
5 Standards and directives 31
5.1 CE certification 31
5.2 EU declaration of conformity TruCon-
vert AC 3025
32
6 Installation 33
6.1 Inspecting the delivery 33
6.2 Disposing of packaging material 33
6.3 Transport 33
6.4 Storage conditions 33
6.5 Requirements for the site 34
6.6 Electrical connection 35
Establishing electrical connection 36
Connection diagram 39
Connection acc. to IEC 62109-2 40
6.7 Isolated operation 48
6.8 Setting grid codes 49
6.9 Dismantling 51
6.10 Shipping the module 52
6.11 Disposing of the module 52
7 Operation 53
7.1 Commissioning 53
Performing initial commissioning 53
7.2 Active interface 59
7.3 Operation via web-based user interface 60
Calling up the web GUI 60
Orientation of the user interface 60
Menu structure 64
7.4 Operation via Modbus 64
Establishing a connection 65
Addressing modules via Modbus 65
Modbus Register Map 67
7.5 Transmission of power 78
Switching the transmission of power on/off 78
7.6 Displaying and resetting messages 81
Messages of the web GUI 81
Modbus: displaying and resetting mes-
sages
83
2Table of contents 2022-03-23 A67-0141-00.BKen-0
01-09