•Do not use the cable wire to pull and disconnect the power plug
•Always keep the grinder dry (internally and externally)
•Never put grinded coffee into the hopper or try to regrind coffee powder
•The H5 is a COFFEE GRINDER, never attempt grinding anything else other than roasted coffee beans.
8) MAINTENANCE AND SERVICE
Warning: grinder’s maintenance and repair should be performed by certified personnel or by your
local dealer. The procedures described below are the only user-level allowed maintenance
procedures.
Be aware of the grinder’s noise level. In case the noise level is higher than normal or irregular noises are coming
from within the grinder, get certified personnel to perform an overall check of the grinder.
A) Fuse replacement
1. Turn OFF main switch and disconnect the power cable from the socket
2. Open the fuse house (with in main switch and plug housing at the back of the grinder) by pulling it out like a
drawer.
3. Replace the tripped fuse with an identical size and rating fuse
4. Close the fuse housing, connect the grinder to the power socket and turn ON the grinder
B) G1/G2 grinding function changing
1. Turn OFF main switch and disconnect the power cable from the socket
2. Set the grinding setting to most fine till the dial knob reach the stopper
3. Empty the grinder from coffee beans and grind empty any residues of semi-grinded coffee
4. Remove the beans hopper lid and beans hopper (without the silicone rubber ring)
5. Use a cross head screwdriver to open the front screen housing screws
6. Gently pull out the front screen housing
7. observe the G1/G2 switch and change its position
8. Repeat the steps above backward to close the grinder
C) Grinding blades replacement:
Check the state of the grinding blades periodically (approximately every 50kg of grinded coffee) Good condition
blades will result in a high quality grind and prevent the Grinder’s overheating. Replace grinding blades every
500KG of grinded coffee (when using original replacement parts)
Warning: The replacement and assembly of a new set of blades is a delicate task. Perform blade removal and
assembly only if you are confident with your technical skills and after reading and understanding the entire
instructions below.
•Follow steps B)1 to B)6 above
•After releasing the front screen housing (step B)5 above), release the dial knob screw (for the entire following
operation make sure to keep the knob at most fine grinding position, don’t change it)
•Remove the 6 upper body screws and disconnect (pull upward) the upper body from bottom body
•Use the provided Allen Key to open the top grinding blade holder (3 screws)
•Use a crossed head screwdriver to release the grinding blades (bottom and top)
•Clean the blades holding surface (on the grinder) using a brush and vacuum cleaner to avoid any old deposits
on the blades sittings
•Use original replacements’ parts to assemble the new blades on the blades sitting and secure them with new
stainless steel screws
8
©HeyCafé Co., Ltd.