
Document Part # 026-4275 Rev 0 Page 4 of 23
©2019 Emerson Climate Technologies Retail Solutions, Inc. This document may be photocopied for personal use.
Visit our website at http://www.emerson.com for the latest technical documentation and updates.
E2 Serial Port Setup
1. Log into the E2 by pressing the button
and enter “USER” for Username and “PASS”
for Password, then press .
2. Press ,, , to go to General
Controller Info.
3. Press twice to move to the C3: Serial
tab.
4. Press to highlight the Com6 Connection
value.
5. Press (LOOK UP) and select MODBUS-1
(if MODBUS-1 is being used, select
MODBUS-2 or MODBUS-3 connection), then
press to set configuration.
6. Press to select options and set the
MODBUS connection as follows:
7. Press to set configuration and to
save the changes.
8. Press to return to the Home screen.
Note: The XM670K MODBUS Connection must be set to
9600 baud.
Adding a XM670K_50 Controller in E2
1. Press ,, , to enter Connected I/O
Boards and Controllers.
2. Press once to move to C4: Third Party
tab. Highlight the XM670K_50 application
and enter the desired number of devices
under Quantity.
3. Press to save changes and to
return to the Home screen.
Commissioning XM670K_50 Controller
1. Press ,, , to enter the Network
Summary screen.
2. Highlight the XM670K_50 controller to be
commissioned by pressing the arrow key
then
Figure 12 - Serial Tab
Com6 Baud: 9600
Com6 Data Size: 8
Com 6 Parity: None
Com 6Stop Bits: 1
Figure 13 - Third Party Tab