
PositiV® Installation Manual 9
3.9 With both units, walk to the desired installation location of the outdoor unit. Mount the
outdoor unit by either (a.) banding the unit to an exhaust vent using the provided pipe
clamp, (b.) screwing the unit to an RTU / air handling equipment, or (c.) screwing the unit
to concrete or masonry.
Note: A 5/32” drill bit will be required to drill the pilot hole for the masonry screws.
(a.) (b. or c.) (b. or c.)
(Please note the correct orientation of the outdoor unit in the image above.)
3.10 Once the outdoor unit is mounted, take the indoor unit to the desired installation
location of the indoor unit.
3.11 At the desired installation location, verify that the connection between units is
sufficient (> -95 dBi) using the RSSI Test from Step 3.8.
Note: If device connectivity is less than -95 dBi, reevaluate the installation locations. Ensure the line of sight is as
clear as possible and the distance between the units is minimized. If required, identify new installation locations
and reconfigure the devices.
3.12 If the device connection is sufficient, mount the indoor unit’s backplate to the wall by
peeling the double-sided tape and pressing it to the wall for 15-30 seconds.
Note: Clean the wall to ensure proper adhesion.