
Specifications
(3)
COMMPRO MODEL# XPRO-2500D XPRO-5000D XPRO-7500D XPRO-10000D XPRO-15000D
System Design
Treatment Configuration Single Pass Single Pass Single Pass Single Pass Single Pass
Feed Water Quality TDS < 2,000 TDS < 2,000 TDS < 2,000 TDS < 2,000 TDS < 2,000
Recovery with Recycle* 35%-50% 35%-50% 50%-75% 50%-75% 50%-75%
Rejection and Flow Rates*
Nominal Salt Reduction 98.50% 98.50% 98.50% 98.50% 98.50%
Permeate Flow Rate 1.8 gpm 3.5 gpm 5.4 gpm 7.1 gpm 10.5 gpm
Concentrate Flow Rate 2.0 gpm 3.2 gpm 4.5 gpm 6.0 gpm 8.0 gpm
Concentrate Recycle Flow Rate Up to 2.0 gpm Up to 2.0 gpm Up to 5.0 gpm Up to 5.0 gpm Up to 5.0 gpm
Water Connections
Feed Connection 3/4” CTS QC 3/4” CTS QC 1” CTS QC 1” CTS QC 1” CTS QC
Permeate Connection 1/2” QC 1/2” QC 3/4” QC 3/4” QC 3/4” QC
Concentrate Connection 1/2” QC 1/2” QC 3/4” QC 3/4” QC 3/4” QC
Membrane Elements
Membrane Quantity 1 2 3 4 6
Membrane Size 4” x 40” 4” x 40” 4” x 40” 4” x 40” 4” x 40”
Booster Pumps
Pump Type Multi-Stage Multi-Stage Multi-Stage Multi-Stage Multi-Stage
Motor HP 1/2 HP 3/4 HP 1 HP 1.5 HP 1.5 HP
RPM @ 60 HZ 3450 3450 3450 3450 3450
Electrical Specifications
Standard Voltage 110 1ph 60hz 110 1ph 60hz 220v 1ph 60hz 220v 1ph 60hz 220v 1ph 60hz
Safety Factor (SF) Amps 12.4 14.5 9 13 13
Weight and Dems*
Shipping Weight 135lb 150lb 225 lbs. 240 lbs. 255 lbs.
Approx. Dimensions (L x W x
H)
27” x 25” x 56” 27” x 25” x 56” 30” x 35” x 56” 30” x 35” x 56” 30” x 35” x 56”
*Based on internal testing, actual results may vary.
Operating Parameters
Design Temperature 77°F Max. Turbidity NTU^ 1
Max. Feed Temperature 85°F Max Free Chlorine ppm 0
Min. Feed Temperature 40°F Max. TDS ppm 2,000
Max. Ambient Temperature 120°F Max. Hardness GPC ^^ 1
Min. Ambient Temperature 40°F Max. ph (Continuous) 11
Max. Feed Pressure psi 85 Min. ph (Continuous) 3
Min. Feed Pressure psi 45 Max. ph (Cleaning 30 Min.) 12
Max. Operating Pressure psi 150 Max. ph (Cleaning 30 Min.) 2
Max. SDI Rating <3
Test Parameters: Static pressure test for 5 minutes.
^ Appropriate filtration must be installed in order to prevent premature membrane fouling.
^^ Scale prevention measures must be taken to prolong membrane life.