Oneida Air Systems STZ210000 Manuel utilisateur

oneida-air.com1-800-732-4065
Rev: 05/18/2020
Actual appearance may vary to that shown above.
INSTRUCTION SHEET
Telescoping Stand
21/23/28" Cyclone Separators
#STZ210000
#STZ230000
#STZ280000
Doc. #ZBI282321

2Oneida Air Systems, Inc.
Note: e Telescoping Stand is adaptable to a number of dust collection systems and is compatible with cyclone separators with
central angle rings that are 21, 23, or 28" in diameter. e height will vary for each conguration.
60-9/16"
1538 mm
26-5/8"
676 mm
22-1/2"
572 mm
21" Stand Dimensions
Position 1
82"
2083 mm
Position 2
92"
2337 mm
Position 3
106"
2692 mm
26-11/16"
678 mm
Refer to table above if you
are using a custom container
solution as the clearance height
may vary based on your waste
container size.
HEIGHT POSITION
COMPATIBLE CLEARANCE HEIGHTS
123
37-7/8"
962 mm
42-7/8"
1089 mm
47-7/8"
1216 mm
51-7/8"
1318 mm
56-7/8"
1445 mm
61-7/8"
1572 mm

3Oneida Air Systems, Inc.
60-9/16"
1538 mm
29-11/16"
754 mm
23-11/16"
602 mm
Position 1
82"
2083 mm
Position 2
92"
2337 mm
Position 3
106"
2692 mm
28-11/16"
729 mm
Note: e Telescoping Stand is adaptable to a number of dust collection systems and is compatible with cyclone separators with
central angle rings that are 21, 23, or 28" in diameter. e height will vary for each conguration.
23" Stand Dimensions
HEIGHT POSITION
COMPATIBLE CLEARANCE HEIGHTS
123
37-7/8"
962 mm
42-7/8"
1089 mm
47-7/8"
1216 mm
51-7/8"
1318 mm
56-7/8"
1445 mm
61-7/8"
1572 mm
Refer to table above if you
are using a custom container
solution as the clearance height
may vary based on your waste
container size.

4Oneida Air Systems, Inc.
Note: e Telescoping Stand is adaptable to a number of dust collection systems and is compatible with cyclone separators with
central angle rings that are 21, 23, or 28” in diameter. e height will vary for each conguration.
28" Stand Dimensions
60-9/16"
1538 mm
33-1/4"
845 mm
29-1/8"
740 mm
34"
864 mm
Position 1
82"
2083 mm
Position 2
92"
2337 mm
Position 3
106"
2692 mm
HEIGHT POSITION
COMPATIBLE CLEARANCE HEIGHTS
123
37-7/8"
962 mm
42-7/8"
1089 mm
47-7/8"
1216 mm
51-7/8"
1318 mm
56-7/8"
1445 mm
61-7/8"
1572 mm
Refer to table above if you
are using a custom container
solution as the clearance height
may vary based on your waste
container size.

5Oneida Air Systems, Inc.
ID PART # DESCRIPTION QTY
A STX283101 Top Telescoping Leg 4
B STX283102 Bottom Telescoping Leg 4
C STX283103 Long Support Brace 4
D AHX282321 Stand Hardware Pack 1
D1 STX002001 Stand Foot 4
D2 AFS015100 3/8-16 x 1" Hex-Head Bolt 80
D3 AFW190000 3/8" Flat Washer 80
D4 AFT000004 3/8-16" Whiz-Lock Nut 80
Please unpack the parts carefully and conrm you have received
each item listed. ere may be leover hardware.
ID PART # DESCRIPTION QTY
21" TELESCOPING STAND ONLY
E STX210001 Short Support Brace 6
23" TELESCOPING STAND ONLY
E STX230001 Short Support Brace 4
F STX230002 Cyclone Support Brace 2
28" TELESCOPING STAND ONLY
E STX280001 Short Support Brace 3
F STX280002 Cyclone Support Brace 2
G FPB280001 Filter Plenum Support Brace 1
System Contents
AB E
C
F
G
DD
D1D1
D2D2
D3D3
D4D4

6Oneida Air Systems, Inc.
Assembly Instructions
FIG. 1a
FIG. 1b
THE TELESCOPING STAND SHOULD BE INSTALLED ON A FLAT, STABLE BASE CAPABLE OF SUPPORTING
THE WEIGHT OF THE ENTIRE SYSTEM (INCLUDING FULL WASTE CONTAINERS) ONCE ASSEMBLED.
1Determine the location and orientation for
your installation, taking careful note of which
direction the dust collector’s inlet and lter
plenum will be facing [FIG. 1a].
Depending on your system's conguration,
refer to the table shown in [FIG. 1b] for the
Recommended Leg Position.
Note: We recommend that the stand be
assembled laying down and then raised into
position later on.
REQUIRED TOOLS RECOMMENDED TOOLS
9/16" Wrench Impact Driver Leveling Tool
9/16" Socket Wrench 2x4 Blocks
Torque Wrench
* You will need to supply your own mounting hardware if you wish to secure the Stand or Filter Option to the surface you are
mounting it onto (e.g. screws, washers, lag bolts, nuts, etc.).
LEG POSITION RECOMMENDED
SYSTEM CONFIGURATION
21" Cyclone
5 HP SMART
23" Cyclone
5 HP & 7.5 HP
28" Cyclone
10 HP
Single Drum
with/without Drum Dolly Position 1 Position 1 Position 1
Dual Drum
with/without Drum Dolly Position 2 Position 2 Position 2
Airlock with
1 Cu. Yd. Hopper Position 2 Position 2 Position 2
Airlock with
1-1/2 or 2 Cu. Yd. Hopper Position 3 Position 3 Position 3
Airlock with
Transfer Blower ANY ANY ANY

7Oneida Air Systems, Inc.
Assembly Instructions (Continued)
2Identify the positioning hole on each of the
Bottom Legs (B) and then slide a Top Leg (A)
into each of the Bottom Legs until the desired
height marker (#1, 2, or 3) is visible inside the
positioning hole [FIG. 2a]. Secure the Legs
together using four Bolts (D2), four Washers
(D3), and four Whiz-Nuts (D4) installed above
and below the positioning hole [FIG. 2b].
Repeat for each of the remaining Leg pairings
until you have four Leg Assemblies.
Note: e stand will adjust to three dierent
heights to accommodate varying waste
containers (dual-drum, airlock, etc.). You will
use the same height marker for each Leg.
FIG. 2a
FIG. 2b
D4 D2D3
Positioning Hole and
Visible Height Marker

8Oneida Air Systems, Inc.
Assembly Instructions (Continued)
3Place two Leg Assemblies from the previous
step on the ground about 5' apart . Align the
Leg Assemblies so the positioning holes are
facing up. Lay two Long Braces (C) onto the
Leg Assemblies to form the shape shown in
[FIG. 3a].
e Lower Long Brace must be positioned at
the correct clearance height for your waste
containment setup. Refer to the table shown in
[FIG. 3b] to see which is right for your system.
Refer to the table shown below for all available
clearance heights at each height position.
Secure the Long Braces to the Leg Assemblies
using four Bolts (D2), four Washers (D3), and
four Whiz-Nuts (D4) [FIG. 3c].
Note: Finger tighten only at this time.
FIG. 3a
FIG. 3c
FIG. 3b
D2
D3
D4
HEIGHT POSITION
COMPATIBLE CLEARANCE HEIGHTS
123
37-7/8"
962 mm
42-7/8"
1089 mm
47-7/8"
1216 mm
51-7/8"
1318 mm
56-7/8"
1445 mm
61-7/8"
1572 mm
CLEARANCE NEEDED
CONFIGURATION
Single Drum
with/without Drum Dolly
40"
1016 mm
Dual Drum
with/without Drum Dolly
40"
1016 mm
Airlock with
1 Cu. Yd. Hopper
43"
1092 mm
Airlock with
1-1/2 or 2 Cu. Yd. Hopper
50"
1270 mm
Airlock with
Transfer Blower N/A

9Oneida Air Systems, Inc.
Assembly Instructions (Continued)
FIG. 4b
FIG. 4a
4Flip the Assembly over and attach two Short
Braces (E) to each Long Brace (C) so that its
ns rest on top of the Brace and then secure
in place using three Bolts (D2), three Washers
(D3), and three Whiz-Nuts (D4) [FIG. 4a].
If you are installing a 28" Cyclone, you will
replace one of the top Short Braces with the
Plenum Support Brace (G) on the side where
your Filter Plenum will be located [FIG. 4b].
Note: Finger tighten only at this time.

10Oneida Air Systems, Inc.
FIG. 5a
FIG. 5b
FIG. 6
5Attach the two remaining Leg Assemblies
to each end of the previously installed Short
Braces as shown in [FIG. 5a]. Ensure that
all Leg Assemblies are attached in matching
positions.
Secure each Leg Assembly to two Short Braces
using four Bolts (D2), four Washers (D3), and
four Whiz-Nuts (D4) [FIG. 5b].
Note: Finger tighten only at this time.
6Attach the two remaining Long Braces (C) to
the Stand Assembly, making sure that they
align underneath the ns of the installed Short
Braces (E) . Secure them in place using six
Bolts (D2), six Washers (D3), and six Whiz-
Nuts (D4) for each Long Brace [FIG. 6].
Note: Finger tighten only at this time.
Assembly Instructions (Continued)
Ce manuel convient aux modèles suivants
2
Table des matières
Autres manuels Oneida Air Systems Support et étagère
Manuels Support et étagère populaires d'autres marques

Salamander
Salamander Acadia AC/W/L400/WH Manuel utilisateur

Fohhn
Fohhn VAT-09 Guide de l'utilisateur

ricoo
ricoo FS0522 Manuel utilisateur

AMSOIL
AMSOIL BMK-22 Guide rapide

Kargo Master
Kargo Master 48220 Manuel utilisateur

Milestone AV Technologies
Milestone AV Technologies SIMPLICITY SLF2 Manuel utilisateur













