10Ref. : CH - 1249 - A - 2
Method
•Assemblethe8 studs 12 x 65around the rear section’sstart and returnorifices.
• Ifnecessary,insertthedistributor(seefigure22)inthereturnorificebyinterpolatingtheseal
(13).
• Placetheboilerinitsfinalpositionandlevelit,whichwouldbemadeeasierbythe"Adjustable
legs"option(chapter 3.1)
• Screwthepocketandthereducer(7)inaleaktightmannerinthefrontsection’supperorifice.
• Athreadedorifice Ø 2" isprovidedatthebottomof the front section,formountingavalve
enablingrinsingandflushingoftheinstallation’ssludge(werecommendmountingcoil,a90°
bend and the valve). A pre-cut space allows for passing the tubing in the casing’s lower
panel.
• Mountadrainvalvetightly(notprovided) ontheinstallationorinthelowerpart oftherear
sectionusingareducer(notprovided).
• Adrain valveØ3/4"is deliveredwiththe "Connectionsleeves"option(see chapter4.2).
• Connecttheflangesontheinstallation’stubing,thanfastenthemontheboiler,interpolating
the seal (13), with 4 HM 12 nuts and 4 washers for each.
• Afterhavingcheckedtheconnections,proceedslowlywithfillingtheinstallation,ensuringall
theairisvented,thenproceedtothehydraulictest((1.3xP.operation)tocheckallleaktight
areas.
• Screwtheshortestthreadedpartofthe4studsM8x40intherearsectionintheupperpart.
• Checkthattheleaktightnessbraid(21)isinplace.
• Engagethesmokebox onthestudsandfasten it(4HMnutsand 4washers)bytightening
thenutsmoderatelyandsimultaneously.
• Connecttheboilertothestackinthemostdirectpossiblemannerandwithoutreductionof
thesizeofthesmokeduct.Ensurethatthelatterisleaktight.
• Inserttheassembledbaffles(18)intheupper"flue-ways"and,ifneedbe,thesimplebaffles
(18a) in the lower "flue-ways" (see chapter 4 . 3).
• Screw the small threaded part of the 8 studs M 8 x 40 in the front section following the
indicationsoffigure10.
• Definetheopeningsideforthedoors.
• Mountthe hinges(1screwHM 10x30+ 1nutHM10 +2washersL 10foreach guide).The
doorguideislocatedoppositethehinges,intheupperpart.
• Dependingonthechosenopeningside,securethehinge(9a)oneachdoorusing2screws
HM12 x 35 +2 washersM12.
Caution:Forreasonsofpracticality,itisrecommendedtomountthefireboxdoorfirst.
• Mountthedoorsonthehingesusingtheaxes(11).
• Engagethedoors onthestudsandfasten them (4nutsHM10and 4 washersL10for each
door),tighteningthenutslightlyandsimultaneously.
• Dependingonthesizeofitsfixation,theburnerismounteddirectlyon thedoor,orviaa
perforated plate (see figure 11). Mount the burner plate (4 screws HM 12 x 35 + 2 washers
M12)onthechamberdoor,interpolatingtheleaktightnessseal(29).
- Aplainplatemaybeprovidedonrequest.
3 . 4 Operational assembly diagram
Operation
Open the "chamber accessories" parcel
Distributor (14 - 14a)
Installing the boiler
Sensor pocket (8)
Sludge flushing
Drainvalve (16)
Welding- flange (12)
Filling and hydraulic test
Smoke box (19 - 19a)
Stack
Optimizing baffles (18 and 18a)
Door hinges (9)
Door guide (10)
Door hinge (9a)
Chamber (22) and
Cleaning door (30)
Burner plate (28)