O&M D3250 Manuel utilisateur

Maximum span - 7.0
100 % Duty cycle
Automatic Barrier
d3250
Made in
the

1. Inductions and warnings Page 03
2. Delivery, Movement and transport Page 04
3. General layout Page 05
4. Foundation Layout Drawing Page 06
6. Guide to Physical installation Page 07 -09
7. Commissioning Certificate Page 10
8. Manual release Page 11
9. Terminal connections Page 12
10. Control panel layout Page 13
11. Using the controller Display Page 14
12. Barrier Parameters Page 15
13. Barrier Timers Page 16
14. Barrier Time clock Page 17
15. Fault finding Page 18-19
16. Barrier Maintenance Page 20
17. Service Log Page 21
18. Technical Data Page 22
Index
D
3250

/ /20
Important Safety Notice
Automatic barriers are designed to Control the flow of vehicular
traffic only. It can be dangerous to allow the passage of
pedestrians and any other self-powered animal or device to
utilise this method of access without appropriate warnings and or
signage.
It may be necessary for the end user of this product to provide
an alternative, safe method of access to cater for the previously
mentioned categories.
The end user should fit all necessary signage and warning
notices to either side of the gate, which should be visible and
clear from all directions of approach.
The product that was shipped to you was designed with a control
program to protect all categories from harm or affect this
however is only a safety precaution and should not be modified
or tampered with by any unauthorised person not sanctioned by
the manufacturer.
Please sign and date below to say that you have read and
understood this notice before ANY installation work:
The “Warnings” leaflet and “Instruction booklet” supplied with this
product should be read carefully as they provide important information
about safety, installation, use and maintenance.
Scrap packing materials (plastic, cardboard, polystyrene etc) according
to the provisions set out by current standards. Keep nylon or polystyrene
bags out of children's reach.
Keep the instructions together with the technical brochure for future
reference.
This product was exclusively designed and manufactured for the use
specified in the present documentation.Any other use not specified in
this documentation could damage the product and be dangerous.
The Company declines all responsibility for any consequences resulting
from improper use of the product, or use which is different from that
expected and specified in the present documentation.
Do not install the product in explosive atmosphere.
The construction components of this product must comply with the
following European Directives: 89/336/CEE, 73/23/EEC, 98/37/EEC
and subsequent amendments. As for all non-EEC countries, the abovementioned
standards as well as the current national standards should
be respected in order to achieve a good safety level.
Information on using
this manual
? Read all information thoroughly
? Pay attention to all safety advice
? Be aware of the symbols (shown above right and
above left) as they have different meanings. One is an
information symbol, the other a warning.
? There are many artists impressions of the product in
this manual you should refer to the images as a guide
only. Professional CAD drawings should be used as
a reference drawing and nothing else. As before every
effort has been made to be 100% accurate in this
manual but we cannot make any guarantees.
? As we constantly innovate our products we may
change the quoted spec and any other details that
have been documented in this manual so you should
always refer to the supplier to see if the manual that
was shipped with your product is the latest edition.
? As with all electrical installations you should use a
qualified electrician and obey all of the latest laws and
regulations.
? Be sure to fill out and complete ALL paperwork where
instructed as this manual is the equipments log book
and maintenance manual.
The Company declines all responsibility for any consequences resulting
from failure to observe Good Technical Practice when constructing
closing structures (door, gates etc.), as well as from any deformation
which might occur during use.
The installation must comply with the provisions set out by the following
European Directives: 89/336/CEE, 73/23/EEC, 98/37/EEC and
subsequent amendments.
Disconnect the electrical power supply before carrying out any work on
the installation. Also disconnect any buffer batteries, if fitted.
Fit an omnipolar or magnetothermal switch on the mains power supply,
having a contact opening distance equal to or greater than 3mm.
Check that a differential switch with a 0.03A threshold is fitted just before
the power supply mains.
Check that earthing is carried out correctly: connect all metal parts for
closure (doors, gates etc.) and all system components provided with an
earth terminal.
Fit all the safety devices (photocells, electric edges etc.) which are
needed to protect the area from any danger caused by squashing,
conveying and shearing, according to and in compliance with the
applicable directives and technical standards.
This equipment is part of a large range of traffic flow products. They are designed to be easy to install, as
all settings and internal wiring have been completed in our factory. Any of the instructions in this manual
should only be carried out by a qualified service engineer or a competent person.
The barriers are ready to bolt down, connect to a single phase power supply and have any pre-cut loops
wired into them (Please note that loop detectors are sold separately). The steps must be completed before
the power is turned on to prevent accidents.
The following information is a guide only, and whilst we have made every effort to be accurate and correct
there may be printing errors which we cannot be held responsible for.
With a correct installation you can expect to enjoy many years of reliable service from this product, we do
however recommend that the product has a bi-annual service carried out by a qualified engineer. Please
contact our service department to obtain a quote. As we manufacture the products we are best suited to
care for your equipment.
Introduction and Warnings
D
3250

Incorrect Correct
This article describes how your equipment will be delivered to you, specifications on the transportation
used and advice including health & safety on movement of the equipment.
The manufacturer will use a qualified transport company to deliver the product conforming to the
necessary regulations as detailed below:
?All drivers are qualified
?All drivers are tested once yearly ( If applicable )
?All drivers carry risk assessments and method statements (available on request)
?They are controlled under law to conform as there are no trade regulation standards to comply with
Health and safety Considerations:
Moving Goods Safely (MGS) is a national project involving both the Health and Safety Executive (HSE) and
Local Authorities (LA) working in partnership. The project aims to reduce injuries and ill-health arising from the
movement of goods from supplier through haulier to the recipient and end user including any home deliveries.
The project will focus upon the delivery and collection of goods and the hazards this generates. It covers the
main areas that cause the majority of injuries and ill-health to workers, including:
?Workplace transport;
?Slips & trips, and;
?Musculoskeletal disorders (MSD).
The movement of goods presents us, as health and safety regulators, with the challenge of dealing with a huge
variety of issues. The commercial organisations involved within the movement of goods are diverse including
haulier, third party logistics providers, pallet networks, retailers etc, with some very large companies,
thousands of small businesses and the self-employed. The movement of goods is more than just trucks on the
road with a large proportion of accidents happening at the delivery/collection sites that are often not directly
under the control of the company making the delivery or collection. Communication and cooperation problems
can arise due to the many organizations involved in the movement of the goods, and this can also lead to
difficulties in effectively managing health and safety.
(Source H&S Executive UK 2008)
The barrier should ALWAYS! be moved with care and attention. The products are very heavy individually
as well as a whole. You should not attempt to move this or any other products by unapproved handling
methods.
Transport and Handling.
D
3250

D210 Dual height access post
Std tip support
D3250 Automatic Barrier
Safety/Lower Loop
Auto exit Loop
Shown below is a typical installation of a D3250 Automatic barrier for a single entrance.
Control - Dual height Card access entry, Loop safety/lower with Auto loop exit.
Shown above is a very basic layout, There are many types of layouts available such as
Separate entry/exit barriers, Twin Barriers for larger span roads and many more.
General Layout.
D
3250

General Layout Foundation drawing.
D
3250

1
When delivered, the barrier will arrive
On a pallet. Make sure you check
Before you sign! Take care when
Unpacking not to damage the barrier.
Once the barrier has been lifted onto the plinth,
Align the pole arm adaptor with the centre of
The tip support. Ensure both barrier and tip
Support are level ready for bolting down.
2
Component Identification and Notes:
You should check that you have received the following in your order as they are referred to throughout this
manual (note this can change per barrier spec i.e. manual components are different from automatic):
Barrier Cabinet
c/w Pole Arm Adaptor
End Rest Pole , if over 6m then it will have
Strainer wire attached to it.
Box of bits C/w
4 x M16 parabolts
4 x M12 parabolts
2 x M6 x 90 pole bolts
1 x cabinet key
O and M manual
O&M Manual
Revision 1.2
Follow the steps below for Installation.
Please note all installations should be carry out by a competent person and all electrical
Connections should be made by a qualified electrician.
Guide to Physical Installation.
Top View
Level
D
3250

3 4
Remove Both Barrier covers using the keys provided
And place the Covers somewhere safe to prevent them
getting damaged. Then using An SDS Drill and M16
drill bit Drill one of the rear fixing holes And knock in one
of the M16 Bolts supplied. You can remove the control
Cabinet to gain access to the fixing holes below it, to
Do this remove the M8 nuts fixed at the rear of the
Panel.
Now make sure all cables are through the duct and
Routed where they need to go (e.g mains cable to
The Isolater.) Then after checking the barrier is
Still in line and level proceed to drill and bolt in the
Rest of the fixing bolts. Once all bolts are in make
Sure they are tightened down.
Guide to Physical Installation. (Cont)
Unwrap the pole very carefully and slide the pole
onto the pole arm adaptor. Using a 6.5mm HSS
Drill bit now drill through both the Pole and the
adaptor at the same time and fit the M6 x 90 Cap
head bolts supplied.
Note - if the pole has boom lights/maglock make
sure you connect these before fitting pole.
5Now the barrier is fully bolted down with the pole on,
Manually wind the barrier in the fully raised and
Lowered positions to ensure everything is correctly
In line.
6
D
3250

7
Notes area
Now connect all Induction loops, Mains power and
Any other accessories you have using the
Connection diagram on page 8. Once you have
Everything connected you can then power up and
test. You must check that all safety accessories
Work correctly first and then move on to testing any
Access control fitted. Below shows a basic keypad
Entry, auto exit and loop lower/safety system.
Depending on pole length you may now be required
To adjust the limit switches if the pole is not finishing In the
desired position. You will see the two Limit strikers on the
main shaft that operate the limit Switches. These are what
you may need to adjust, For example if the pole is stopping
short of its tip Support in the lower position then you will
need to Back the lower striker off so it hits the switch later
Allowing the pole to travel further. Depending on what
handing the barrier
Is depends on which limit switch does the raise or lower.
You will clearly see which one you need to adjust by
looking
At the position of the barrier to the pole.
Make sure to check all your connections and the barrier is earthed correctly. Also ensure the barrier
covers are on correctly and the safety switch is operated. Now fill out the commissioning certificate
on the Next page.
9
D
3250
Guide to Physical Installation. (Cont)
8
earth product
Notes area

We certify that the system covered by this certificate has been commissioned satisfactorily.
Site Name
Site Reference
Installation Commenced / /20
Completion
Engineers Installing
Commissioning
Equipment Fitted
Handover Date
Part 2. Existing Installation Items not covered under warranty/ This certificate:
Installers Name
On Behalf of
Address
Signature
Date of Signing
Position
Part 3. Certificate Signing off Section
Client Name
On Behalf of
Site Address
Signature
Date of Signing
Position
D
3250
Commissioning Certificate.
Table des matières

















