5
10.) If area to be paved is level and pushing truck is desired, place the hydraulic pump
variable speed control lever forward approximately 1/3. Select Low on the two-
speed selector valve. Throttle should be set at approximately ¾ open position.
Signal driver to leave truck dump body raised a sufficient height to allow asphalt to
flow slowly but continuously into the hopper.
11.) With the right and left extension control levers, adjust to the desired paving width if
the desired width is more than basic screed width.
12.) Move the right and left extension control levers to the “open” position and hold
until flow gates are completely open. Asphalt will then gravity feed down to and
form a head of asphalt at the leading edge of the screed.
13.) Move the right and left track control levers to the “forward” position. Continue
forward, laying asphalt and pushing the truck approximately 12 - 18 inches. If
vibration is desired on the screed, move vibrator control lever to “on” position
approximately the same time the track control levers are moved to the “forward”
position.
14.) Move both track control levers to “neutral” position, stopping the paver. Always
move vibrator control to “off” position when stopping forward motion of the paver.
It may be necessary to signal the truck driver to stop, if the truck is moving. The
truck should not be in gear nor should the driver “ride” the brakes.
Recommendation – advise the truck driver of the procedure in pushing the truck
with the paver.
15.) Check thickness/depth of asphalt in the 12-18 inch mat and make necessary
adjustment using the right and/or left manually adjusted depth control screws. Make
adjustments, up or down, gradually to avoid porpoising effect of ripples in the mat
as a result of adjusting too much in either direction. If the base on which the asphalt
is being laid is on grade and level, only infrequent adjustments will be required after
initial asphalt thickness/depth setting is made.
16.) Move right and left track control levers to “forward”, continuing to pave until
truck is empty and hopper is approximately 50% full. RECOMMENDATION –
leave small head of asphalt at leading edge of screed while waiting for next load of
asphalt. If wait is longer than 10-15 minutes, pave 12-18 inches further and again
leave a small head of asphalt. Repeat in 10-15 minutes intervals using asphalt
remaining in hopper until next load arrives.
17.) If the paver is to used independently of the dump truck, follow steps 1-9 of this
section.