Diagram A: N line and PE line separate wiring, D series inverters;(For most countries)Diagram B: N line and PE line together, D series inverters;( Applicable to Australia)X3-Matebox basicQuick Installation Guide1. Introduction2. OverviewB A LoadObjectNameD C Grid(INV) GridF E BATEPS(Off-grid) (INV)BAT(INV)DescriptionLoad connection port Grid output portof the inverterBattery connection port(tobatteryBMS)Battery connection port of the inverterGridconnection port (to local grid)EPS(Off-grid) output portof the inverterABCDEF533cm204cm
437cm
3.1 Check Packing List3.2 Tools
Φ 10 and Φ 8 Drill
Marker Pen
Hexagon keysPhilips ScrewdriverDiagonal Plier
Crimping Plier
Inner hexagonal wrench
Monkey Wrench
Rubber hammer
Crimping Tool3. PreparationThe following tools need to be prepared before installation:4. MountingStep 1: Connect all brackets Then the Bracket C is fixed on theBAT bracket and the screws are locked ; Then set the bracket B on the bracket A and fix it with screws; Fix the inverter bracket on the bracket B;Inverter bracketMonkey WrenchTorque: 1.5±0.2N·mMonkey WrenchTorque: 1.5±0.2N·mMonkey WrenchTorque: 1.5±0.2N·m
Note: The position of the T-BAT-SYS-HV-(3.0) battery base mounting screws are two positions on the inner side, refer to the following figure:
Bracket ABracket BBracket CBAT bracketStep 2: Connect the BAT bracket and T-BAT-SYS-3.0 battery and push the whole structure to the wallMake sure all brackets (bracket A, bracket B, bracket C, inverter bracket and BAT bracket) are well and rmly installed.The inverterStep 5. Install the X3-Matebox on the wall and lock the screws.
The installation of X3-Matebox basic needs three brackets. A is used to hang the X3-Bracket Matebox,B is connected to both inverter bracket and Bracket A to fix the bracket position of Bracket the inverter, and C is connected to both Bracket A and BAT bracket to fix the bracket position Bracket of T-BAT-SYS-HV-(3.0).The bracket can be installed in two ways:1) With T-BAT-SYS-HV-(3.0) battery, the installation method is as follows: ( )2) With other batteries, the installation method is as follows: ( )Note: When brackets are mounted, a spirit level is used to keep inverter bracket and Bracket A parallel to the ground.Bracket A should be installed at a distance of 400mm (at least) from the ground if other batteries are to be installed.2)Bracket ABracket BInverter bracket400.00mmInverter bracketBracket ABracket BBAT bracket1)Bracket CSpirit levelPhilips screwdriverTorque: 1.5±0.2N·mPhilips screwdriverTorque: 1.5±0.2N·mMonkey WrenchTorque: 1.5±0.2N·mCheck the accessories according to the following list and ensure that nothing in the package is damaged before installation.Connect inverter bracket, Bracket B, Bracket A, Bracket C and BAT bracket all together with ange nuts.Set the Bracket C on the Bracket A; Note: The position of the T-BAT-SYS-HV-(3.0) battery base mounting screws are two positions on the inner side, refer to the following gure;Step 3: Fix the position, drill holes and install the whole structure on the walla) b) Φ10 drillc) Rubber hammerd)Step 4: Install the inverterc) Use the inner hexagonal wrench to tighten the inner hexagonal screw on the right side of the inverter.b)c )The inverterT-BAT-SYS-3.0 batteryd )Step 5: Install X3- Matebox basic b) Put the matebox on the bracket. And make sure the box is well xed on the bracket by screwing all nuts tightly. b)a)Φ 8 drill
65.00 mm80.00 mm
(Torque :2.5±0.2N·m)nut, Gasket, Matebox Load Grid
(Expansion bolts,Gaskets, Self-tapping bolts) *26 mm² Europeanterminals *19
CT *1
Bracket A *1Bracket B *1Bracket C *1Flange nuts (M4*4, M5*1)6 mm² OTterminals *2Earth connectors (450 mm *1, 250 mm*1) N-terminal adjacentbridge *1(for AU market)X3-Matebox basic *1
Documents6 mm² BAT terminals *2X3-MateboxNBATBatteryN-BAR for loadsN-BAR for EPS(Off-grid) loadsEPS(Off-grid) loadsLoadsInverterPV 1PV 2E-BARGridGridEPS(Off-grid)Main Breaker/RCD
BreakerBreaker
CTCT-RCT-SCT-TDistribution BoxNBATBatteryN-BAR for loadsN-BAR for EPS(Off-grid) loadsEPS(Off-grid) loadsLoadsInverterPV 1PV 2E-BARGridGridEPS(Off-grid)Main Breaker
BreakerBreaker
CTCT-RX3-MateboxE-BARNCT-SCT-TRCD
M5 inner hexagon bolts *1
Keys * 4Wi Dongle * 1a) Before install the inverter, remove the "DONGLE" waterproof plug(for the installtion of communication accessories); Insert wi into DONGLE port and lock DONGLE port and lock the four screw on the wi to x its position. b) Hang the buckle on the inverter to the corresponding position of the backplane.X3-Matebox basic is a critical part in one energy storage system, which integrates the DC breaker/AC breaker/switch unit/CT and so on, it can easily be installed compare to the traditional separate system, this unit can be used with Hybrid and Fit series inverters.There are 2 wiring diagrams for your system connection reference, please follow your local policy to chose which one is suitable for your side.a) Cut off all strips of the box except the strips on the back of the box before installing the box. Open the unlocked buckles of X3-Matebox basic, open the upper cover and remove the protective cover; (open the button by hand, open the cover and slide upwards.) d ) The bracket is aligned with the screw uses the inner hexagonal wrench to screw the tapping screw until the expansion bolt "bang" is heard.c) Insert expansion bolt into the nine hole, use rubber hammer to knock the expansion screw bolt into the wall. b) Move away the structure and drill holes at marked spots at different depths of 65 mm and 80 mm. a) With the position of the brackets as a template in step 2, use a spirit level to mark the nine holes needed on the wall with a marker pen. External hexagonalwrench Hexagon keys(Torque: 1.2±0.1N· m)