F.3.3 Installation of cage, drive system guard rail on the top of cage and jib
------------------------------------------------------------------------------------------------------F5
F.3.4 Heighten the mast to 10.5m, then heighten the mast tie to 15m after
attachment of it----------------------------------------------------------------------------------------------F6
F.4 Installation of Electrical Equipment, Control System and Overload Protector
-----------------------------------------------------------------------------------------------------F6
F.4.1 Installation of electrical equipment and control system------------------------- F6
F.4.2 Installation of overload protection device------------------------------------------ F7
F.4.3 Overload protection device quick setup guide-------------------------------------F8
F.5 The Installation of Limit Cam at the Bottom of Mast and Power Driven Lifting
Test------------------------------------------------------------------------------------------------------------ F9
F.6 The Machine Commissioning-------------------------------------------------------------- F9
F.6.1 Guide roller gap adjustment---------------------------------------------------------- F9
F.6.2 Meshing clearance adjustment of rack and pinion------------------------------- F10
F.6.3 Clearance adjustment of back pinion and rack----------------------------------- F10
F.6.4 Adjustment of cable trolley ----------------------------------------------------------- F10
F.6.5 Adjustment of upper and lower limiting switch touch iron---------------------F10
F.6.6 All-Round lubrication of hoist-------------------------------------------------------- F10
F.7 Drop Test--------------------------------------------------------------------------------------- F10
F.7.1 Operational requirements of anti-falling safety device---------------------------F10
F.7.2 Drop test description-------------------------------------------------------------------- F11
F.7.3 Drop test method-------------------------------------------------------------------------F11
F.7.4 Reset of anti-falling safety device-----------------------------------------------------F12
F.8 Heightening of the mast (meanwhile installing the mast tie) and the installation of
limit cam block----------------------------------------------------------------------------------------------F12
F.8.1 Heightening of the mast----------------------------------------------------------------F12
F.8.2 Installation of limit cam on the top of mast----------------------------------------F13
F.9 Installation of Mast Tie--------------------------------------------------------------------- F14
F.10 Installation of Cable Guiding Device--------------------------------------------------- F14
F.10.1 Installation of cable collecting basket and cable protecting rack------------ F14
SC SERIES CONSTRUCTION HOIST INSTRUCTION MANUAL
SHENXI MACHINERY CO., LTD
www.shenxi.com,www.suspendedplatform.net