4
Release 03/18
ET2000 Guardrail Extruder Terminal
5.3 Installing the HBA Bottom Post
The rst post of the ET2000 Plus is a Hinged Breakaway
(HBA) post that comprises a top and bottom halve.
Installation commences by rst installing the bottom half
of the post as an individual item. This may be achieved by
•Driving the bottom post with an approved driving head
to the appropriate depth, approximately 1,800mm
or
•Auguring a 300mm diameter pilot hole approximately
1,800mm deep and force the HBA post to the
appropriate depth by impact or vibratory means with
an approved driving head after compaction. Backll
material shall be placed in 150mm lifts and compacted
with pneumatic equipment or heavy hand tampering
equipment for optimal compaction.
If rock is encountered when installing the HBA bottom
post, use either of the following procedures unless there
is a more restrictive Regulatory Authority specication
that should be followed:
•If rock is encountered with less than 500mm required
to complete the installation of the HBA bottom post
to full depth, drill a 300mm diameter hole in the
rock to the depth required to install the HBA bottom
post to full depth. Backll and compact the hole in
accordance with Section 5.6.
•If rock is encountered and more than 500mm is
required to install the HBA bottom post to full depth,
drill a 300mm diameter hole 560mm deep into the
rock. Install the HBA bottom post in the hole, cutting
o the bottom of the HBA bottom post so that its top
is at the correct elevation for proper installation. Backll
and compact the hole in accordance with Section 5.6.
Care must be taken to ensure the HBA bottom post is
installed perpendicular to the nished ground level. Once
installed the HBA bottom post should not protrude more
than 100mm above the ground line.
5.4 Installing the HBA Top Post
•Install the HBA top post by aligning the holes of the
ears on the HBA top and bottom posts. Refer to Figure
1 for the correct orientation
•In the 11mm diameter holes, install 3/8” (10mm)
diameter x 2” (50mm) hex head bolt (C1625) with a
3/8” (10mm) washer (C1620) and secure with a 3/8”
(10mm) lock washer (C1622) and 3/8” (10mm) hex
nut (C1626). The bolts should be installed so that the
nuts are on the inside of the ears
•In the 21mm diameter holes, install a .” (20mm)
diameter x 2.” (63mm) hex head high strength bolt
(C1619) with a .” (20mm) washer (C1617) and secure
with a .”(20mm) lock washer (C1624) and .”(20mm) hex
nut (C1618). There is no torque requirement for these
bolts. They should be tightened to a snug position. Do
not install the bolt on the shoulder side until the strut
is ready to be installed.
The HBA Top Post must be installed perpendicular
to the nished ground level. (±1° or 15mm angular
displacement at top of post).
5.5 Installing the SYT Posts
The SYT posts may be installed by using any of the
following methods:
•Driving the posts with an approved driving head to
the appropriate elevation, 730mm ± 20mm. Note
there is little tolerance in relative height of posts to
one another. Care in setting the posts to the same
height will facilitate a quicker installation.
or
•Auguring a 300mm diameter pilot hole approximately
1,100mm deep. Backll native material shall be placed
in 150mm lifts and compacted with pneumatic
equipment or heavy hand tampering equipment
for optimal compaction. Force the SYT post into
backlled hole to an appropriate depth by impact or
vibratory means with an approved driving head.
•If rock is encountered, drill a 300mm diameter hole in
the rock to the depth required to install the SYT post to
full depth. Backll and compact the hole. The material
removed from the hole may be used for the backll.
5.6 Backll of Posts in Excavated Rock Holes
Native materials may be used for backlling in overlying
soil. Backll material in excavated rock hole should be
compliant to ASTM C33 coarse aggregate size number
57 – reference Table 1.
Figure 1: Orientation of HBA Post
Trac
Side
Table 1: Grading Requirements for Coarse Aggregate
Size
No.
Amounts ner than each laboratory
sieve (square - openings), mass percent
37.5mm 25.0mm 12.5mm 4.75mm 2.36mm
57 100 95 to 100 25 to 60 0 to 10 0 to 5