
RF Concepts, LLC
Product Release 1 List of Procedures
DOCNUMBER 9500
Document Issue 1.1
February 2010 Page v
List of Procedures
Procedure 3-1, “Prepare your station,” page 3–1
Procedure 4-1, “Unpack the amplifier and transformer,” page 4–1
Procedure 4-2, “Install the transformer,” page 4–3
Procedure 4-3, “Connect the transformer,” page 4–4
Procedure 4-4, “Connect the cables,” page 4–7
Procedure 4-5, “Connect the transceiver keying line,” page 4–10
Procedure 5-1, “Start up the amplifier,” page 5–5
Procedure 5-2, “(Optional) Change the antenna settings,” page 5–7
Procedure 5-3, “Autotune the amplifier,” page 5–8
Procedure 5-4, “Manually tune the amplifier,” page 5–9
Procedure 5-5, “Program the amplifier memory,” page 5–11
Procedure 5-6, “Operate the amplifier,” page 5–12
Procedure 6-1, “Set up to operate from a PC,” page 6–1
Procedure 7-1, “Clean the amplifier,” page 7–1
Procedure 7-2, “Replace the tube and fuses,” page 7–3
Procedure 7-3, “Upgrade firmware on the primary board,” page 7–4
Procedure 7-4, “Upgrade firmware on the secondary boards,” page 7–7