
RG4 AND RG7
INSTALLTION AND MAINTENANCE
INSTALLATION AND TESTING
According to the specication requirements, congure leakage protection circuit breaker.
Open the packing and then clean up. Push the machine to the place planned. Check to make sure the surface is smooth and even top
prevent vibration while functioning.
Install glass door and wheels
Start the machine, and check that if the machine is working well;
To check for any potential leaks the general method is to apply soap foam to all pipe connections and then ll pressure gas pipeline
with the 4000Pa compressed air. If you see air bubbles materialize please check for a leak. If found, the strengthening or replacement of
the the leaking part should be done by professionals. Aer you have conrmed there is no leakage, proceed to the next step
Complete the above steps, conrm it can idle without any problem, then nish installing.
e equipment can not be used in wet or water leakage place.
Method of operation:
Connect to the electric power, turn on the power switch;
Turn on each motor switch, idle the machine to conrm it can run smoothly;
Puncture the chicken, ducks and other food into the forks. Adjust the distance between the two forks. When nish, shut the side door
and the front glass door.
Observe the product when roasting. Change the direction of rotation of the motor to ensure uniform cooking.
CLEARANCES
e area around the rotisserie must be kept free and clear of all of all combustibles and should never be within public access.
e minimum clearances to construction are as follows:
REAR: 6 INCHES LEFT SIDE: 3 INCHES RIGHT SIDE: 10 INCHES
e rotisserie machines with closed backs may be installed against a wall. e machines with glass on both front and rear are designed
to be installed in a front counter or window area.
• e installation of your rotisserie will inuence your success. e food continually rotates while cooking, creating a colorful display
and aroma. Remember to leave a sucient amount of room to withdraw the spits. ere must also be a space available in front of the
rotisserie for the display and maintenance of the drip pan.
MODEL RG4 -RG7
Southwood Manufacturing • A Division of US Restaurant Group • www.usrestaurant.com • sales@usrestaurant.com • (800)-764-1172