i-team i-gum Manuel utilisateur

R
USER MANUAL
CHEWING GUM REMOVAL , GAS PROVIDE ENERGY
GAS VERSION I-GUM
Revision date: 2017-08-31

CONTENTS
Important Safety Instructions
Package Check List
Preparation For Use
Installation 1
Installation 2
Using the machine
Turning OFF the machine
Maintenance
Trouble shooting
Machine Parts
Accessory
Exploded drawing and spare parts list
Product Specification
Instruction for control panel
01~03
04
06~09
05
06~07
08
09
10~11
11
12
13
Safety Data Sheet
14
15~22
23~26

Maintenance/servicepeople
(not i-gum operators)
need to keep a distance to
the integrated magnets in igum
for 6 inch/15 cm when they are
doing maintenance on igum
and are wearing a pacemaker,
this is just a precausion advise
READ ALL INSTRUCTIONS
BEFORE USING THE
MACHINE
R
LITHIUM-ION BATTERY
Nominal Voltage:14.8V
Energy/Capacity: 6.6Ah
SAFETY ADVICE
Do not crush, pierce
or damage in any way.
Do not heat or incinerate.
Do not short-circuit.
Do not dismantle.
Do not immerse in any liquids.
Only charge between
5 C~40 C/41 F~ 104 F
and discharge
5 C~45 C/41 F~113 F
R
oooo
o o o o
IMPORTANT SAFETY INSTRUCTIONS
READ ALL INSTRUCTIONS BEFORE USING THIS MACHINE
01

IMPORTANT SAFETY INSTRUCTIONS
READ ALL INSTRUCTIONS BEFORE USING THIS MACHINE
DO NOT OPERATE THE MACHINE WITHOUT READING AND UNDERSTANDING THE
OPERATING INSTRUCTIONS. IF THE MACHINE IS OPERATED INCORRECTLY IT CAN POSE
DANGER TO THE OPERATOR AND OTHERS AND WILL INVALIDATE THE MANUFACTURERS
WARRANTY. BEFORE USE, READ AND UNDERSTAND THE FOLLOWING:
1. A Risk Assessment for the works to be undertaken.
2. MSDS Chemical Data Sheet.
3. Risk Assessment for Chemical use.
IMPORTANT NOTICE:
Cautions when using the machine:
Keep the body upright at all times when operation or when chemical or
batteries inserted.
The rechargeable battery has been designed to be fully charged BEFORE
each use
Only use the approved solution and batteries for the safe use of the machine.
Using other consumable items in the machine invalidated the warranty and
will lead to damage of the internal parts of the machine and also may pose
a risk to the operative.
Make sure the operator has read and understood these instructions before
attempting to use the machine and is fully trained in its operation.
Consumable Items:
Chemical (2 Litres) will last for approximately 2 hours of continual use. 4x chemical
bottles will last for approximately 8 continual hour’s operation.
The brushes will wear according to the surface being cleaned. Each Brush will last
for approximately 4 hours. 2x Brushes will last for 8 hours continual operation.
Only use the specifically designed brush as this has a jet incorporated for machine
to work correctly.
Choose a steel wire brush for solid urban surface such as concrete, natural stone,
tarmacadam, asphalt and other common urban surfaces. Choose a nylon brush
for soft surfaces such as manmade flooring, sandstone, heavy-duty carpet.
02
4. LPG data sheet.
Before inserting the LPG Gas and gum removal chemical correctly fit the
backpack to the operator by adjusting the straps to fit. The backpack has been
designed to be kept upright at all times when the LPG and gum removal
chemical are inserted. This is important to the operation of the machine.

IMPORTANT NOTICE:
Always complete a test patch on the above surfaces to make sure no damage occurs to
the flooring of surface
Service Pack:
When a machine is purchased, it require a service pack. Each service pack provides a
continuous 8 hours operation and consists of:
4x Chemical Bottles
2x Nylon wire Brush
3x Steel wire Brush
03
Warranty:
The Chewing Gum Removal machine should only be operated with the service
packs supplied. Using alternative supplies may cause damage to the machine
and cause a risk to the operative. Using alternative supplies voids manufacturer's
warranty.
2x LPG Gas Cartridges

Package Check list:
Broom with telescopic handle 1x LPG Gas Cartridges 2x
Nylon Wire Brush 2x
Water Drop Disk 1x Brushes Storage Tube 1x
Accessory:
Battery Charger 1x Cable For Charger 1x Steel Wire Brush 3x
MAIN BODY 1x LANCE 1x
Machine:
When you open the color box and you can find the parts as below showing:
Chemical bottles 4x
04

Machine parts:
Lance
Control panel
Trolley handle
Broom
Shoulder harness
& Waistband
Water drop disk
Wheel
Hose
Fluid inlet hole
Brushes Storage Tube
Battery Power Display
Gas Cartridges Drawer
Drawer Handle
Timer
05
Exhaust
Brush
Water level
Power Switch
Fuse
Charger Plug
Self-lock switch for gas valve

Installation1.
1. Install the water drop disk to body. 2. Screw a steel wire or nylon wire brush
onto the end of the nozzle of the lance.
close
open
3. Place the lance in the lance holder of body. There are 2 magnets can attract the lance.
(When you are in cleaning working or carry the machine on back, the lance should be taken on hand.)
06
Preparation For Use

5. Assembly the brush to telescopic wand for BROOM.
4. Open the brushes storage tube cap and you can place the other 4x brushes in the tube.
insert the brushes storage tube to the holder of body.
6. Insert the broom to broom holder of body.
(When you are in cleaning working or carry the machine on back, the broom should be taken on hand.)
07

Open the gas cartridges storage drawer and install the gas cartridges to gas caps.
Then push the storage drawer back (must be pushed to location).
(You also can install one gas cartridge, it is safety and the machine also can work.)
open
3. Insert Batteries
Installation2.
Before operating the machine:
1. Ensure that the battery has been fully charged before each operation.
2. Pour Chemical into fluid tank.
Take off the fluid inlet cap and then pour chemical into the fluid tank. (one battle is for each time).
08
Preparation For Use
close
Turn the gas cartridges to right
to tighten it, one by one.
DO NOT PLACE THE CHARGER IN PACKAGE,
WHEN IT IS IN CHARGING. BECAUSE CHARGER
NEED COOLING.
Autres manuels pour i-gum
2
Table des matières