A typical installation of the NITE Plus generally takes
between 8 to 10 hours, although your particular
situation may vary. This manual contains step-by- step
installation instructions. It is divided into three
categories:
● General installation
● Electrical installation
● Heater installation (optional)
There is also a section on how to check your NITE Plus
to make sure the installation was successful, and a
section on how to operate your NITE Plus.
If relocation or reinstallation of any pre-installed
equipment is necessary for installation of the NITE Plus
equipment - please refer to the components manufacturer's
instructions or safety guidelines for proper installation.
Before you start, we highly recommend doing the
following to help make your installation as easy as
possible.
1. Lay out all parts and check to make sure you have
all parts listed on the parts list.
Depending on truck, some hardware may not
be used. If you are missing any parts, please call
1-866-204-8570.
2. To prevent damage to compressor, keep the NITE
Plus unit in an upright position at all times. If unit
is tipped, place back in upright position for a
minimum of 6 hours prior to running.
3. Check the list of tools needed for installation and
make sure you have all of them. Keep all tools
within easy reach.
4. Look through the whole installation manual to get
an understanding of the order in which
components are installed.
5. Make sure you have good lighting and enough
space to work in.
6. You may want to get an assistant to help you to
reduce the number of times you have to climb in
and out of the cab.
7. Make sure you wear all appropriate safety
equipment.