DriSteem Vapor-logic3 Manuel utilisateur

Read and save these instructions!
VAPOR-LOGIC®
3
Installation and operation manual
Microprocessor-based humidifier control system
VL3-IOM-0301-METRIC.pdf 1 11/19/2009 9:22:32 AM

PLEASE: read this manual!
This manual will guide you through installation,
operation and maintenance procedures for your new
VAPOR-LOG C®
3 microprocessor-based humidifier
control system. Proper installation and operating
practices will ensure years of trouble-free service.
For information about your humidifier tank or
dispersion unit, please see the manuals for those
specific products.
For technical support, contact your DR -STEEM
distributor or call +44 1280 850122 or fax +44 1280
850124. f you have questions, first review Pages 54-
70, which describe typical problems and solutions, and
also list information you will need to give us if you call.
Corporate headquarters
14949 Technology Drive Eden Prairie, MN 55344
952-949-2415 800-328-4447 952-229-3200 (fax)
[email protected] (e-mail)
Visit our web site:
www.dristeem.com
For information about other DR -STEEM products,
visit our web site, or contact us using the information
listed below.
European office
Bell Place, Bell Lane Syresham, Brackley NNN13 5HP, UK
+44 1280 850122 +44 1280 850124 (fax)
[email protected] (e-mail)
VL3-IOM-0301-METRIC.pdf 2 11/19/2009 9:22:36 AM

VAPOR-LOGIC®
3table of contents.
Product overview
Features summary .................................................. 1-2
Circuit board diagram ............................................... 3
Main control board connections ............................ 4-6
Expansion board connections ................................... 7
Program code nomenclature .................................. 8-9
Warranty ................................................................. 10
Installation
nstallation checklist ................................................ 11
Proper wiring procedures ................................... 12-13
Control cabinet installation and wiring ................... 14
Keypad/display installation .................................... 15
Sensing devices installation (general) ................ 16-20
VAV sensing device installation .............................. 21
Temp comp sensing device installation .................. 22
Changing control input ........................................... 23
Table of contents
Operation
Start-up checklist ............................................... 24-25
Keypad/display overview ....................................... 26
Menu structure ........................................................ 27
Set Up menu information .................................... 28
Keypad/display readouts ......................................... 29
Main menu items explained ............................... 30-36
Control modes......................................................... 37
Modulation types ............................................... 38-40
Adjusting set point .................................................. 41
P D tuning.......................................................... 42-43
VAV, temp comp, dew point control ....................... 44
Heat-up, SDU timer, offsets, metric conversion ..... 45
Conductivity probe ................................................. 46
Float valve .............................................................. 47
Drain, flush, skim functions .................................... 48
Maintenance interval, EOS, date set ....................... 49
Safety features ........................................................ 50
Fault messages, diagnostics ............................... 51-52
Reports, multiple tank systems ............................... 53
Troubleshooting ................................................. 54-75
Replacement Parts .................................................. 76
Notes .................................................................. 77-79
VL3-IOM-0301-METRIC.pdf 3 11/19/2009 9:22:36 AM

VL3-IOM-0301-METRIC.pdf 4 11/19/2009 9:22:36 AM

1
Product overview
Product overview:
Summary of features
VAPOR-LOGIC®
3 features overview.
Accurate, responsive
microprocessor control
Our newest controller, VAPOR-LOGIC3,
provides unprecedented, comprehensive control for
RI-STEEM humidifiers. With expanded capabilities,
easy-to-use keypad, and modular, open protocol design,
the VAPOR-LOGIC3 efficiently controls all humidifier
functions.
Navigating the keypad to adjust or review humidifier
functions is an intuitive process of walking through
easily-read screen menus. The controllers open-
protocol design allows seamless integration with
building management systems.
You will find no other controller in the humidifier
market able to provide such functionality, ease of use,
and accurate RH control.
Control mode options
On-off operating mode controls single or
multiple electric staged outputs.
Expected accuracies: ±5-7% RH
Time proportioning function controls humidifier
outputs via cyclic actions on electrical contactors
or a modulated signal to our solid state zero cross-
fired SSR power controllers.
Expected accuracies:
Contactor action: ±2-4% RH
SSR action: ±1-3% RH
Proportional action controls modulating steam or
hot water valves or GTS burners by providing a
linear analog signal to the motors (for STS, LTS or
GTS humidifiers).
Expected accuracies: ±2-5% RH
More on next page ...
VL3-IOM-0301-METRIC.pdf 5 11/19/2009 9:22:36 AM

2
Summary of features
PID control provides the most accurate,
responsive and adjustable relative humidity (RH)
control.
Self-diagnostic test at start-up
End of season auto-drain
Real-time clock allows time-stamped alarm
tracking, and three ways to program drain and
flush cycles:
1. Usage (after a set number of kg have cycled
through)
2. Usage and time (set number of kg plus defined
period of time)
3. Scheduled intervals
Redesigned keypad has an intuitive interface with
backlit display and provides:
menu-driven access to all system functions
default screen for quick view of system status
and set points
data reports to track performance and efficiency
system diagnostics and alarm tracking for
troubleshooting
single-point multiple-humidifier control without
an additional system controller
password protection of setup parameters
wall-mounting with a standard telephone plate,
flush mounting, or hand-held options
Tank temperature sensor
preheats tanks for uninterrupted operation
senses for freeze protection
senses for low water/over temperature protection
Sensitivity to low-conductivity water (important
when using a standard humidification system with
low-mineral-content water)
Uses Echelons LonTalk®
, an open
communications protocol used by most major
control companies, allowing full interaction with
building management systems
Single-controller platform; modular design
The new VAPOR-LOGIC3 controller will soon be
standard on all RI-STEEM humidifiers. The base
configuration includes a main controller board and
keypad. Expansion modules will increase
capability, thereby allowing all systems to use the
same controller platform and keypad interface.
Year-2000 compliant
Product overview
VAPOR-LOGIC®
3 features overview.
Product overview:
Summary of features
VL3-IOM-0301-METRIC.pdf 6 11/19/2009 9:22:36 AM

3
Figure 3-1: VAPOR-LOGIC3printed circuit board
Product overview
VAPOR-LOGIC®
3 circuit board.
Product overview:
Printed circuit board
OM-VL3-3
Analog
control
inputs
195
179
8
8.5
107
Drain
valve
Fill
valve
Control
inputs
Water level
control input
Ø 2mm
(6) mounting holes
90
RJ-11
Cable
keypad
RJ-45
Cable
network
Power
indicator
Service
indicator
Analog
output
89.5
Control
inputs
To remote
fault indicator
(by others)
Outputs to
relays or
contactors
R=Resistive input
I=Current input
V=Voltage input
To expansion board
(ribbon cable)
Jumper connector
Ready
water
indicator
VL3-IOM-0301-METRIC.pdf 7 11/19/2009 9:22:36 AM

4
VAPOR-LOGIC®
3main control board connections
J1 Wire terminal supplies 24 VAC to power the
VAPOR-LOGIC3 control board.
ouble terminal T1 24 VAC, 10 VA maximum
load
Triple terminal T2 24 VAC common
J2 RJ11 female modular jack connection for supply
voltage and FTT-10A communication to keypad/
display
J3 RJ45 female modular jack connection for FTT-
10A communication to LonTalk® network
J4 Wire terminal connection for FTT-10A
communication to LonTalk network. Terminals A
and B provide the communication lines. The last
terminal is earth ground.
J5 End of line communication terminator pins
J6 Push-on connector for earth ground
J7 0-15 V C analog output, typically connected to
the input of a steam or hot water valve. Terminal
34 is the positive output signal and terminal 35 is
common.
J8 Connector receives necessary continuity input
signals from water detection devices:
Probe system water level detection
Terminal 30 detects maximum water level
from top probe rod and brown plug wire.
Terminal 31 detects water level at refill point
from middle probe rod and orange plug wire.
Terminal 32 detects water level at its lowest
point from lower probe rod and purple plug
wire.
Terminal 33 is the common return path for all
water detection rods from the humidifier tank
machine ground back to
VAPOR-LOGIC3 control.
I/RO system detection
Terminals 30 and 31 are not used.
Terminal 32 is connected to the humidifier
tank low water float switch (normally open).
Terminal 33 is the return signal from the float
switch to VAPOR-LOGIC3 control via
machine ground.
J10 Ribbon cable connector for VAPOR-LOGIC3
expansion modules
More on next page ...
Product overview
Main control board connections.
Product overview:
Main control board connections
VL3-IOM-0301-METRIC.pdf 8 11/19/2009 9:22:36 AM

5
Main control board connections (cont.)
Important note about J17, J18 and J19:
All connection diagrams show connector shunts
on J17, J18 and J19. The connector shunts and
appropriate software have been selected by
RI-STEEM based on original customer orders.
Field changing the input connector shunts will
require control input modification See Page
23 Changing Control Input.
J17 Jumper pins determine the configuration of the
type of input control into the RH sensor input
(terminals 21 through 23) for wire terminal
connector J26.
R = Resistance, 0-150 Ohms range
Used with on-off humidistats, staging
switches, PE switches
Used with analog 0-150 Ohm input device
(pneumatic transducer or humidistat)
I = MilliAmp, 0-20 mA range
Used with any humidity sensor with
4-20 mA output
Used with any computer or energy
management system with 4-20 mA output
Internal resistance 249 Ohms, terminal 22
proportional signal, terminal 23 signal
ground
V = Volts C, 0-15 volt range
Used with any control humidistat 0-15V C
Terminal 21 provides positive 21 V C
supply, terminal 22 proportional signal,
terminal 23 signal ground
Product overview
Main control board connections (cont.).
Product overview:
Main control board connections
J18 Identical to J17 input selector pins except used to
configure duct high limit RH input (terminals 24
through 26) for wire connector terminal J27
J19 Identical to J17 input selector pins except used to
configure window temperature sensor input
(terminals 27 through 29) for wire connector
terminal J28
J20 Wire terminal connector supplies 24 VAC voltage
via terminals 1 and 2 to the fill valve and via
terminals 3 and 4 to the drain valve.
J21 Wire terminal connector supplies 24 VAC voltage
via terminals 5 and 6 to the power contactor and
via terminals 7 and 8 to the S U relay.
J22 Wire terminal connection allows for remote fault
indication. Relay closure is provided
(1 A max.).
More on next page ...
VL3-IOM-0301-METRIC.pdf 9 11/19/2009 9:22:37 AM

6
Main control board connections (cont.)
J23 Wire terminal connection provides optically
isolated connection to air flow proving switch
and safety circuit. Terminal 12 supplies 24 VAC
to proving switch circuit, SPST, which closes
when air flow is present. Terminal 13 is the return
connection from the proving switch into the
VAPOR-LOGIC®
3 control. Terminal 14 supplies
24 VAC to safety circuit, SPST, which is closed
under normal operating conditions. Terminal 15
is the return connection from the safety circuit
into the VAPOR-LOGIC3 control.
J25 Wire terminal connector provides input for RT
tank temperature sensor. Terminal 19 supplies 21
V C to temperature sensor. Terminal 20 is the
return connection from the temperature sensor
into the VAPOR-LOGIC3 control. Terminal 18
has no connection.
J26 Wire terminal connector receives the necessary
signal from the controlling RH sensor.
Terminal 21: Positive polarity 21 V C supply
(25 mA max)
Terminal 22: Control signal
Terminal 23: Signal ground
Input selector pin J17 configures J26 input
Product overview
Main control board connections (cont.).
Product overview:
Main control board connections
J27 Wire terminal connector receives the necessary
signal from the duct high limit RH sensor.
Terminal 24: Positive polarity 21 V C supply
(25 mA max)
Terminal 25: Control signal
Terminal 26: Signal ground
Input selector pin J18 configures J27 input
J28 Wire terminal connector receives the necessary
signal from the window temperature sensor.
Terminal 27: Positive polarity 21 V C supply
(25 mA max)
Terminal 28: Control signal
Terminal 29: Signal ground
Input selector pin J19 configures J28 input
VL3-IOM-0301-METRIC.pdf 10 11/19/2009 9:22:37 AM
Autres manuels pour Vapor-logic3
1
Table des matières
Autres manuels DriSteem Système de contrôle

DriSteem
DriSteem Vapor-Logic Manuel utilisateur

DriSteem
DriSteem Vapor-logic 4 Manuel utilisateur

DriSteem
DriSteem Vapor-Logic Manuel utilisateur

DriSteem
DriSteem VAPOR-LOGIC 3 Manuel utilisateur

DriSteem
DriSteem Vapor-logic 6 Manuel utilisateur

DriSteem
DriSteem Vapor-Logic Manuel utilisateur

DriSteem
DriSteem Vapor-Logic Manuel utilisateur

DriSteem
DriSteem Vapor-logic3 Manuel utilisateur

















