Apeks Force Manuel utilisateur

Version 1, January 2020
Apeks LLC ©
THE FORCE® 5000psi 2 STAGE
Botanical Oil Extraction System
Installation Manual

Apeks Supercritical: The Force® 2 Stage Installation Manual
Scan this QR code to get the most recent version of
the installation instructions:

Apeks Supercritical: The Force® 2 Stage Installation Manual
Table of Contents
1. Critical Safety Overview.................................................................................................................................................... 4
2. Facility Requirements....................................................................................................................................................... 6
Temperature .................................................................................................................................................................... 6
Ventilation and Dust Control ........................................................................................................................................... 6
Foundation ...................................................................................................................................................................... 6
Custom Layout ................................................................................................................................................................. 6
3. When the System Arrives ................................................................................................................................................. 7
Verifying Apeks System Contents List ............................................................................................................................. 7
Receiving the Crates ........................................................................................................................................................ 8
Apeks Labeling .......................................................................................................................................................... 8
TiltWatch and ShockWatch ....................................................................................................................................... 9
Inspecting Crates for Damage ................................................................................................................................... 9
System Layouts............................................................................................................................................................... 10
Unpacking Instructions................................................................................................................................................... 12
Uncrating Extractor Stand and Separator/Control Stand ....................................................................................... 12
Uncrating Diaphragm Compressor .......................................................................................................................... 14
Setup and Assembly ....................................................................................................................................................... 15
Coolant Line and TCU Setup..................................................................................................................................... 15
CO2Connections ...................................................................................................................................................... 20
CO2Vent Connections.............................................................................................................................................. 22
Air Connections ....................................................................................................................................................... 23
Jib Crane Connections.............................................................................................................................................. 25
Electrical Requirements ........................................................................................................................................... 26
Electrical Connections.............................................................................................................................................. 28
Temperature Control Units...................................................................................................................................... 32
E-mail Alerts and Software Updates ........................................................................................................................ 33
4. General Overview and Nomenclature............................................................................................................................ 34
System Overview............................................................................................................................................................ 34
Extractor Vessel Stand ............................................................................................................................................. 36
General System Specifications ....................................................................................................................................... 37
5. References .................................................................................................................................................................... 37
6. Appendices .................................................................................................................................................................... 38
Appendix A: Torque Requirements ............................................................................................................................... 38

Apeks Supercritical: The Force® 2 Stage Installation Manual 4
1. Critical Safety Overview
Please read these IMPORTANT SAFEGUARDS carefully before installing, operating or performing any user-
maintenance activities on the system, and SAVE THESE INSTRUCTIONS to refer to them as needed to ensure continued
safe operation. These instructions are critically important to your safety and proper operation of the system. Failure
to follow these instructions may result in damage to equipment and/or bodily injury.
•Ensure that a qualified safety officer oversees all installation, operation and user-maintenance activities
in accordance with this instruction manual.
•Ensure that only qualified personnel perform all installation, operation and user-maintenance activities in
accordance with this instruction manual.
Note:Qualified personnel are given documented training and should be qualified by the extractor
manufacturer or its designee, or as otherwise required by the Authority Having Jurisdiction (AHJ), prior to
performing any installation, operation or user-maintenance activities. Qualified personnel are to be
experienced in such work and must be aware of and take all safety precautions.
•Our subcritical and supercritical CO2extraction systems operate under high pressure. Operators must be
fully trained and familiar with the systems. Failure to operate these systems correctly can result in a rapid
release of high-pressure CO2and may cause equipment damage and/or bodily injury.
•Our subcritical and supercritical CO2extraction systems use large amounts of CO2during operation. These
systems should be installed in a well-ventilated area to prevent buildup of CO2, which can cause
asphyxiation. Always use a CO2monitor to ensure safe operations.
•WARNING - RISK OF INJURY: Opening a vessel under pressure can result in a rapid release of pressure
and ejection of material from inside the vessel. DO NOT ATTEMPT TO OPEN A VESSEL UNDER PRESSURE!
Always make sure a vent path for the vessel is opened and the corresponding pressure gauge reads zero
prior to loosening the vessel closure. If the handles are difficult to open, this may indicate that the
pressure vessel is still pressurized. Do not force it open. Any pressure in the pressure vessel can be
hazardous.
•WARNING – MAY CAUSE BURNS: Liquified gases are normally stored under pressure. When these liquids
are released to atmospheric pressure, rapid evaporation occurs resulting in reduced temperatures at the
point of evaporation. Exposure of tissue to evaporating liquid can result in freezing and tissue damage.
Precautions should be taken to avoid contact of liquid with eyes, skin, or respiratory system. Tissue
damaged by exposure to evaporating liquid should be treated as frozen tissue (i.e., frostbite). Reference
the Safety Data Sheet (SDS) for more detailed information.
•WARNING – RISK OF INJURY: Check that all components are secured before operating the extraction
system.
•Our subcritical and supercritical CO2extraction systems are designed to operate indoors in a temperature-
controlled environment. Extreme temperatures (below 60°F and above 80°F) will negatively impact the
functionality of the system, chiller, pump and CO2bottles.
•For indoor chiller and cooling system applications, only use propylene glycol and distilled water. Never
use deionized water in the chiller or cooling system for indoor applications. For outdoor chiller and
cooling system applications, use propylene glycol and clean tap water.

Apeks Supercritical: The Force® 2 Stage Installation Manual 5
•Extraction system components can weigh in excess of 2,000 lb. and must be moved carefully. Do not
attempt to move system pieces without the proper equipment, as this could result in serious injury
or death.
•Personal Protective Equipment (PPE) is recommended for persons during setup, operation,
disassembly, and clean-up of the equipment. It is recommended that operators wear the following
PPE:
oChemical-resistant safety goggles;
oGloves;
oEar protection devices;
oFlame-resistant clothing (when working with flammable solvents or in an otherwise
hazardous location);
oClose-toed foot protection; and
oRespirator mask.
•For CE Code-based installations and NEC-based installations, please refer to the following instructions,
as applicable:
oFor CE Code-based installations: “Installations shall be in accordance with the manufacturer’s
installation instructions and CSA C22.1, Canadian Electrical Code, Part 1 (CE Code), National
Fire Code of Canada (NFC), and CSA B149.1, Natural Gas and Propane Installation Code.”
oFor NEC-based installations: “Installation shall be in accordance with the manufacturer’s
installation instructions and NFPA 70, National Electrical Code (NEC), International Fire Code
(IFC), NFPA 1, Fire Code, and NFPA 58, Liquified Petroleum Gas Code.”
•It is the responsibility of the AHJ to verify the suitability of the extractors in the end installation in
accordance with all applicable codes, together with these installation instructions.
FAILURE TO FOLLOW THE INSTALLATION AND OPERATION PROCEDURES PROVIDED IN THIS MANUAL MAY
VOID THE EXTRACTION SYSTEM’S WARRANTY.

Apeks Supercritical: The Force® 2 Stage Installation Manual 6
2. Facility Requirements
Temperature
The Force® 2 Stage system is designed to run in a climate-controlled facility where the temperature is maintained
between 60°F and 80°F. System performance will decrease outside this temperature range, getting progressively
worse as temperatures deviate farther from the recommended range.
Ventilation and Dust Control
The Force® 2 Stage system should be placed in a well-ventilated environment that is free from excess dust from
other manufacturing operations.
Foundation
The Force® 2 Stage systems are designed to be installed on a concrete (or similarly stable) flat floor.
Custom Layout
The Force® 2 Stage systems are designed to be able to be located in different rooms or areas to isolate different
portions of the process. This modulation should be stated during the purchase process, otherwise additional costs
and delays may occur.

Apeks Supercritical: The Force® 2 Stage Installation Manual 7
3. When the System Arrives
Verifying Apeks System Contents List
Every Apeks machine is sent with a system contents list that contains a quality control checklist and a packing slip,
such as the one shown in Figure 3-1.
VERIFY THAT ALL ITEMS ON THE PACKING SLIP HAVE BEEN RECEIVED BEFORE CONTINUING WITH
UNPACKING AND INSTALLATION. CONTACT US IF ANY ITEMS ARE MISSING.
Figure 3-1: Packing Slip

Apeks Supercritical: The Force® 2 Stage Installation Manual 8
Receiving the Crates
Apeks Labeling
An Apeks sticker (such as the one shown in Figure 3-2) should be displayed on the outside of each crate. If the crate
delivered to you does not have an Apeks sticker, please contact us to ensure the crate came directly from Apeks.
Figure 3-2: Shipping Label

Apeks Supercritical: The Force® 2 Stage Installation Manual 9
TiltWatch and ShockWatch
Each crate should have TiltWatch Plus sensors and ShockWatch stickers (such as those shown in Figure 3-3) affixed
on the outside. The TiltWatch Plus Sensors indicate the degree to which the crate may have tilted to the right or
left or if the crate overturned completely during shipping. If the sensors show the crate tilted beyond 30° to the
right or left or overturned completely, please contact us. The ShockWatch sticker is an additional sticker that
indicates if the crate has been mishandled. If the indicator on the ShockWatch sticker is red, please contact us.
Inspecting Crates for Damage
Prior to opening any crate, you should verify that there is no visible external damage. If you notice your crate has
been damaged, be sure to note the damage on the applicable Proof of Delivery, and please contact us to report the
damage.
Figure 3-3: TiltWatch Label and ShockWatch Sticker

Apeks Supercritical: The Force® 2 Stage Installation Manual 10
The Force® 5000psi 2 Stage Standard Layout
Applicable to 20Lx20L and 40Lx40L Systems
Table des matières
Autres manuels Apeks hotte de ventilation



















