Traverse Installation and Commissioning Guide, Section 1: Installation Overview
Traverse Shelf Interface Specifications
Page 1-2 Force10 Networks Release TR3.2.3
Traverse Shelf
Interface
Specifications
Traverse shelf interface specifications are in the following chapters:
• Network Interface specification chapters
• Alarm, Timing, and Management specification chapers
• Power Interface specification chapers
• Cable Management specification chapers
6Install timing cabling. Section 9—Alarm, Timing, and Management Cabling
Procedures, Chapter 2—“Timing Interface Cabling,”
page 9-25
7Bring power cabling from the power
source (e.g., PDAP) to the back of
the shelf. Turn on power to the
shelf.
Section 10—Power Installation and Cabling
Procedures, page 10-1
8Insert the active GCM card and
install a cable between the RS-232
DCE interface on the card and a PC
or laptop. Set up basic parameters,
using the CLI interface.
Section 3—Alarm, Timing, and Management Interface
Specifications, Chapter 3—“Management Interface
Specifications,” GCM Ethernet and RS-232 DCE
Interface, page 3-14
Section 11—Node Start-up and Commissioning
Procedures, Chapter 1—“Node Start-up and
Commissioning,” page 11-1
9Install other management interfaces
as needed (DCN and DTE).
Section 3—Alarm, Timing, and Management Interface
Specifications, Chapter 3—“Management Interface
Specifications,” page 3-13
Table 1-1 Installation Process and References (continued)
Step Procedure Reference