Dauphin PHONE CUBE Manuel utilisateur


1
https://www.kctoolco.com/hazet-863p-1-4-reversible-ratchet/
MINI REVERSIBLE RATCHET 1/4“ DRIVE FOR
CORNER SCREWS ON TOP TRAVERSE BEAMS
ALTERNATIVE : 5MM ALLEN KEY
TOOLS REQUIRED:
HARDWARE INCLUDED:
BOTTOM FEET FILLERS
SCREWS FOR DOOR
COVERS FOR DOOR FRAME HOLES
ROOF CLIPS TO SECURE CEILING
8MM HEX BOLT SCREWS TO SECURE
PANELS TO TOP TRAVERSE
DESK KIT THREADED INSERTS
AND LOCK NUTS
TO SECURE DESK TO PANEL
RUBBER MALLET FOR INSERTING PANELS
1/8” DRILL BIT FOR DOOR
CORNER SQUARE TO ALIGN FRAME
FLAT PALLET KNIFE TO FACILITATE PANEL INSTALL
SPIRIT/LASER LEVEL TO LEVEL THE UNIT
CLAMPS TO FACILITATE PANEL INSTALL AND PLACING POST
#13 / 13MM FLAT WRENCH FOR LEVELING THE GLIDES OF
8MM HEX BIT WITH EXTENSION FOR HEX BOLT SCREWS
6MM ALLEN KEY FOR ROOF CLIPS
PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME
TWO 9 FT. STEP LADDERS FOR INSTALLING ROOF & PANELSMOVING CART/DOLLY FOR TRANSPORTING
PANELS, ROOF, AND POSTS
Req. Length for post-post: 48”

2
TOP TRAVERSE BEAMS
VERTICAL POSTS
SQUARE FLOOR BASE
MAIN ELEMENTS OF SKELETON FRAME:
STANDARD PHONE CUBE PANELS:
TECH ACOUSTIC PANEL
(DESK|POWER) GLASS DOOR GLASS PANEL STANDARD
ACOUSTIC PANEL
Fabric faces are applied to both sides of each Acoustic Panel
Tech Panel includes a conduit for power wiring to go through and T-nuts for the Desk installation

3
The 1026 marked beams will be installed on
the door side (Front) and opposite rear side.
Desk and Power can be installed on the rear.
The 1028 marked beams will be installed on
the sides (left and right) of the Cube. If the desk
is to be installed on the left or right, the beam
with the cut out must be installed on the
desk + power side.
One of the top traverse beams in each size (1026 and 1028) will have a cutout for power wiring to go
through this beam and the Tech panel.
The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges (left side),
but can also be installed on the rear or the right side.
LOCATION OF THE TECH PANEL FOR DESK AND POWER
POWER CUTOUT IN TOP TRAVERSE BEAM
1026mm
1026mm
(NO CUTOUT)
(REAR WITH CUTOUT)
TRAVERSE BEAM POWER CUTOUTS

- If floor is not level, build up spacers under
the corners that need to elevated.
-This will give the approximate measurement
of how much the corner post(s) will need to
be raised.
- Then remove the spacers.
COUNTERSINK FACE UP
1LOCATE WHERE PHONE CUBE IS TO BE INSTALLED AND CHECK FLOOR LEVEL
4
- Lay down the square floor base in the exact
desired location for the Phone Cube.
- Use the floor frame to check if the floor is
level.
1.a
1.b

5
Assemble two parallel sides by securing vertical
posts A and Bwith a 1026mm top traverse beam as
shown above.
The TRAVERSE Beam for the DOOR PANEL must have
NO CUTOUT.
Connect the opposite goal posts using the 1028mm
beams.
ASSEMBLE THE SKELETON FRAME (DO NOT TIGHTEN SCREWS ALL THE WAY)
TOP TRAVERSE BEAMS TO VERTICAL
POSTS CONNECTION DETAIL
2
DO NOT FULLY TIGHTEN SCREWS!
Screws will be tightened firmly later
at Step
B
B
A
A
A
A
B
B
TOP TRAVERSE BEAMS (TOP VIEW):
The screw
plates go IN the
vertical post.
A Ratchet with 5mm hex bit is
used to assemble the
TRAVERSE Beam.
8
2.a
2.b
2.c
TRAVERSE BEAM: WITH CUTOUT
TRAVERSE BEAM: NO CUTOUT

6
PLACE SKELETON ON FLOOR BASE & PREPARE UNIT FOR PANELS
3
4
- Place the leveling glides of the
Vertical Posts into the outer
holes of the floor base.
- Raise the post by lowering the
leveling glide of any corners
that had to be elevated with
spacers (Refer to Step )
3.a 3.b
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE
FLOOR (DISREGARD IF POWER SOURCE IS OUTSIDE THE CUBE)
Insert and feed the GST
end of the cable up the
conduit from the bottom
of the panel.
APPROX 33FT LONG
BOTTOM
TOP
GST
3 PIN
GST
3 PIN
1.b
Use the 13mm Flat Wrench to loosen/tighten the leveling glides
Adjusting Leveling Glides:
Loosening the leveling glides will
RAISE the post.
Tightening the leveling glides will
LOWER the post.

7
INSTALL THE PANELS INTO SKELETON FRAME
Push panel into frame. To facilitate,
use clamp.
Feed the GST through the panel cutout
if the power comes from inside.
4
5
PER STEP
Insert the Tech Panel
from the bottom on an
angle.
Do not fully tighten
the screws.
Repeat 5.a - 5.c for all Panels.
PLACE SKELETON ON FLOOR BASE & PREPARE UNIT FOR PANELS
Firmly tighten all panels once the panels and leveling
glides are in their correct locations
If necessary, use a flat
pallet knife to push in
the rubber gaskets.
5.a
USE 8MM
HEX BIT WITH
EXTENSION
5.d
INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE
FLOOR (DISREGARD IF POWER SOURCE IS OUTSIDE THE CUBE)
5.b 5.c

8
Install the door handles onto the door. Ensure the handles are
positioned as pictured facing the front of the glass door.
Install the door panel. Secure the door frame with two
hex bolt screws as done with the other panels.
PREPARE THE DOOR PANEL
INSTALL THE PANELS INTO SKELETON FRAME 6
Cut & pull out the plastic strips
once the door frame is installed.
USE 8MM HEX BIT
WITH EXTENSION
INSTALL THE DOOR PANEL
Remove the
door handle
package.
DO NOT REMOVE
Black Plastic Strips.
They keep the door
glass panel in the
door frame.
Unscrew the leveling
glides to remove the
protective piece of
wood from the
bottom of the door.
Screw the leveling
glides back into the
insert of the glass
door frame.
6.a
6.b
7
7. a 7. b

9
Square all corners and firmly tighten
all of the corner screws.
8SECURE PANEL LEVELING GLIDES AND CORNER BOLTS
All leveling glides
should be in their
respective countersink
Correctly Leveled Glass Door
Panel
Incorrectly Leveled Glass Door
Panel
9CHECK DOOR FITTING
-Insert all glides
into their respective
countersink holes.
-If necessary, use a
48” clamp from
post-to-post to
adjust the corner
leveling glides.
8.c
Click
Check that the door latch clicks when
closing the door.
9.a 9.b
8.a
1/4” Gap
- The front post leveling glides
should be adjusted to go into
their respective holes.
8.b
Uneven Door Gap