
4. CONDESATION DRAINAGE
pg.2
Cold water supply outlet (3/4” female thread)
Hot water outlet (3/4” female thread)
Condensate drainage elbow*
PTR relief valve* (1/2” female thread 850kPa)
Electrical cable
Tempering Valve (high performance recommended)
ECV (if required by council - 700kPa)
Pressure Reduction Valve (PRV - 500kPa)
Non-return Isolation valve
Electrical access (50mm min.)
Electrical access dish (50mm min.)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11 .
5. BLEEDING THE SYSTEM
2
3
4
5
10
6
7
8
9
11
3. PLUMBING CONNECTIONS
1
Hand
screws
Tighten Loosen
Ensure at least one hot water tap is open inside
the property. While the system begins filling with
water, you will hear air being expelled from the
open hot water tap. This ensures that no air
pockets remain. Once water begins running out of
the hot water tap, the system is completely bled
and you can then turn the tap off.
6. TURNING THE UNIT ON
Remove Stainless Steel cover by simply loosening hand screws.
Unlock the screen by pressing the POWER button once.
Press and hold the POWER button for 3 seconds until the SUN symbol flashes.
Return screen cover back onto unit after setting clock
1.
2.
3.
4.
SYSTEM MUST
BE LEVEL
!
620mm
Dish
Condensate
drainage
elbow
1800mm
*Supplied with system