
User manual
Caution: this product is heavy, at least two qualified people should perform the
assembly procedure. Care must also be taken while moving or positioning the
equipment.
Do not exceed the recommended load capacity per shelf, and the maximum weight
supported by the rack, as specified by the manufacturer’s specifications. Failure to
comply will void the warranty of this product.
Safety measures must be practiced at all times during the assembly of this product.
Caution: use the recommend tools to avoid damaging the parts.
RACK TIPPING HAZARD: ensure that the rack is properly anchored to the
floor before equipment is installed.
Nexxt solutions does not warrant against damage caused by the use of any Nexxt
Solutions enclosures for any purposes other than those for which it was designed or
damage caused by unauthorized attachments or modifications, and is not responsible
for any damages, claims, demands, suits, actions or causes of action of whatever kind
resulting from, arising out of or in any manner relating to any such use, attachments or
modifications.
*Bolt holes require user-supplied fasteners for fixed position installation.
1. Introduction
Thank you for purchasing the four-post open rack from Nexxt Solutions. Available with
42 rack spaces, these units are constructed of heavy-duty steel, allowing the safe
integration of networking equipment and additional accessories in environments or
areas that do not require a lockable rack solution. Designed for easy deployment in
high-load and high-density infrastructures, this 42U rack supports adjustable depths,
ideal for housing diverse IT equipment and other voice/data devices where space is at a
premium. Easy to install and to assemble, our open racks offer a cost-effective solution
for applications requiring increased flexibility, accessibility and cable management
capabilities.
Main features
• 4-post open frame rack
• Supports stationary loads of up to 771lb (350kg)
• Adjustable mounting depths (from 22 to 40 inches)
• Provides unobstructed airflow and easy access to installed equipment and cabling
• Front and rear equipment installation for larger networking systems
• Numbered square-hole mounting positions for faster attachment of 19-inch
components
• Powder coat finish prevents damage caused by rust and other external factors
For support and to find out more about our complete line of products and solutions,
we invite you to visit us at nexxtsolutions.com.
Carefully read and follow the safety
instructions included in this manual before
assembling and using the unit.
FAILURE TO FOLLOW THESE INSTRUCTIONS CAN LEAD TO
SERIOUS INJURY, DEATH, OR DAMAGE TO YOUR EQUIPMENT
IMPORTANT SAFETY INFORMATION
2.Preliminary steps
• Prior to installing this product, you must read all instructions thoroughly.
• Keep these instructions handy in an easily accessible location for future reference.
• A clean, flat, level, protected floor area should be provided for rack assembly to
prevent damage to parts.
• The installers may need to have the following items and tools available to assemble
and install the rack. They are not included in the box.
1. Phillips screwdriver
2. Power drill with the following bits:
M8 hexagonal-head tip
3. M8 hex to square socket adaptor
4. Pair of gloves
5. Long nose pliers
6. Cleaning towel
7. 3mx2m mat or padded surface
1 2 3 64 5
ELECTRICAL
SHOCK
HAZARD.
DANGER All parts of the unit must be properly grounded to the frame
of the rack and connected to the Common Bonding Network
(CBN) of your facility.