
Page 9
Air Cleaning System ACS
4 Transport / Assembly / Installation
During assembly and installation, the applicable electro-technical, fire protection and local building control
regulations shall be complied with. For a perfect function of the unit and operational safety, proper
installation, operation and maintenance in accordance with these operating instructions are required.
Warning! Risk of material damage.
If the ACS module is moved to another place, the locking brakes on the steering casters must be
released. All electrical couplings must be disconnected as well as any mechanical fixtures to
adjacent furniture. Always ensure that the connection cable is secured such (e.g. using adhesive
tape) that it cannot get under the steering casters.
4.1 Mechanical
Move the ACS module to the intended place of installation. This place must be level and clean.
A minimum distance of 5 cm must be kept from combustible material, except for the electric supply cable of
the ACS.
When transporting the ACS module, do not move the unit over obstacles lying on or projecting
from the floor, otherwise the connection cable on the underside of the unit might be damaged.
Also ensure that the extraction module is in a horizontal position. To that end, the steering casters are
adjustable in height. To adjust the height of the casters, loosen the locknut using the supplied wrenches and
turn the axle of the corresponding caster. To reduce the height of the extraction module, turn the axle in a
clockwise direction, to increase the height, turn it in an anticlockwise direction.
To adjust the extraction unit properly, use a level. As soon as you have adjusted it to the correct height,
tighten the locknut again using the supplied wrenches.
To fix the unit at the place of installation, press down the locking brakes on the steering casters on the
operating side of the unit.
4.2 Electrical
Before commissioning, check the mains voltage and type of current. Make sure they match the
specifications on the rating plate.
The requirements of DIN / VDE 0100 ff. as well as the technical connection requirements of the local power
utility must be met.
The unit is provided with a connection cable with CEE connector for connection to an existing socket.
Ensure that an appropriate fuse/circuit breaker is provided for the 400 V / 32 A CEE socket (not included in
scope of supply). We expressly point out that the units may be damaged if the neutral conductor is
interrupted. The socket outlet must be easily accessible so that the unit can be disconnected from power
supply at any time. As a unit of protection class 1, it must always be connected to the earth conductor. The
cable must be routed such that it cannot be squeezed.
If you are not sure if all requirements are met, consult an electrician.
If the connection cable of this unit is damaged, it must be replaced by the manufacturer, its customer
service or a qualified electrician, to avoid any risks.
Equipotential bonding - connection for existing additional equipotential bonding protection system.
This sign is fixed to the front and the underside of the bottom of the unit and indicates the
position of the terminal.