 Manuel utilisateur

Tabernus
Tabernus Enterprise Erase E2400 Manuel utilisateur

Rocstor
Rocstor COMMANDER 3F series Manuel utilisateur

HP
HP P9000 Manuel utilisateur

Western Digital
Western Digital Ultrastar Data60 Manuel utilisateur
















