
10 11
3. Product Introduction 3. Product Introduction
4 Installation
4.1 Installation Prerequisites
When assembling the system, avoid touching the terminal with any metal objects
or bare hands. The box provides a safe source of electrical energy when operated
as designed.
The previous safety precautions and the warning messages described in this
section must be observed. If any of the previous precautions are not fully
understood, or if you have any questions, contact customer service for guidance.
The Safety Section may not include all regulations for your region.
Ensure that the installation location meets the following conditions:
ŸThe building is designed to withstand earthquakes
ŸThe location is far from the sea to avoid salt water and humidity, over 0.62 miles
ŸThe floor is flat and level
ŸThere are no flammable or explosive materials, at a minimum of 3ft
ŸThe ambiance is shady and cool, away from heat and direct sunlight
ŸThe temperature and humidity remain at a constant level
ŸThere is minimal dust and dirt in the area
ŸThere are no corrosive gases present, including ammonia and acid vapor
4.2 Safety Gear
Insulated Gloves Safety Goggles Safety Shoes
Installation and maintenance personnel must operate according to applicable
federal, state, and local regulations as well as industry standards regarding
product installation. Personnel must wear safety gear as indicated below in
order to avoid short circuit and personal injury.
4.3 Tools
These tools are required to install the box.
Torque Screw Driver Phillips-Screw Driver Hexagon Wrench
Phillips-Head Screw Driver Flat-Head Screw Driver Torque Wrench
Tape Measure Drill Pencil or Marker
4.4 Installation
4.4.1 Check for Transport Damage
Ensure the box is intact during and after transportation. If there are visible
damages such as cracks, contact your dealer immediately.
4.4.2 Unpacking
CAUTION!
According to regional regulations, several people may be required for
moving theequipment.
WARNING!
Unpack the box package by removing the packing tape. Ensure the box
modules and relevant items are complete. See the package items on
section 4.4.3 and check the packing list carefully. If any items are missing,
immediately contact SolaXor your distributor directly.
Strictly follow the installation steps. SolaX will not be responsible
for any injuries or loss incurred by incorrect assembly and
operation.
In practice, the requirements of box installation may be different due to
enviroment and locations.
In that case, follow up the exact requirements of the local laws and standards.
NOTE!
When installing the battery for the first time, the manufacturing
date between battery modules should not exceed 3 months.