PAW SolarBloC midi 2S Manuel du propriétaire

Installation and Operation Instructions
Solar stations
SolarBloC® midi Basic 3-line - DN 20
PAW GmbH & Co. KG
Böcklerstr. 11, 31789 Hameln, Germany
Phone: +49-5151-9856-0, Fax: +49-5151-9856-98
09/2023 99775810x-mub-en - V01 1

Table of Contents
1 General Information...................................................................................................3
1.1 About these instructions............................................................................................3
1.2 About this product......................................................................................................3
1.3 Designated use........................................................................................................... 4
2 Safety instructions......................................................................................................5
3 Mounting and installation [specialist]...................................................................... 7
4 Commissioning [specialist]........................................................................................ 11
4.1 Flushing and filling the solar circuit..........................................................................12
4.2 Preparations before flushing.....................................................................................15
4.3 Flushing and filling.....................................................................................................16
4.4 Setting the solar installation..................................................................................... 21
5 Maintenance [specialist]............................................................................................ 22
5.1 Replacement / adjustment of the pressure gauge...................................................22
5.2 Draining the solar system.......................................................................................... 23
5.3 Deinstallation..............................................................................................................24
6 Scope of delivery [specialist]..................................................................................... 25
6.1 2-line station............................................................................................................... 25
6.2 1-line station............................................................................................................... 27
7 Technical data............................................................................................................. 29
7.1 Dimensional drawing SolarBloC® midi Basic 3-line - two-tank solution................ 30
7.2 Dimensional drawing SolarBloC® midi Basic 3-line - two-roof solution.................31
7.3 Pressure drop and pump characteristic curve..........................................................32
8 Function of the check valves [Expert]....................................................................... 33
9 Disposal....................................................................................................................... 35
10 Commissioning report................................................................................................36
11 Notes............................................................................................................................37
Table of Contents
09/2023 99775810x-mub-en - V01 2

1 General Information
Carefully read these instructions before installation and commissioning.
Save these instructions in the vicinity of the installation for future reference.
1.1 About these instructions
These instructions describe the installation, commissioning, function and operation of the 3-line solar
station SolarBloC® for installations with two tanks (2S) or two roof solutions / two collectors (2D).
The chapters called [specialist] are intended for specialists only.
For other components of the solar installation, such as pumps, collectors, storage tanks, expansion
tanks and controllers, please observe the instructions of the corresponding manufacturer.
1.2 About this product
The station is a premounted group of fittings checked for tightness and used to circulate the solar
fluid in the solar circuit. It is mounted on wall brackets and fixed with clips.
The station contains important components and safety devices for the operation of the installation:
●Three ball valves in the flow line and in the return lines
●Three check valves (integrated in the ball valves)
●Three thermometers in the flow line and in the return lines
●Pressure gauge to display the installation pressure
●Two flow meters to display the flow rate
●Two ball valves to reduce the flow rate
●Solar pressure relief valve
●Airstop for an easy venting
●Flush and fill valves
1 General Information
09/2023 99775810x-mub-en - V01 3

1.3 Designated use
The solar station may only be used in solar thermal systems as a pump station in the solar circuit,
taking into consideration the technical limit values indicated in these instructions. Due to its design,
the station must only be mounted and operated as described in these instructions!
Only use PAW accessories with the solar station. Improper usage excludes any liability claims.
2S: two-tank solution 2D: two-roof solution
Under the influence of solar radiation, the collectors will heat up considerably.
The solar fluid in the solar circuit may heat up to more than 100 °C.
Only flush and fill the solar circuit when the collector temperatures are
below 70 °C.
1 General Information
4 99775810x-mub-en - V01 09/2023

2 Safety instructions
The installation and commissioning as well as the connection of electrical components require
technical knowledge commensurate with a recognised vocational qualification as a fitter for
plumbing, heating and air conditioning technology, or a profession requiring a comparable level of
knowledge [specialist].
The following must be observed during installation and commissioning:
●relevant local and national regulations
●accident prevention regulations of the professional association
●instructions and safety instructions mentioned in these instructions
WARNING
Danger of scalding due to the escape of hot fluids!
With pressure relief valves, there is a risk of scalding due to the escape of vapour or
hot fluid.
Please ensure for each pressure relief valve that no personal injury or material
damage may occur due to possibly escaping medium.
►Install a discharge line.
►Observe the instructions regarding the pressure relief valve.
►The pressures for the expansion tank calculated by the plant designer and
the operating pressure of the installation must be set.
CAUTION
Risk of burns!
The valves and fittings and the pumps can become heated up to more than 100 °C
during operation.
►The insulating shell must remain closed during operation.
2 Safety instructions
09/2023 99775810x-mub-en - V01 5

CAUTION
Personal injury and material damage due to overpressure!
Closing both ball valves in the primary circuit will separate the safety group from the
heat exchanger. A rise in temperature in the storage tank may result in high
pressures, which may lead to personal injury and material damage!
►Only close the ball valves for service and maintenance.
NOTICE
Material damage due to mineral oils!
Mineral oil products cause lasting damage to seals made of EPDM, whereby the sealant properties
are lost. We do not assume liability nor provide warranty for damage to property resulting from
sealants damaged in this way.
►It is imperative to prevent the EPDM sealing elements from making contact with substances
containing mineral oils.
►Use a silicone- or polyalkylene-based lubricant free of mineral oil such as Unisilikon L250L
and Syntheso Glep 1 from Klüber or a silicone spray.
2 Safety instructions
6 99775810x-mub-en - V01 09/2023

3 Mounting and installation [specialist]
NOTICE
Material damage due to high temperatures!
Since the solar fluid near the collector can be very hot, the group of fittings must be installed at a
sufficient distance from the collector field. It may be necessary to install an intermediate tank in
order to protect the expansion tank.
Not included in the scope of delivery!
Accessories: compression fitting
1. Push the union nut ②and the cutting ring ③onto
the copper pipe ①. The pipe must protrude at least 3
mm from the cutting ring in order to ensure the force
transmission and the sealing.
2. Insert the support sleeve ④into the copper pipe.
3. Insert the copper pipe with the plugged-on individual
parts (②, ③and ④) as far as possible into the body of
the compression fitting ⑤.
4. First, screw the union nut ②manually.
5. Tighten the union nut ②by rotating one full turn.
Secure the body of the compression fitting ⑤against
distort in order to avoid damaging the sealing ring.
3 Mounting and installation [specialist]
09/2023 99775810x-mub-en - V01 7

1. Remove the station from the packaging.
2. Remove the insulating front shell.
3. Loosen the clip spring for the fixation the pump
line of the 2-line station (see illustration).
4. Remove the line from the insulating shell.
5. In addition, mount the enclosed valve, hose connector and plug depending on the two-tank
solution (2S) or two-roof solution (2D):
2S: valve + hose connector [3.2] at 3 / plug [1.3] at 1
2D: valve + hose connector [3.2] at 1 / plug [1.3] at 3
6. Fix the clip spring in the groove provided at the ball valve and mount the line in the insulating
shell.
7. Screw the connecting piece [6] - depending on the application 2S / 2D) onto the return
connections of the 2-line station and the 1-line station, see chapter 1.3:
2S: [6.1] at [1.1] and [6.2] at [7.1]
2D: [6.1] at [3.4] and [6.2] at [9.4]
3 Mounting and installation [specialist]
8 99775810x-mub-en - V01 09/2023

8. Copy the mounting holes next to the
thermometers of the solar station to the
mounting surface.
9. Drill the holes and mount the solar station to the
wall with suitable wall plugs and screws.
10. Connect the solar station to the installation by
using the pipes as follows:
Two-tank solution:
①Common return to the collector field
⑨Return from storage tank 2
③Return from storage tank 1
④Flow to storage tank 1 and 2
⑤Flow from the collector field
Two-roof solution:
⑤Common flow from the collector field
①Return to collector field 1
⑦Return to collector field 2
③Return from the storage tank
④Flow to the storage tank
All thread connections have ¾" internal threads.
3 Mounting and installation [specialist]
09/2023 99775810x-mub-en - V01 9

Not included in the scope of delivery!
11. Connect the pipe for the expansion tank to [7.4]
and fix the bracket for the expansion tank.
12. Adapt the initial pressure of the expansion tank
to the system and connect the expansion tank.
Observe the separate instructions for the
expansion tank!
13. Check all thread connections and tighten them
if necessary.
WARNING
Risk to life and limb due to electric shock!
►Prior to commencing electrical work on the controller, pull the mains plug!
►Only after completing all installation work as well as the flushing and filling,
the mains plug of the controller can be plugged into a socket. This avoids an
unintentional start of the motors.
14. Connect the pumps and the sensors to the
controller.
The assembly of the solar station is now completed and the station can be put into operation.
3 Mounting and installation [specialist]
10 99775810x-mub-en - V01 09/2023
Autres manuels pour SolarBloC midi 2S
1
Ce manuel convient aux modèles suivants
1
Table des matières
Autres manuels PAW Système de contrôle