Hotblast HB1440E Manuel utilisateur

Wood Only Central Furnace
Owner’s Installation and Operation Manual
Model HB1440E
Installation is to be preformed by a
qualiedinstaller.
SAVE THESE INSTRUCTIONS
United States Stove Company
227IndustrialParkRd.
South Pittsburg, TN 37380 852854-3901F
U.S. ENVIRONMENTAL PROTECTION AGENCY
Certied to comply with the 2016 particulate
emissionstandards.Notapprovedforsaleafter
May 15, 2020
ThisunitiscertiedUL-391(R2014)
ReportNo.0215WH055S

-2-
CAUTION:
• Powersourcenotcontrolledbyfurnacemaindisconnect.
• Respectalllocalandnationalcodeswheninstallingthisunit.
• Thisunitisnottobeconnectedtoachimneyueservinganotherappliance.
• Thisunitisdesignedtoburnsolidhardwoodonly.
49”
24-1/16”
34”
2”
40”
34”

-3-
Combustible: Wood
Flue Pipe Diameter: 6”(153cm)
FluePipeType:(Standard,
SingleWall,orDoubleWall): BlackorBluedSteel2100°F(650°C)Class“A”
Minimum Chimney Height: 12’
MaximumLogLength: 27”
Electrical 120V,60Hz,2.6Aperblower(5.2Aonstartupforbothblowers)
Dimensions
Combustion Chamber:
WidthxDepth: 17.4”X28.3”
Volume:
CubicFeet: 5.2cubicfeet
DoorOpening:WidthxHeight: 11.6”X11.5”
Weight(lbs): 509lbs
Specifications
CONGRATULATIONS!
You’vepurchasedaheaterfromNorthAmerica’soldestmanufacturerofwoodburningproducts.
Byheatingwithwoodyou’rehelpingtoCONSERVEENERGY!
WoodisouronlyRenewableEnergyResource.Pleasedoyourparttopreserveourwoodsupply.Plantatleast
onetreeeachyear.Futuregenerationswillthankyou.
ThismanualdescribestheinstallationandoperationoftheHotblast,HB1440E
wood heater. This heater meets the 2016 U.S. Environmental Protection
Agency’s emission limits for wood heaters sold after May 15, 2016. Under
specicEPAtestconditionsthisheaterhasbeenshowntodeliverheatata
rateof18,850–56,000BTU/hr.Thisheaterachievedaparticulateemissions
rateof0.39lb/mmBtuwhentestedtomethodCSAB415.1-10(*andanoverall
efciency of 62.6 %). The maximum overall heat output of this heater was
testedtobe89,000Btu/hr.
Thiswoodheaterhasamanufacturer-setminimumlowburnratethatmustnotbealtered.Itisagainstfederal
regulationstoalterthissettingorotherwiseoperatethiswoodheaterina mannerinconsistentwithoperating
instructionsinthismanual.
Theoperationofthiswoodheaterinamannerinconsistentwiththeowner’smanualwillvoidyouwarrantyand
isalsoagainstfederalregulations.
Thisheaterisdesignedtoburnnaturalwoodonly.Higherefcienciesandloweremissionsgenerallyresultwhen
burningairdriedseasonedhardwoods,ascomparedtosoftwoodsortogreenorfreshlycuthardwoods.
Thiswoodheaterneedsperiodicinspectionandrepairforproperoperation.Itisagainstfederalregulationsto
operatethiswoodheaterinamannerinconsistentwithoperatinginstructionsinthismanual.
0215WH055E

-4-
Safety
• WARNING:Donotoperatewithfuelloadingorashremovaldoorsopen.
• Donotconnectthisunittoachimneyueservinganotherappliance.
• WARNINGDANGER:Riskofreorexplosion.Donotburngarbage,gasoline,naphtha,motoroil,orother
inappropriatematerials.Donotusechemicalsoruidstostartthere.
• WARNING:Riskofre.Donotoperatewithuedraftexceeding.060”watercolumn/14.93Pascals.Donot
operatewithfuelloadingandashremovaldoorsopen.Donotstorefuelorothercombustiblematerials
withinmarkedinstallationclearances.Inspectandcleanuesandchimneyregularly.
• CAUTION:Hotsurfaces.Keepchildrenaway.Donottouchduringoperation.
• Theheatexchanger,uepipe,andchimneymustbecleanedregularlytoremoveaccumulatedcreosote
andash.Ensurethattheheatexchanger,uepipe,andchimneyarecleanedattheendoftheheating
seasontominimizecorrosionduringthesummermonths.Theappliance,uepipe,andchimneymustbe
keptingoodcondition.Theseinstructionsalsoapplytoadraftinducerifused.Topreventameorsmoke
spillage,theslidebafemustbepulledoutandthefuelloadingdoorleftcrackedfor10secondspriorto
openingdoorfully.Loadfuelcarefullyordamagemayresult.
• Hotwhileinoperation.Keepchildren,clothingandfurnitureaway.Contactmaycauseskinburns.
• Donotusechemicalsoruidstoignitethere.
• Donotleavethefurnaceunattendedwhenthedoorisslightlyopened.
• Donotburngarbage,ammableuidsuchasgasoline,naphthaormotoroil.
• Alwaysclosethedooraftertheignition.
• Consultyourmunicipalbuildingdepartmentorreofcialsaboutpermits,restrictionsandinstallations
requirementsinyourarea.
• INSPECTFLUEPIPES,FLUEPIPEJOINTS,ANDFLUEPIPESEALSREGULARLYTOENSURETHATSMOKEANDFLUE
GASESARENOTDRAWNINTO,ANDCIRCULATEDBY,THEAIR-CIRCULATIONSYSTEM.
• CAUTION:CLEANOUTOFTHEHEATEXCHANGER,FLUEPIPECHIMNEY,ANDDRAFTINDUCER,IFUSED,IS
ESPECIALLYIMPORTANTATTHEENDOFTHEHEATINGSEASONTOMINIMIZECORROSIONDURINGTHESUMMER
MONTHS,CAUSEDBYACCUMULATEDASH.

-5-
Unpacking And Preassemble
UNPACKING
1. Removeallpackagingfromthefurnace.
2. Removethesuppliedpartsfromthefurnace.
BRICK ALIGNMENT
Inspect for any damage. Ensure that the bricks and ash plug are positioned correctly and not broken (see
illustrationforproperbrickarrangement).
TOOLS AND MATERIALS NEEDED FOR INSTALLATION
Thefollowingisalistoftoolsandmaterialsneededtoinstallyourfurnace.
• 7/16”socketwrench.
• 5/16”socket(Bestifusingapowerdrillandasocketbit).
• Pairofpliersorchannel-locks.
• Powerdrillwithan1/8”drillbittoinstallsheetmetalscrewsintoconnectorpipe..
• Sheetmetalscrews.
• Non-combustibleoorprotectorasspeciedinthismanual.
• Allchimneyandchimneyconnectorcomponentsrequiredforyourparticularventinginstallation..
• Electricalwiringtoolsandsupplies.
• Ductworkforsupplyandreturnair.
ProperFireBrickAlignment

-6-
Furnace Installation
Dimension Inch mm
ABackwalltoFurnace 28 712
BSidewalltoFurnace 16 407
CSidewalltoFlue 25 635
DBackwalltoFlue 18 458
ESupplyDuct(rst6feet) 6 153
FSupplyDuct(afterrst6feet) 126
G MinimumDuctheight 8 204
H Top of Door to Ceiling 48 1220
JMinimum Ceiling Height 77 1956
INSTALLATION OPTIONS
Theinstallation of this furnaceincludes supplying electrical power,return (fresh air) ductwork,and supply air
ductwork.Thisfurnacemaybeinstalledintwodifferentcongurations.
1. Standalonewoodfurnace
2. Add-onwoodfurnace
See kit installation section in this manual to ensure proper assembly, installation and operation of your new
furnace.
Ifinstallinginanareawithafanitshouldnotbeallowedtocreatenegativepressureintheroomwherethe
furnaceisinstalled.
LOCATING YOUR FURNACE (INSURE THAT THE REQUIRED MAINTENANCE CLEARANCES ARE MAINTAINED)
Yourfurnacemustbeinstalledasshowninthismanualandincompliancewithalllocalandnationalcodes.
It is of the utmost importance that the clearances to combustible materials be strictly adhered to during
installationofthefurnace.Refertothetableanddiagramsbelowforminimumrequiredclearances.
Back wall
Side wall
Side wall
Ceiling
Floor Protector
C
B
A
ML
N
K
E
F
G
H
J
D
Q
O
R
P
SS
Back wall
Side wall
Side wall
Ceiling
Floor Protector
C
B
A
ML
N
K
E
F
G
H
J
D
Q
O
R
P
SS
CLEARANCETOCOMBUSTIBLESCLEARANCETOCOMBUSTIBLES

-7-
MAINTENANCE CLEARANCES
Yourfurnacehasrecommendedminimummaintenanceclearancerequirements.Theseclearancesinsurethat
thereisadequateroomtopreformmaintenanceandserviceyourfurnace.DONOTstorefuelwithinthespecied
clearances.Seethetableanddiagrambelowtodeterminetheclearancesforyourfurnace.
Dimension Inch mm
K MaintenanceClearance(Front) 24 610
L MaintenanceClearance(Left) 24 610
MMaintenanceClearance(Right) 24 610
NMaintenanceClearance(Rear) 36 915
Back wall
Side wall
Side wall
Ceiling
Floor Protector
C
B
A
ML
N
K
E
F
G
H
J
D
Q
O
R
P
SS
Back wall
Side wall
Side wall
Ceiling
Floor Protector
C
B
A
ML
N
K
E
F
G
H
J
D
Q
O
R
P
SS
MAINTENANCECLEARANCE
FLOORPROTECTORREQUIREMENTS
FLOOR PROTECTOR
Thefurnacemustbeplacedonsolidconcrete,solidmasonry,orwheninstalledonacombustibleoor,onaoor
protector.Theoorprotectorisrequiredtoprovideheat,liveember,andashprotectionandmustbeofanon-
combustible,continuoussolidsurfacetoprotectagainstinltrationofliveembersandash.Floorprotectionmust
haveandR-Valueofatleast2.8. Refertooorprotectormanufacturer’sinstructionsfor installationdirections.
Theoorprotectorornoncombustibleoormustextendunderthefurnaceandbeyondeachsideasshown
below.
Dimension Inch mm
O* Front 16 407
P Flue rear 2 51
Q** Left 8 204
R** Right 8 204
S Flue Side 2 51

-8-
Duct Work Installation
We strongly recommend that the hot air ductwork be installed by a home heating specialist. If doing the
installationyourself, before you decide which installation will best suityourneeds, consult a qualied heating
technicianandfollowhisrecommendationsastothesafestandmostefcientmethodofinstallation.
Thisfurnacecanbeinstalledinthreeways,asastandaloneunit,parallel,andinserieswithanexistingfurnace.
SUPPLY AIR (HOT AIR) PLENUM
Thewarm-airsupplyductshallbeconstructedofmetalinaccordancewithNFPA90B,2-1.1.Theplenumsinstalled
tothefurnaceshallbeconstructedofmetalinaccordancewithNFPA90B,2-1.3.
Wheninstallingthisfurnacethehotairplenumistohaveaminimumheightof24”(610mm)ifthetopoftherst
verticalsectionisnotushwiththetopofthersthorizontalsectionofductwork.Ifthetopoftheplenumisush
withthetopofthersthorizontalsectionofductworkthentheminiumheightis15”(381mm).
RETURN AIR (FRESH AIR)
Thereturn(fresh)airintakeonthefurnaceisontherearoftheunit.Theductworkmustbemechanicallyattached
totheunitorUFB908blowerboxwithsheetmetalscrewstoensureaproperoperation.
STAND ALONE INSTALLATION
Ifinstallingthisfurnaceasastandaloneunit,ensurealllocalcodesandallinstructionsinthismanualarefollowed,
includingclearancetocombustibles,oorprotectorspecicationsandsafetywarnings.
24-1/16”
6”
SupplyAir(HotAir)DuctWorkOutletSize
Supply Air Plenum Minimum
HeightOf24”
SupplyAirPlenumWith
MinimumHeightOf15”

-9-
CENTRAL INSTALLATION
Air Filter Replacement

-10-
ASSEMBLY OF FURNACE
Yourfurnacerequiresthefollowingitemstobeassembledorinstalled
bytheserviceperson:
BlowersandBlowerControls
ElectricalConnections
1. Remove all parts from the unit (blowers, thermodisc, and all
wiring)andinspectfordamage,includingtherebrickassome
breakagecouldoccurduringshipment.
2. Installthe thermodisc on rear of furnacecabinetwith the two
screwsprovided.Mounttheconduitassemblyfromthejunction
boxtothethermostatbracket.Crimpthetwofemaleterminals
toeachofthewireleads.Plugthewirestothethermodisc.NOTE:
Itdoesnotmatterwhichofthetwowiresplugstowhichterminal
onthethermodisc.
3. Remove blowers from cartons. Remove junction box cover.
Attachclipnutsasingureshown.Installblower(s)andgasket(s
with1/4"-20x3/4"boltsasshown.
4. Wire right side blower rst (See wiring diagram) and replace
coveronjunctionboxonblower.
5. Wireleftblowersameasaboveandreplacecover.
SMOKE CURTAIN
Using two 1/4-20 x 1-1/4”
Carriage bolts, two smoke
curtain clips, and two nuts,
attach the smoke curtain in
placeabovethefuelfeeddoor
asshown.Afterinstallation,the
smoke curtain should swing
freelybackintothefurnace.
Accessory Installation
THERMODISC
THERMODISC
COVER
4” ELECTRICAL
JUNCTION BOX
BLOWERS
BLOWERS GASKET CLIP NUTS
(Not used in the upper center hole.)
DOOR LATCH INSTALLATION
Usethetwoincludedboltsandnutstosecurethehandletothestoveasshown.
Note:Adjustthehandleasneededtoinsureaproperseal.
Table des matières
Autres manuels Hotblast Four

Hotblast
Hotblast 1400E Guide de démarrage rapide

Hotblast
Hotblast 1551E Manuel utilisateur

Hotblast
Hotblast 1300 Manuel utilisateur

Hotblast
Hotblast 1300 Manuel utilisateur

Hotblast
Hotblast 1357M Manuel utilisateur

Hotblast
Hotblast 1300 Manuel utilisateur

Hotblast
Hotblast 1300 Manuel utilisateur

Hotblast
Hotblast HB1330E Manuel utilisateur

















